Business Blueprint
Document
Plant Maintenance
Business Process
Version 1.0
Date: 12/12/2018
___________________________________________________________________________________________
1
Plant Maintenance Business Blueprint Document
Document History
Document Sign-Off
___________________________________________________________________________________________
2
Plant Maintenance Business Blueprint Document
Signature
___________________________________________________________________________________________
3
Plant Maintenance Business Blueprint Document
Acronyms
___________________________________________________________________________________________
4
Plant Maintenance Business Blueprint Document
Contents
Introduction: Plant Maintenance Business Process ....................................................................................... 7
1.0 General Maintenance Process ............................................................................................................. 11
2.0 Breakdown Maintenance Process ........................................................................................................ 23
3.0 Preventive Maintenance Process ........................................................................................................ 35
4.0 Refurbishment Maintenance Process ................................................................................................. 52
5.0 Calibration Process ............................................................................................................................... 59
___________________________________________________________________________________________
5
Plant Maintenance Business Blueprint Document
Intended Audience:
This document will help:
1. The SI AIR SPRINGS (Operations & Quality team) and IT Team to understand and approve the
requirements and design of the proposed application, as adequate for meeting its stated business
needs.
2. Carbynetech team to design and develop the application using the requirements as the basis, as
well as to plan and manage all project resources thereof.
3. SI AIR SPRINGS team to develop test scenario and test scripts to test the application for
acceptance testing. Carbynetech will define the testing strategy as well as implementation and it
will be addressed in Test Strategy document and in Cut over strategy documents.
4. Carbynetech Team and its maintenance and support team to understand all aspects of the
process, application, and maintain it.
This document states all of the conceptual results of the project Sudarshan defined in their Process
Catalogue. This project results were devised and decided on by the project team and the department
experts from SI AIR SPRINGS during the Business Blueprint project phase.
This is the main concept document of the project. It is supplemented by separate specifications for
custom development.
The content of this document forms the basis and the guidelines for the subsequent Realization phase.
This document aims to describe the future business solution based on SAP S/4 HANA. Both, IT subjects
and organizational issues that are required to understand the situation, are described in it.
___________________________________________________________________________________________
6
Plant Maintenance Business Blueprint Document
This document is prepared to define Plant Maintenance, Utility & Calibration Teams regular activities.
Plant Maintenance, Utility, Calibration, planning and scheduling activities requirements as explained in
the following process:
___________________________________________________________________________________________
7
Plant Maintenance Business Blueprint Document
Scope in Brief
The Business processes related to Plant Maintenance, Utility and Calibration were understood and
redesigned for project ‘SUDARSHAN’ from an end to end perspective cutting across functions and
systems. This approach is key to document, design the system, develop and deploy; And to measure
the process speed, timeliness and accuracy.
___________________________________________________________________________________________
8
Plant Maintenance Business Blueprint Document
___________________________________________________________________________________________
9
Plant Maintenance Business Blueprint Document
Symbol Description
Start / End
Process
Decision
Document
Manual Process
Data
External Process
Auto Process
Data Base
Sub Process
Safety Approval
___________________________________________________________________________________________
10
Plant Maintenance Business Blueprint Document
1. Requirements/Expectations
A brief definition of the process and its requirements.
This process covers the requirement for requests from production/ any user departments placed to
maintenance department. Any visible defect in the machines, which is not causing breakdown, but
important to record and report that defect will be covered through the maintenance request (Corrective
Work) process. This would enable to analyze the machine history, cost and performance.
