FLANGES MANAGEMENT P06-B Project No. Project Title Facilities INFORMATION Test Package No Test Pressure System no. Test Medium Sub System Test Duration Location Test Date INSPECTION / TEST OK N/A P/L No Verify the check sheet P06-A ( Flanges Alignment) and P09-A (Bolt 1 tensioning/Tourqing) have been completed and approved Correct bolts and gaskets are installed at all flanges joints. Bolts are 2 torqued / tensioned to correct specification and certified All the flanges have been tagged, identified in data based ensure that the following items are corrected. All of Flanges data: Flange connection number. Drawing number. Isometric Line Number. Sub-system No: Alignment Check (date and signature). Cleanliness Check after hydrotest or flushing (date and 3 signature). Gasket type and rating. Bolt type, diameter and length. Brand of lubricant applied. Used tool (number and type). Torque value or tensioning pressure (when applicable). Date of execution. Name of the operator. PETRONAS CARIGALI KETAPANG II LTD
INSPECTION TEST RECORD (ITR) - B
FLANGES MANAGEMENT P06-B COMMENT(S) AND ADDITIONAL INFORMATION
COMPLETED BY VERIFIED BY ACCEPTED BY
Designation QA/QC Engineer PCK2L Inspector Commissioning Engineer Company PGN Solution PCK2L PCK2L Name Signature Date