ENCLOSURE 1:

 According to the above plan, SBDMC leases the current idle roof to the solar manufacturer, and replaces the “roof rental
income” with a monthly electricity payment of 20% as the benefit of the case (calculated based on the average monthly
electricity cost of USD 1,696.09 in 2018, Will save electricity (USD 339.22 yuan / month).

ENCLOSURE 2:

 The Guanyin No. 1 Plant maintenance project includes the following items
Project Maintenance Frequency
Roof leak check 2 times / year
Solar module 2 times / year
Direct AC Box 2 times / year
Converter 2 times / year
Surveillance system 2 times / year
Trucking / pipe 2 times / year
Cleaning system 2 times / year
High-voltage equipment (Transformer, disconnector, relay) 2 times / year
Meter box 2 times / year
Environmental Facilities (Including sunshine meter and
grounding system) 2 times / year
1 time / year, the degree of dirtiness of the
Module cleaning video module must be increased
Troubleshooting When the power generation efficiency is
abnormal
Maintenance cost NTD400 / KW (tax excluded) per year
ENCLOSURE 3:
 The maintenance period must cover at least the contract period (15 years). Based on the Guanyin No. 1 factory
maintenance freight standard, the cost of the SBDMC construction capacity is estimated to be USD 1,333. The current
manufacturer's offer. This standard requires confirmation of maintenance details. 【Note】

 The goal should include cleaning of solar modules to ensure system efficiency (PR). [Note]: NTD400 x 100kW / exchange
rate 30 = USD 1,333.

ENCLOSURE 4:
 The module brand
determines whether the
manufacturer can
guarantee for 20 years
(enterprise
Sustainability).

 The higher the power  Module performance


(W), the higher the depends on the design
efficiency and materials of the
module. It is
recommended to use a
module with a power of
320Wp or more.
ENCLOSURE 5:

Suggestions for building solar energy manufacturers -4) Others

 Manufacturers' NAMKOO and HANARGY's proposals are technically feasible. However, it is difficult to directly compare the
assumptions of the installation cost, module power generation efficiency, and sunshine hours, so manufacturers are required
to provide explanations and reasons to evaluate on the same basis.

 According to the SBDMC plan, the construction cost will not be the primary consideration, and the focus should be on the
quality of the module and inverter. The pros and cons, the quality of the manufacturer's construction, and whether the
follow-up maintenance is complete should consider the construction quality and the “durability life” of the material
specifications as the first consideration.

ENCLOSURE 6:

Proposals for Building Solar Energy Vendors -4) Others (Continued)

 Does not accept only the solar system foundation or the area covered by the solar system, and the range of roof
waterproofing. The entire roof area should be covered, and the roof waterproofing items should be included in the warranty
scope.

 Transparency of actual power generation to ensure that the electricity generated by the solar system during the contract is
sold first to SBDMC use.
ENCLOSURE 7:

Proposals for Building Solar Energy Vendors -4) Others (Continued)

 Building registration Taiwan has established solar energy specifications, which have different specifications based on their
registered names. For example: "Agriculture, animal husbandry, forestry, aquaculture, Homeland Security Land "," A, B, C
Building Land "," Residential Area, Commercial Area, A Type of Industrial Area,"B-type industrial zone", etc., if the solar
energy equipment is located in the suspected illegal construction of iron sheet or there is suspected illegal construction or
unprotected rain in the surrounding area, proof documents or cut-offs of legal building materials are required..

 Status of the building roof according to the original condition of the building, if there is any water leakage or damage to the
building, the handling method shall be agreed in advance.

 Details the range of solar energy on the roof of the building, provide structural calculations, drawings and technician visas.

When evaluating the installable system capacity of the roof area, it is necessary to consider whether there are objects on
the roof site that cause module shading, such as daughter walls, water towers, roof protrusions, trees, nearby buildings, etc.
Does the installation of solar equipment affect the structure of the original building and base piles, power generation,
aesthetics and legality.
ENCLOSURE 8:

Proposals for Building Solar Energy Vendors -4) Others (Continued)

 Solar-related insurance (typhoon, flood, fire, earthquake, theft, and business interruption). Regarding typhoons and
earthquakes, the structure must be certified by a structural technician before construction, and it is determined that it can
resist typhoons of general strength and earthquake. Windstorms, fires, and lightning strikes that exceed the intensity will be
protected against damage caused by natural disasters through insurance.

 During the construction and power generation period, no personal or financial damage shall be caused to the SBDMC or a
third party. (Such as: water leakage, natural disasters, damage to buildings, damage to equipment). The term of the
contract is long and there are many uncontrollable factors. It is necessary to clearly regulate the property owner and the
owner of solar energy equipment. Separation of powers and responsibilities to avoid future disputes.

 After the contract expires, the SBDMC has the right to decide to restore the roof to its original state or continue to use it. If
the SBDMC chooses to restore the building to its original state, there is no need to bear any decommissioning costs. If the
SBDMC chooses to continue to use solar equipment, the solar energy factory must ensure normal operation and the
equipment is free of defects. Electrical efficiency.

 Contracted purchase and sale price billing method. The term of the contract is long. Currently, it is purchased from solar
construction companies at an average monthly electricity price of 80% in 2018. If the electricity price is revised down,
SBDMC will incur losses. Therefore, it is recommended that the average monthly electricity price in 2018 be 80% as the
upper limit of electricity price. The electricity price will be revised in the future. The electricity price after the revision shall
be used as the pricing standard.