With reference to above we are pleased to submit our offer in line with your requirement.
Yours faithfully,
Forbes Marshall Pvt. Ltd
Hernando Moreno
International Operations
+573154597558
hmoreno@forbesmarshall.net
Customer : Maria Luisa Sugar
Project : Combined Desuperheating station System
End User : Maria Luisa Sugar
Offer No. / Date : FM / 85180016 / PPH R0 Dt.15 May 2018
Subject : PRDS Station
Techno-Commercial Offer :
End Qnty
Rating / Material Of
Sl. No. Item Description Size Rating Connecti Type Description Make (Nos/Mtr
Sch Const.
on )
Valve Complete with E/P type FM Positioner,
Flanged,
1 Combined PRDS Valve 1 300 Schd. 80 A216 WCB Globe Valve Pneumatic Diaphgram Actuator, Top Mounted FMPL 1
RF
Handwheel, SS316 Tubing, AFR Gauges, etc.
Flanged,
2 Inlet Isolation Valve 1 300 Schd. 80 A216 WCB Gate Valve - FMPL 1
RF
Flanged,
3 Outlet Isolation Valve 1 300 - A216 WCB Gate Valve - FMPL 1
RF
Flanged,
4 Bypass Isolation Valve 1 300 Schd. 80 A216 WCB Globe Valve - FMPL 1
RF
Flanged,
5 Safety Valve 1x2 300 - A216 WCB Full Lift Type Set Pressure - 31.5 barg FMPL 1
RF
FMPL
7 Water line 1 - - Schd. 80 ASTM A106 Gr B Seamless - 1 Lot
Approved
Bypass Isolation Valve for Socket
8 1 800 - ASTM A105 Globe Valve - FMPL 1
Waterline Weld End
Socket
9 Isolation Valves for Water Line 1 800 - ASTM A105 Globe Valve - FMPL 4
Weld End
Socket
10 Strainer for Waterline 1 800 ASTM A105 Y Type - FMPL 1
Weld End
Technical Notes :
- End connection of the station will be Flanged RF
- Minimum Instrument air pressure considered as 4 BarG. Kindly make a note of same.
- No Panel has been offered for controllers, please make a note of same
- Refer attached Sizing sheet for detailed of desuperheater and Control Valves
- Complete Station / Equiments will be Hydrotested and all reports shall be provided for Review and Records.
- Note that no special Testing is been considered for any Valves or items mentioned above. In case of any specific testing requirement kindly confirm the same.
- Temp sensor to be located at a distance of 12 mtrs from point of water injection. Hence, the same shall be loose supply. Bypass line to be mounted horizontally.
- Recommended ground clearance of 1000mm for the PRDS station is to be maintained.
Currency : US Dollars
Delivery : 18-20 weeks from the date of receipt of Techno-commercial clear Purchase Order & Receipt of Advance.
Drawings & ITP will be submitted within 2 weeks from date of Purchase Order
Warranty Period : FORBES MARSHALL hereby warrants and guarantees that all GOODS supplied under this PURCHASE ORDER shall conform in
every respect to this PURCHASE ORDER and shall be of new, unused and good materials, design, and of the first class
workmanship, and shall be free from all defects, including, but not limited to, defects of design and workmanship. At
PURCHASER's request, FORBES MARSHALL shall repair and/or replace on a priority basis, free of cost to PURCHASER any part of
GOODS that fails in normal use and service under proper operation, because of defective parts, faulty design or workmanship
within eighteen (12) months from the date of commissioning by PURCHASER or within thirty six (18) months from the date of
dispatch of the GOODS whichever is earlier.
inlet temperature DegC 343.0 250 343.0 250 C.I 19.0 kg/h
density kg/m^3 12.0 12.0 C.II 6.0 kg/h
t2 DegC 250.000 250.000 C.III kg/h
t-sat. p1 DegC 237.600 237.600
t-sat. p2 DegC 183.1 183.1
requ. kv m^3/h 0.780 0.230
capacity travel 65% 64% 20% 18%
pred. sound flash./cavit. 66 <60
velocity valve outlet/pipe m/s 42.2 42.2 12.8 12.8
remark
Pipe Size In 1 inch Shut-off 35 bar
& Schedule Out 1 inch Sched80 Type Pneumatic Act.
LINE
kvs/charact./direct.
fix trim
leak-cl./balanc. IV-metal / -
Air Set
NA
painting std.
ext. attenuator
extra
Sol. Val.
NA
painting
ext. attenuator
extra NA
Sol. Val.