2. General Explanations
Any general explanations on the process that relate to the customers’ business process. This typically does not include
any SAP specific terms, it should relate purely to the business rules.
a. General request from Production department/any other user department to the maintenance
department in-charge with all necessary details like equipment details &requirement details.
b. Maintenance in-charge checks the available manpower and allocates Mechanical/Electrical/
Calibration technician to the spot for preliminary inspection of equipment/ facility as per
requirement.
c. After analyzing the issue technician forwards the information to maintenance in-charge regarding
the requirement.
d. Estimation of Spares, consumables, man power & tools required for the particular work and the
same will be arranged.
e. In-case of any external agency requirement for getting the work done, the standard external
service requirement procedure is followed.
f. In-case of spares and consumables requirement, the availability is checked in main stores then
reservation indent is made and required spares are collected from store against reservation.
g. If the spare or consumable is not available, the standard procedure of PRQ and purchase is
followed.
h. Once required spares are received, maintenance in-charge will complete the work.
i. Replenishment of spares should be triggered for any maintenance activity.
j. After completion of work, the production/user department will be requested for trial and other
necessary checks to close/ sign-off the Work Permit.
k. Update log book along with the work request form with the details of work done, modification,
spares consumed, down time hours, why-why analysis columns etc.,
3. Explanations of Functions and Events
If there are any special functions or events. This may include process triggers etc.
___________________________________________________________________________________________
11
Plant Maintenance Business Blueprint Document
None
None
Instead of “Work Order Form Number”, an SAP notification number will be a communication tool
between the user department and maintenance department regarding the maintenance requirement for
a particular technical object. Based on this maintenance department creates the “General maintenance
order” where the list of operations and cost incurred will be captured.
7. Description of Improvements
It is important to outline where the business will realize benefits of implementation. Both in its use of software, and
streamlined business processes.
Creation of notification will initiate recording the issues that might influence the process flow of
production and maintaining the technical object history simultaneously which can be accessible from any
location. Cost analysis can be carried out from maintenance orders created
8. Solution in SAP.
Describe how this process will be addressed in the product.
In this General maintenance process, user department creates the General/Corrective maintenance
notification and against the maintenance notifications department creates the “General maintenance
order” if any additional cost needs to be captured.
This business process can be used to plan, execute, and document all the general/corrective
maintenance tasks that arise outside of planned maintenance activities. All the resources used, costs,
and technical details of the maintenance task are recorded centrally and can be evaluated.
1.1 General/Corrective Maintenance Notification Process:
___________________________________________________________________________________________
12
Plant Maintenance Business Blueprint Document
1. Notification Type
2. Short description of the notification
3. Equipment Number
Inputs
4. Priority
5. Reported By
6. Notification Date & Time
1. Planner Group
Validation
2. Work Center
1. Work Duration
Outputs
2. Catalogues ( Object/ Damage/ Cause/ Activities)
___________________________________________________________________________________________
13
Plant Maintenance Business Blueprint Document
Process:
___________________________________________________________________________________________
14
Plant Maintenance Business Blueprint Document
1. Order Type
2. Planning Plant
3. Business Area
Inputs
4. Main Workcenter
5. Activity Type
6. System Condition
___________________________________________________________________________________________
15
Plant Maintenance Business Blueprint Document
1. Planner Group
Validation
2. Work Center
Business Rules Settlement of cost will be posted against technical object cost center
9. Maintenance Planner creates the maintenance work order by clicking on create order against
notification using IW22, IW28 or IW34 transaction of order type ‘ZGEN’
Note: Activity type will help you in segregating different type of activities performed in addition to the
order type segregation assuming the settlement parameters will remain the same.
10. Maintenance in-charge has to assign the “required spare components along with quantity and
stock item category (L–stock-able material or N– non stock-able material).
17. Once required materials are received at the stores from vendor; Stores will issue the good
___________________________________________________________________________________________
16
Plant Maintenance Business Blueprint Document
Create External operation with ‘PM03’ control key against General Maintenance
Entry Criteria
Order Type ‘ZGEN’ with components.
___________________________________________________________________________________________
17
Plant Maintenance Business Blueprint Document
1. Order Type
2. Planning Plant
3. Business Area
Inputs
4. Main Workcenter
5. Activity Type
6. System Condition
1. Planner Group
Validation
2. Work center
Business Rules Settlement of cost will be posted against technical object cost center
19. Maintenance in-charge has to collect & assign required service information under operation tab
by using “PM03” control key against operation line item within the maintenance work order.
