Professional Documents
Culture Documents
SparQ DISASTER
RECOVERY PLAN
SparQ Disaster Recovery Plan
________________________________________________________________________
Introduction 2
How to use this plan 2
Objectives 2
Scope 2
Assumptions 2
Changes to the Plan/Maintenance Responsibilities 2
Recovery Teams 4
Purposes and Objectives 4
General Information 4
Recovery Team Assignments 4
Personal Notifications 4
Team Contacts 4
Departmental Recovery Teams 4
DRP Coordinator 4
Emergency Response Team 4
Disaster Recovery Team 4
Recovery Procedures 5
Purpose and Objectives 5
Disaster Recovery Strategies 5
Disaster Recovery Procedures 5
Authorization in crisis 5
SparQ Disaster Recovery Plan
________________________________________________________________________
Introduction
Objectives
The objectives of Disaster Recovery Plan are to develop a clear responsibilities, measures,
and procedures to recover SparQ IT infrastructure, manufacturing process, communication,
and business operation in the event of emergency circumstances. The emergency
circumstances include all the event and activities in which affecting the ability of SparQ to
perform its business process.
Scope
To recovered and ensuring the continuation critical business process from the emergency
situation. It also includes all the responsible individuals and their roles, contact information,
strategies, procedures, and authority in the emergency situation.
Assumptions
The viability assessment of this plan is based on the following assumptions:
1. A complete DRP that proven to be feasible and tested to ensure its process is able to
recover the SparQ business process and data centre at the back-up site.
2. Technical department will identify the necessary equipment and location for
relocating the business operation.
3. Properly maintained and updated the DRP
4. Each department need to cooperate and follow the DRP to make sure the SparQ
business process could be continued.
Introduction
In this section, the Business continuity strategy would be describing the strategy to maintain
a business continuity process in the event of emergency situation disrupting the company
operation. It is assumed that each department that has their own critical business process
develop their own Business continuity plan that roughly similar with this report but with
addition of recovery procedures and resources needed are customised for the respective
department.
2. Activation process
In this phase, the Business Continuity Plan would be commenced. This phase would
continue until the alternate site is fully functional, all of the critical business functions
are established, and data process equipment such as computer, server, etc is
available and restored. In this phase, there are several activities that needed to be
SparQ Disaster Recovery Plan
________________________________________________________________________
execute such as: Notified the recovery teams, interim procedures, relocation process,
and re establishment of communication, network, and computer system.
3. Alternate site
This phase begins where the alternate site is fully functional and would continues
until the primary facility it restored. The activities that are needed to be done in this
phase are reducing backlog and normalizing the operation procedures within the
alternate site.
4. Transition process
This phase would be commenced once the primary facilities is ready where all the
necessary process, procedures, resources and activities are ready.
File restoration
The type of file that are include on the restoration categories are as follow:
1. Physical files in the primary location is stored on cabinets and control file room.
2. Any confidential and critical information is stored on the data centre
3. Current work progress
4. Mail
5. Documents related to any project or current work
General Information
Personal Notifications
Team Contacts
DRP Coordinator
Authorization in crisis