ASSIGNMENT 2

Gas Transportation & Storage (SKPG 3213)

Tenaga Nasional Bhd would like to construct a power plant named Kuala Langat Power Plant using
natural gas as a fuel. Tenaga Nasional Bhd had approached you to provide them the information
needed. You are required to select a best possible route taking either from existing pipeline system’s
block ML209 or TO 235 as a city gate station. Based on your selection and sketch;

a) Determine

City Gate:

Pipe length:

No. of road crossing:

No. of river crossing:

Suggested R.O. W. width:

Suggested Class Location:

Suggested Maximum Operation Pressure:

Suggested Pipe Material:

Suggested Code of Practice:

Provide reason at every selection and suggestion


ML 209

Senai
Airport

TO 235

Power Plant Cemetery

River

Skil : 1 cm : 5km

b) Discuss the construction methods of the pipelines

c) Discuss the method of pipelines protection system

d) Identify and determine the buoyancy control that required for the pipeline