20. By entering “PM03” control key, system proposes to enter the external processing information
Entries Required:
- Control Key ‘PM03’
- Service Number
- Text Description
- Quantity with Units
- Gross Price
- Cost Element
- Material Group
- Purchasing Group
- Purchase Organization
Service Masters for the PM Work Orders are maintained in the Material Management BBP/P2P
Proposed service masters are as below
a. Mechanical Services
b. Electrical Services
External processing profile is used in which we can store default values to generate purchase requisitions
from maintenance orders. In each profile, we can store a default value for the following values:
a. Cost Element account
b. Purchasing organization
___________________________________________________________________________________________
18
Plant Maintenance Business Blueprint Document
c. Purchasing group
d. Material group
21. Purchase department will create service PO against the created service PR and after approval PO
will be forwarded to the vendor for required services.
22. Upon receiving the PO vendor perform external service as required, maintenance in-charge has
to assign the permits if required and should get approval from safety department if required.
23. Once external services were completed maintenance in-charge need to confirm the external
services through “service entry sheet” against the service purchase order, as a confirmation of
work done using ‘ML81N’
24. In ‘ML81N’ PO number will be entered & creating service entry sheet, copying & adopting the
services specified in the PO and add additional line items if any
25. After required work is completed and final inspection is completed against the maintenance
work, maintenance user has to confirm all the internal works performed using ‘IW41’ transaction
26. Under Cost Tab in the maintenance work order Planned cost & Actual cost can be reviewed &
check for any pending reservations, PR or PO’s.
27. Order can be closed by assigning the status of “TECO” against the maintenance work order.
28. Finance team will settle the cost generated by maintenance work order to respective settlement
receiver (Equipment Cost center) through KO88/KO8G.
29. Here Finance team will be able to do the settlement in different ways either in partial or in full
or in percentage, depending on the settlement rule defined.
30. After completion of settlement, Finance team has to close the maintenance work order by
assigning the “Business Completion status”. By executing CO99 or IW32 user can assign this
“Business Completion Status”. When orders have Business completion status, system restricts the
further financial postings.
Following the above procedure would enable to capture the maintenance history, cost and performance
of the machines.
Process Steps:
___________________________________________________________________________________________
19
Plant Maintenance Business Blueprint Document
___________________________________________________________________________________________
20
Plant Maintenance Business Blueprint Document
___________________________________________________________________________________________
21
Plant Maintenance Business Blueprint Document
Transaction Description
IW28 Notification list in change mode
IW29 List of General Maintenance Notification
IW38 Orders list in change mode
IW37N List of Maintenance orders
IW29 Notification list in display mode
IW40 Display multilevel orders.
MCI8 Cost Analysis of maintenance orders
User Transaction
Production In-charge IW21, IW22, IW23, IW24, IW29, IW37N
IW22, IW23, IW24, IW28, IW29, IW32, IW33, IW34, IW38, IW37N,
Maintenance In-charge
IW40, IW41, IW42, IW43, IW45, ML81N, MCJB, MCI7 & MCI8
Finance In-charge KO88, KO8G & CO99
Maintenance End User IW23, IW29, IW33, IW37N, IW40, IW41, IW42, IW43, IW45, MCJB,
___________________________________________________________________________________________
22
Plant Maintenance Business Blueprint Document
1. Requirements/Expectations
A brief definition of the process and its requirements.
The process addresses the Malfunction (breakdown) request from user/production departments. This
Business Process is used to report, perform and document maintenance tasks that arise unplanned and
which affects the production process. All the resources used, costs and technical details of the
maintenance task are recorded centrally and can be evaluated.
2. General Explanations
Any general explanations on the process that relate to the customers’ business process. This typically does not include
any SAP specific terms, it should relate purely to the business rules.
