You are on page 1of 4
AINTSILA DEVELOPMENT PROJECT PROJECT NO: JI-2045 REQUEST FOR INSPECTION Ml ae wea sarene rey Petrofac 6 PROJECT No: st-2045-AinTaila [Discipline Pipeline Coating IRFINo : RF-2045-LEAD-PLOSSH [Sub-Contraetor: LEAD Contracting & 5 ; ; pus corias [ArealLocation: 4” LPG Export Pipaine [Sub System No: NA i" Se 7 = Intervention [SC _| PIUL [ISARENE] ARH ate of inspection: [Time of inspection: 08:00M ae Ps aad Points H_[-H | RW [NA IITP No: P-QAC-PLN-200.36177-8 ITR No: ITR No: JI-2045- V-0103A Rev.0 linspoction Activity/Deseriptos lLead Inspector : Kribes Amine joliday test on Pin Brazing temporary points at KP-488 KP-508 KP-52 & KP-52 & KP-53 inspection item/Tag Number: JDrawing & Rev No: — ; (CHECKED & READY FOR INSPECTION a Setened ‘Sub- Contractor- Construction Petrofac- Construction Name Khaled Demis Kawtesh Solty Contact Mobite No: | 0697737677 an aiemer Ve) | Date &Time 11-08-2027 / a] | aoe penta 11-08-2021 M08 \as24 Rlon HOLD Report: YES _NOLI Date: Action: YES D_ NOL) Date: INSPECTION RESULTS (Tick a applicable) PARTIALLY ACCEPTABLE (PAJD nea RFIon HOLD (#9 CANCELLED (0) 0 REJECTED (R) 0 NOT READY FOR INSPECTION (NR) D REASON FOR ‘CANCELLATIONINOTREADY FOR INSPECT |ONIREJECTION “Tinsomplote Work insufficient documents atiached 3: Repeaied/unnecessary RFI “No ection for RFI on Hold 5-No Power Susy avalebe at ste [ e-FTW not availabe 7 Salety issues ‘8 Test Crew not available ‘9 Test Equipment not avaiable 410- Matera not as per data sheetcraving | 11-Unacceptabe Test Procadure/Result {12.Violation of TP “13-Poor Werkmanship 14-Spec.Vielation 1S:nstlation not por crewing 16 Other Comments/Remarks: Punch List Number (if an) *To be signed off by Construction Supervisor or QC Inspector based on responsi blilies indicated on the approved ITPs. Inspected By Subcontractor QC *Petrofae Construction / QC Company Qc Name Koibes “Awin Yous iC RFI Closed on IN M (Ak 83 odd Ab 08- BoB TTR Can be signed otter a Compt anal AN Alea P-QAC-PRO-200-38152 - ANNEXURE 9.2 AINTSILA DEVELOPMENT PROJECT PROJECT NO: JI-2045 I | REQUEST FOR INSPECTION SB sarene fete) Petrofac 6 |PROJECT No: JI-2045-AinTsila __[Discipline: Pipeline Coating RFI No : RFI-2045L AD PL.O762 jub- Contractor: LEAD Contracting & |arear ocation: 14” LPG Expor Pipeline [Trading Lt. ‘Sub System No: NA Date of inspection: 1208/2021 ‘Time of Inspection: 08:00AM Intervention Points S6_[ PUL [SARENE] ARH | H | H | RW | NA ITP No: P-QAG-PLN-200-38177-8 ITP Item No: 10,12 ITR No: ITR No: JI-2045- V-0103A Rev.0 inspection Activity/Description: Holiday test on Pin Brazing temporary points at lLead Inspector : Kribes Amine KP-53+270 & KP-53+395 Inspection itemrTag Number: lDrawing & Rov No: — ‘CHECKED & READY FOR INSPECTION ee ‘Contractor- Construction Petrofac- Construction ene Bok RA SAT Contact Mobile Na Signature [soe b— Baise Tine 08-2001 75:00 [wre82008 [see : FOR QUALITY CONTROL DEPARTMENT USE ONLY Received and Checked Subcontractor OC [peotes ISARANE QC ay. RECEIVED BY ‘CHECKED BY GCI REPEIVED Bx RECEIVED BY Name Emad Kamel . | om Qara | Contact Mobile No: Satire a Date &Time 11-08-2¢ 11-08-2021 << 11-08-2021 AANOT \Le24 RFlon HOLD Report: YES D_NOLI Date Teves H-NoU ba INSPECTION RESULTS (rick as appicabe) ACCEPTABLE (yp | PARTIALLY ACCEPTABLE (PA) RFlon HOLD (H)O CANCELLED (0) 0 REJECTED (R) 0 NOT READY FOR INSPECTION (NR) © REASON FOR ‘CANCELLATIONNOTREADY FOR INSPECTIONIREJECTION ‘incomplete Work Zinguicent documents atached ‘3: Repeatediunnecessary RFI “No action for RFI on Hold ‘Ne Power Supply avaiable at ste E-PTW not available 7 Safety issues 8 Tet Crew not available 8. Test Equipment nt available 10. Matera not as per data cheotérawing | 11-Unacooptable Test Procedure sult *2Vielation of TP "8-Poor Werkmanship “4-Spec.Vilation {S-nsalation not as per crewing 16- Other CommentsRemarks Punch List Number (i any): *To be signed off by Construction Supervisor or QC Inspector based on responsibilities indicated on the approved ITPs. Inspected By Subcontractor QC_| “Petyofac Fonstruction / QC Company QC Name Keibes \Aminl Aah RAD pohw/ ca sianatre Lg ao Rrieiauea ol THAIN Je 8 40. ogee TTR Can be signed off or not? P-Partal Completa 57 P-QAC-PRO-200-38 152 — ANNEXURE 9.2 NIA: Not Applicable C

You might also like