You are on page 1of 2
AINTSILA DEVELOPMENT PROJECT PROJECT NO: JI-2045 REQUEST FOR INSPECTION fete Petrofac Py [PROJECT No: Ji-2045 - AinTsila Discipline: Pipeline Coating IRFI No : RFI-2045-LEAD-PL.O6H |Sub-Contractor: LEAD Contracting & [Trading La, ‘ArealLocation: 14” LPG Export Pipeline [Sub System No: NA cs, ald a Intervention |_S¢_| PIUL [IGARENE| ARH ate of inspection: 18 [Time of inspection: 08:008M is a Points H | w [ RW na | InP No: PAOAC-PLN-200-38177-6 [ITP Rem Wo: 1042 TTR No: ITR No: JI-2048- V.O103A Rov.0 linspoction Activity/Deseriptior lLead Inspector : Kribes Ar joliday test on Pin Brazing temporary points at KP-488 KP-508 KP-52 & KP-52 & KP-53. inspection Item/Tag Number: lorawing & Rev No: — linden (CHECKED & READY FOR INSPECTION 5 ‘Sub: Contracor- Construction etrfac- Consnution Name Khaled Demis Kawtesh Sholy Contact Mobite No: | 0697737677 L\\ aa ss Bh Date & Time 48-07-2021 15:00 18-07-2021 VU 1s70 FOR QUALITY CONTROL DEPARTMENT USE ONLY inched Gho-ael ‘Subconvacor @C oan ISARANE QC i RECENEDEY (CHECKED BY GG RECEIVED BY RECEIVED BY ‘Nome Emad Kamel Emad Kamel Sway 1 Fichelehoure_| Contact MobiieNo: | 0659577: a at ex Signature sacs ae Date atime 1e-Ohg9et 18-07-2021 Blows _| Fon HOLD Repon: YES O)_ NOL BE ‘Action: YES O)_NOUI Date: INSPECTION RESULTS (Tick as aplicablo) ACCEPTABLE (Aa PARTIALLY ACCEPTABLE (PA)O Fl on HOLD (H)D CANCELLED (¢) 0 REJECTED (R) 0 NOT READY FOR INSPECTION (NR) © REASON FOR CANCELLATIONNOTREADY FOR INSPECTIONIREJECTION “Tincomplete Work insufficient documents attached 3: Repesledlunnacazsary RFI “No aston for RFI on Hold '5No Power Supply avaiable at ste ‘EPTW not available 7: Safety lesuee § Teal Grow nat vibe 9: Test Equpment not valle 10- Materiel nol a podtasheséawing | 11-Unactonabe Test PoceausoResut | 2-Vaaton of TP 12-Poor Workmanship [14'spe sation Tnsalaton not as per araning 16- Other CommentsRemans| KNepEceD AWD ActEyED Punch List Number (f any) “To be signed off by Construction Supervisor or QC Inspector based on responsibilties indicated on the approved ITPs. Inspected By Subcontractor QC | *Pi fac Construction! ac Company QC Name Kxbes Awi choke) Fade | 4 lbp unread Signature wit, TE RFI Closed on I= FF Sodh— 14. 0 FL. Le AMR SA TR Can be signed off or not7 P-Partal e-compitp P-OAC-PRO-200-38152 ~ ANNEXURE 9.2 NIA: Not Applicable © AINTSILA DEVELOPMENT PROJECT are wk PROJECT NO: JI-2045 p f sa etrofac er rene REQUEST FOR INSPECTION [PROJECT Nor J-2045-AinTeila [Diecpline: Pipeline Coating IRFLNo : RFL204SAEAD.PLOGS0 bub.Sonactor: LEAD Contracting Iaratocaton 24” Gas Export Piptine [Sub System No: WA [Date of tr ston: 19/07/2021 [Time of I tion: 07:00AM. intervention |_SC_| PIUL USARENE| ARH inspection of inspection inter cca cect Ne ITP Nox PGAC-PLN-200-96177.8 [NP Hem Nor 10,2 TTR NosITR No: JI-2045- V-0109A Rev.0 inspection Activity/Description: Holiday test on Pin Brazing temporary points at KP-08 & KP-10 & KP-11 and KP-12 lLead inspector : Kribes Amine |inspection ltem/Tag Number: JOrawing & Rev No: — CHECKED & READY FOR INSPECTION ‘Sub Gontractor- Construction Patrofac- Construction Name Khaled Demis. awhe: Contact Mobile No: | 0697737677 Se Coe Dato & Time 46-07-2021 15:00 18-07-2024 FOR QUALITY CONTROL DEPARTMENT USE ONLY ‘Submitted by Daca net ced Sbconator 6 oot, |_SARANE as ; id RECEIVED BY [CHECKED By ac RECEIVED BY RECEIVED BY Name Emad Kamel Sy Th Fichelghovra ‘Contact Mobile No: 59 a dé ce f tam 1: et Date &Timo . 18-07-2021 ARMA RFlon HOLD Report: YES (NO Date: ‘Action :YES (NOI Date: INSPECTION RESULTS (Tikes appcabe) ACCEPTABLE (ya PARTIALLY ACCEPTABLE PAJO RFI on HOLD ()9 CANCELLED (6) REJECTED ()O NOT READY FOR INSPECTION (NR) © ;REASON FOR GANCELLATIONNOTREABY FOR NSPEGTIONREJECTION Tan Wor sufi documents acted 2 Repenedumecssry I “No acon or RFT on Ne Powe: Supply wala a PTW net aval 7. Saey sves Test Grew ot avelate Tet Equpment nat avalatia 10- Material spar Gea shetiring | -Unaroepate Test ProoeaieResit | Vian fT 12-Por Wokarstip 14S. Voiion {Sinsation rela pr 15: Other Comments/Remarks: Punch Uist Number (fany): NSPECARD AND AcceyTED - “To be signed off by Construction Supervisor or QC Inspector based on responsibilties indicated on the approved ITPs. Inspected By Subcontractor QC Company QC Name Ke; Werke natde Signature +5 RFI Closed on 148 5 TTR Gane signed offer net7ZZ c-compitg Z| Praia NIA Not Appieable = P-OAC-PRO-200-38152 — ANNEXURE 9.2

You might also like