Process Requirements:
a. Intimation from operation/ production department when breakdown occurs through mobile.
b. Maintenance in-charge sends technical team to the breakdown spot for preliminary inspection.
c. Inspect the breakdown equipment and inform the maintenance in-charge regarding the same.
d. Estimation of Spares, consumables and man power required for the work were carried out.
e. Check the spares availability in stores department.
f. Checking the required tools and tackles.
g. Intimating the management if any outsourcing required.
h. Intimating the stores to reserve the required spares as per the requirement.
i. If spares are not available, raise the PRQ and inform to purchase and accounts department for
immediate purchase.
j. Intimating safety department for necessary permission / permits.
k. Get the Work Permit released on particular equipment from production and safety department.
l. Collecting all the spares and consumables as required.
m. Completion of breakdown maintenance work.
n. After completion of work, close/ sign-off the Work Permit.
o. Take trial run and hand it over to operations/ production department.
p. Getting the confirmation of work completion from operation and safety department.
q. Updating particular equipment history book for the work done, modification, spares consumed,
breakdown hours, etc. in the Breakdown Maintenance Report.
r. Why-Why analysis of the breakdown and actions taken to avoid/prevent such breakdowns in
future were updated and submission to concerned authorities at the end of the shift.
___________________________________________________________________________________________
23
Plant Maintenance Business Blueprint Document
None
None
Against the breakdown notification created by user department, maintenance department creates the
“Breakdown Maintenance order” to plan and execute the maintenance activities and also tracks the
costs incurred during the maintenance which can be accessible from any location, instead of updating in
excel files.
7. Description of Improvements
It is important to outline where the business will realize benefits of implementation. Both in its use of software, and
streamlined business processes.
By following the breakdown process, MTTR and MTBF reports can be generated. Breakdown costs can be
captured; Malfunction analysis can be carried out which can be studied for improvement measures. All
related data can be accessible from any location. Maintenance Work Order itself can be used to raise
reservations, purchase requisitions, permits approvals and cost capturing [Planned vs Actual].
8. Solution in SAP.
Describe how this process will be addressed in the product.
In this breakdown maintenance process, initially production department creates the Breakdown
notification and against to breakdown notification maintenance department creates the “Breakdown
maintenance order” if any additional cost incurrence is there.
___________________________________________________________________________________________
24
Plant Maintenance Business Blueprint Document
1. Notification Type
2. Short description of the notification
3. Equipment Number
Inputs
4. Reported By
5. Notification Date & Time
6. Breakdown Indicator
Tasks Breakdown Maintenance Activities (no costs captured)
1. Planner Group
Validation 2. Work Center
3. Breakdown Indicator
1. Breakdown Duration
Outputs
2. Catalogues ( Object/ Damage/ Cause/ Activities)
___________________________________________________________________________________________
25
Plant Maintenance Business Blueprint Document
Process:
___________________________________________________________________________________________
26
Plant Maintenance Business Blueprint Document
Create Breakdown Maintenance Order Type ‘ZBRE’ with internal operation and
Entry Criteria
assign components & permits (if required)
1. Order Type
2. Planning Plant
3. Business Area
Inputs
4. Main Workcenter
5. Activity Type
6. System Condition
1. Planner Group
Validation
2. Work Center
___________________________________________________________________________________________
27
Plant Maintenance Business Blueprint Document
Business Rules Settlement of cost will be posted against technical object cost center
7. Maintenance Planner creates the maintenance work order by clicking on create order against
notification using IW22, IW28 or IW34 transaction of order type ‘ZBRE’
8. Against created order, Maintenance in-charge has to assign the “required spare components al
ong with quantity and item category (L– stock-able material or N– non stock-able material).
Consumption of Stock-able Components (L –Category):
9. Spare components of L – category (stock-able item) availability need to be checked in stores,
where within the order we have a “Material Availability Check” option which check the
availability of the material in the store and through an informative message.
10. Release (Green Flag) of work order will generate system generated reservation number against
the spare components.
