You are on page 1of 1

Assignment 4

Industrial visit to gas transmission and distribution system has been done. In the visit they went to a few
places such as city gate, metering station, odorization station, and service station and LPG manifold
storage system. You are required to provide a detail report about a design of gas pressure regulator
based on any one of your selected place (visited place).

Note:

Submission date – Week 15

You might also like