PROJECT TITLE: TWO STOREY RESIDENTIAL BUILDING

LOCATION: BRGY. TABAWAN, CALBAYOG CITY


OWNER: JONATHAN A. OROT

ITEM NO. DESCRIPTION % of TOTAL


I EARTHWORKS
II STRUCTURAL CONCRETE
III REINFORCING STEEL BARS
IV CARPENTRY WORKS
V MASONRY WORKS
VI TRUSS AND ROOFING
VII PLUMBING WORKS
VIII CEILING WORKS
IX DOORS AND WINDOWS
X ELECTRICAL WORKS
XI PAINTING WORKS
XII BUILDING ACCESORIES
% of TOTAL UNIT QUANTITY UNIT COST AMOUNT
cu. m.
cu. m.
sq. m.
kg
sq. m.
sq. m.
L.S.
sq. m.
sets
L.S.
sq. m.
pcs
PROJECT TITLE: TWO STOREY RESIDENTIAL BUILDING
LOCATION: BRGY. TABAWAN, CALBAYOG CITY
OWNER: JONATHAN A. OROT

QUANTITY TAKE-OFF
EARTHWORKS COMPUTATION

Area = 240 sq. m.


A. Clearing ang Grabbing

Column Footing ( 20 pcs )


Volume = 1.5 m x 1.5 m x 1.5m = 3.38 cu. m.

Total Vol. = 20 x 3.38 cu. m. = 67.6 cu. m.

Wall Footing
Total Length = 80 m
Total Vol. = 80 x 0.8 x 0.35 = 22.4 cu. m.
B. Excavation

Septic Tank (1pc)


Vol = 1 x 3.5 x 2 x 2.2 = 15.4 cu. m.

Total Volume of Excavation


= 67.6 + 22.4 + 15.4
= 105.4 cu.m.

Total Area = 135 sq. m.


Total Vol. to be Filled = 135 x 0.4 = 54 cu. m.

Backfill
Footing = 1.5 x 1.5 x 1.5 x 20 = 67.6 cu. m.