11. Maintenance in-charge disclose the system generated reservation number to assigned
maintenance person for withdraw of spares from respective stores.
Consumption of Non-Stock-able Components (N –Category):
12. If required spares are specific to particular order and management don’t want to update in
inventory (stock) then the material stock item category is assigned as “N”.
13. If the spare component item category is N (non stock-able item) system proposes for “Purchase
Requisition” data, where maintenance in-charge has to enter the items details, quantity, price,
preferred vendor, deliver date, requester details under Purchase Data tab.
14. Releasing the maintenance order (Green Flag) or by perform “activate reservation/purchase
requisition” option within the maintenance order; will generate reservation no. along with “PR-
number”
After procuring the requested quantity, stores will be performing Goods receipt, then the
requested quantity will be directly consumed without updating of inventory account to the
requesting work order or cost center
15. Once required materials are received at stores by vendor; Stores will issue the good through
‘MIGO’ operation to the requester.
16. If required Safety Permits are assigned within the maintenance order itself by the
Maintenance in-charge. And these Permits should be released by Authorized Safety in-charge
against that work order using IPM2 transaction.
17. Once safety permits approval and the required components are received the maintenance team
will perform the required breakdown correction activity.
Incase if any external services are required against the breakdown maintenance, then the assigned
person intimates to respective Maintenance in-charge or Supervisor regarding the requirement. Creation
of maintenance order will ensure that all the maintenance external service and spare components costs
consumed by the maintenance work order are captured for settlement.
___________________________________________________________________________________________
28
Plant Maintenance Business Blueprint Document
Creation of External Service operation with PM03 Control key against Breakdown
Entry Criteria
Order type ‘ZBRE’; components & permits assigned (if required)
1. Order Type
2. Planning Plant
3. Business Area
Inputs
4. Main Workcenter
5. Activity Type
6. System Condition
1. Planner Group
Validation
2. Work Center
___________________________________________________________________________________________
29
Plant Maintenance Business Blueprint Document
Business Rules Settlement of cost will be posted against technical object cost center
18. In the case of external service requirement, maintenance in-charge has to collect & assign
required service details under maintenance order operation tab by using “PM03” control key
against operation line item.
19. And going to the ‘external’ tab purchase related details like price, preferred vendor, deliver
date, requester details will be updated.
Service Masters for the PM Work Orders are maintained in BBP/P2P/11.1 which include service material
group; value class, work conversions helpful in grouping services and reporting. And the Proposed service
masters are as below
a. Mechanical Services
b. Electrical Services
External processing profile is used in which we can store default values to generate purchase requisitions
from maintenance orders. In each profile, we can store a default value for the following values:
a. Cost Element account
b. Purchasing organization
c. Purchasing group
d. Material group
During external processing, a distinction is made between the external procurement of materials and
services, Since both of these procurement processes generally require different data for purchasing like,
purchasing groups, cost elements, material group; So below profiles were proposed for External
Processing of material and services:
20. Purchase department will create service purchase order against the created service purchase
requisition.
21. The Purchase order will be forwarded to the vendor for required services.
22. Upon receiving the PO vendor perform external service as required, maintenance in-charge has
to confirm the external services through “service entry sheet” against the service purchase
order, as a confirmation of work done using ‘ML81N’
23. In ‘ML81N’ relevant PO number will be entered & creating new service entry sheet, copying &
adopting the services specified in the PO and add additional line items if any.
24. After required work is completed and final inspection is completed against the internal
maintenance activities, maintenance in-charge has to update all the internal work confirmation
using ‘IW41’
25. Under Cost Tab in the maintenance work order Planned cost & Actual cost can be reviewed.
26. Order can be closed by assigning the status of “TECO” against the maintenance work order.
Note: When user assigned the “TECO” status, system closes the open reservations and open purchase
requisitions& system restricts the further assignment of spares or services.
Note: System restricts assigning “TECO” if still the Work Permits were not issued or in open condition
27. Later Finance team has to settle the cost generated by maintenance work order to respective
settlement receiver through KO88/KO8G.
28. Here Finance team will be able to do the settlement in different ways either in partial or in full
or in percentage depending on the settlement rule defined.
29. After completion of settlement, Finance team has to close the maintenance work order by
assigning the “Business Completion status”. By executing CO99 or IW32 user can assign this
“Business Completion Status”. When orders have Business completion status, system restricts the
___________________________________________________________________________________________
30
Plant Maintenance Business Blueprint Document
Process Steps:
___________________________________________________________________________________________
31
Plant Maintenance Business Blueprint Document
___________________________________________________________________________________________
32
Plant Maintenance Business Blueprint Document
21. 1
Time Maintenance user has to confirm Maintenance IW41/IW42
8
confirmation the Internally performed work user
hours by the Internal technicians
22. Inspect & After completion of external Maintenance ML81N BBP/P2P
confirm services, maintenance user has to In-charge
External create service entry sheet to
Services confirm the external service
24. 2
Cost FINANCE team has to settle cost Finance KO88/KO8G BBP/FI
3
distribution / incurred on maintenance work Department
Settlement order to respective cost receiver
objects (equipment cost center)
25. 2
Business After completion of Settlement, Finance IW32/CO99 BBP/FI
4
completion of FINANCE team has to Close the Department/
maintenance maintenance work order to rectify Maintenance
In-charge
work order the unauthorized financial
/Supervisor
postings against the order.
Transaction Description
IW28 Notification list in change mode
IW29 List of Maintenance Notification
MCJB MTTR / MTBR report
MCI7 Breakdown Analysis
___________________________________________________________________________________________
33
Plant Maintenance Business Blueprint Document
User Transaction
IW22, IW23, IW24, IW28, IW29, IW32, IW33, IW34, IW38, IW37N,
Maintenance In-charge
IW40, IW41, IW42, IW43, IW45, ML81N, MCJB, MCI7 & MCI8
Finance In-charge KO88, KO8G CO99
IW23, IW29, IW33, IW37N, IW40, IW41, IW42, IW43, IW45, MCJB,
Maintenance End User
MCI7 & MCI8
___________________________________________________________________________________________
34
Plant Maintenance Business Blueprint Document
1. Requirements/Expectations
A brief definition of the process and its requirements.
2. General Explanations
Any general explanations on the process that relate to the customers’ business process. This typically does not include
any SAP specific terms, it should relate purely to the business rules.
Process Requirements:
a. Preparation of preventive maintenance (PM) schedule for Equipment wise/ location wise based on
time or performance.
b. Preparing the equipment wise PM checklist, man power, spares and consumables requirement and
time scale for each PM work.
c. Intimating production department well in advance for releasing the equipment for preventive
maintenance as per schedule for production planning feasibility.
d. Receiving the approval dates of equipment availability from production department.
e. Checking the previous PM work history for a particular equipment to check the problems faced
while performing PM.
f. Check the availability of manpower, spares, consumables, tools and tackles as per PM check list
plan.
g. Sending the request well in advance to stores for reserving the spares and consumable for the PM
of an equipment as per schedule. After that based on requirement of spares and consumables
send the request to stores for issuing the material after approval from head of the department.
h. If the spares or consumables are not available in stores as per plan to carry out the PM of
particular equipment the MRN will be issued by user department with all required data like
specifications, quantity required, delivery requirement etc as per standard procedure of MRN.
i. Then the standard procedure of MRN and purchase will be followed.
j. Requesting the Production department and Safety Department for releasing the Work permit on a
particular equipment to carry out the PM.
k. Getting work permit released from Production department and Safety department for particular
equipment.
l. Noting down the Start and End time of PM work.
m. Completion of all the PM works for equipment as per the PM checklist for particular equipment.
n. After completion of PM work hand over equipment to production department to check the
performance of equipment if required.
o. Closing of Work Permit for normalizing the isolations and as a token of work completion
___________________________________________________________________________________________
35
Plant Maintenance Business Blueprint Document
None
None
Updated maintenance plans of both time based and performance based are configured for Preventive
Maintenance Process and configuring automated communication to the user department along with the
preventive maintenance order generation through background scheduling is implemented.
7. Description of Improvements
It is important to outline where the business will realize benefits of implementation. Both in its use of software, and
streamlined business processes.
Effective planning, configuring early order generation and communication trigger will benefit the
production planning and allow the plant maintenance department to meet the process targets
8. Solution in SAP.
Describe how this process will be addressed in the product.
Basically Maintenance Plans are used to schedule the maintenance activities as per the predefined cycles
with the required scheduling parameters.
For executing the Preventive Maintenance Process, Maintenance Planner has to define the below master
data elements
1. Characteristics
2. Measuring Points/Counters
3. Maintenance Strategies
___________________________________________________________________________________________
36
Plant Maintenance Business Blueprint Document
In standard SAP, following types of maintenance plans are available. As per the requirement users can
group or categorize their plans as per below defined standard plan types.
Note: Time- Base where the units of cycle will be days / Hours / Weeks/ Months & Performance-based is
where the units of cycle will be a Measuring Counter with Units like KM, HR, Lit, Kg, No.
A single cycle plan is the simplest form of maintenance plan, where a plan is having fixed cycle without
any intervals. A cycle can be either a time-based or performance-based in which plant maintenance
team specify the cycle at which the maintenance plan should be executed.
Example: Change of Transformer oil & inspection annually, where 1 year will be the cycle with unit ‘YR’
Plant maintenance team can use strategy cycle plans to show "Complex maintenance plans". Plant
maintenance team can create a strategy plan by assigning a maintenance strategy in which plant
maintenance team have defined the maintenance cycles of same units, intervals and hierarchy which for
a package. A maintenance strategy contains general scheduling information and can therefore be
assigned to as many maintenance plans and maintenance task lists as required.
Example: To use a strategy plan if different maintenance tasks for same machines are due in different
cycles: Oil filter change every 1 month, oil change every 3 months, overhauling every 12 months.
A maintenance plan where maintenance cycles with different units of cycle will be used to trigger the
preventive maintenance. And measuring counters of a technical object will be assigned against these
cycles. Cycle set is created with desired combination of cycles and is assigned against the maintenance
plan.
Example: You can define the interval for an oil change for every 10,000 km or every 6 months
This type of maintenance planning is not based on a maintenance strategy. The cycles for a multiple
counter plan are linked with either an OR operation or an AND operation. For an OR operation, a
maintenance order is generated for the earliest possible planned date.
If maintenance is due, for example, every 100 tons produced or every 50 operating hours or every two
weeks, the decisive factor is which occurs first. For an AND operation, a maintenance order is generated
for the last planned date. If maintenance is due, for example, every 100 tons produced or every 50
operating hours or every two weeks, the decisive factor is which occurs last.
Process:
1. The requirement to create the Preventive Maintenance Plan will make the Maintenance Planner to
identify the recommended frequency at which Preventive Maintenance for a particular technical
___________________________________________________________________________________________
37
Plant Maintenance Business Blueprint Document
3. Considering creation of Strategy Based Plan, Maintenance In-charge has to create a new
maintenance strategy using ‘IP11’ transaction and define the packages
Entries Required:
Entries Required:
Entries Required:
7. And for single cycle plan a fixed cycle is enough which can be either a time based cycle or
performance based counter.
8. Now as part of creating a Maintenance plan, Maintenance Planner has to prepare the task lists (set
of operation) as per manufacturer guidelines; Tasklist can be created for three different
purposes.
IA01- Equipment Tasklist (a group of specific operations applicable for dedicated equipments)
IA05– General tasklist (a group of common operations applicable for various equipments)
IA11- Function Location Tasklist (a group of specific operations applicable for dedicated
function locations)
___________________________________________________________________________________________
38
Plant Maintenance Business Blueprint Document
9. If a Maintenance Strategy is selected at the Tasklist header level this gives an additional option to
select the operations against desired package
10. Required components can also be maintained against the operation line item with quantity; which
will trigger material reservation up on generation of preventive maintenance order.
11. Maintenance plan is created using ‘IP01’ transaction where Maintenance Planner has an option to
select the type of plan he was about to create whether it might be a single cycle plan or strategy
based plan or multiple counter plan; And depending on the requirement suitable plan will be
selected.
12. Maintenance Plan has three section
a. Plan Header: Cycle length with units (time based or counter based), Scheduling parameters-
Call horizon, Schedule duration, OR - AND, Sort field, maintenance plan category
b. Maintenance Item: technical object, order type, planner, priority, activity type, settlement
rule & workcenter
c. Tasklists; list of operations to be performed during preventive maintenance
Note: For INDUSTRY, following Maintenance Plan categories & Number Ranges were proposed
Note: Order Type and Number Ranges were defined for Preventive Maintenance Order.
Order
Maintenance Plants Description
Type
A100 ZPRE Preventive Maintenance Order
___________________________________________________________________________________________
39
Plant Maintenance Business Blueprint Document
From To
10000000 9999999
A100 ZPRE
13. Additional maintenance items can also be assigned either by using create new or by using
assign more items which were created using ‘IP04’ transaction.
14. Background scheduling will keep generating the preventive maintenance orders as per the plans
created and scheduled; the scheduled plans can be viewed using the transaction ‘IP24’ to
forecast the preventive maintenance planning and communication the same to production
planners or supervisors of respective plants.
___________________________________________________________________________________________
40
Plant Maintenance Business Blueprint Document
Process Complete Preventive Maintenance Order as per the proposed plan and to
Objective capture the cost involved in Internal preventive maintenance processing
1. Planner Group
Validation
2. Work Center
___________________________________________________________________________________________
41
Plant Maintenance Business Blueprint Document
Business Rules Settlement of cost will be posted against technical object cost center
1. Maintenance planner can forecast the scheduled plans using ‘IP19 & IP24’ transactions & the same
can be published across the plans.
2. Maintenance planner regularly will check the schedule list of plans using ‘IW38’ transaction &
the ‘Planning’ tab in the Calibration Order screen will let you know the planning details like Plan
number, call no., tasklist group and immediate previous call.
3. As per the schedule the Preventive Maintenance Orders will get generate and upon release of the
equipment for the preventive activity maintenance planner will allocate the man power to
perform preventive maintenance activity.
4. Safety Permits are assigned within the maintenance order itself by the Maintenance in-
charge and should get it released by Authorized Safety in-charge against that work order using
IPM2 transaction.
5. Once the order is released the components assigned against operations which were flown in from
the tasklist will generate reservation numbers.
6. Store persons will issue materials against Preventive Maintenance Order (Reservation number).
Note: Declaration of the component in the tasklist will help the material planning department to
maintain the required quantity by the date of requirement.
Note: Validation for Order Release Indicator showing whether the permit must have been granted before
the maintenance order is released or before completion of the maintenance order
7. Up on issuing the ‘Work Permits’ as per the proposed operation in the preventive maintenance
order the preventive activities will be performed
8. Components were consumed where applicable and returned to store where not consumed
9. All the operation performed will be confirmed using the transactions ‘IW41- Individual operation
wise confirmation or IW42-Collective operations confirmation’
30. After completion of confirmation against internal operations (IW41/IW42) & Goods receipt
(MIGO) maintenance planner will check the costs to for verification of planned vs actual and set
preventive maintenance order status to "TECO" .
___________________________________________________________________________________________
42
Plant Maintenance Business Blueprint Document
Process Trigger the Preventive Maintenance Order as per the proposed plan and to
Objective capture the cost involved in External preventive maintenance processing
1. Planner Group
Validation
2. Work Center
___________________________________________________________________________________________
43
Plant Maintenance Business Blueprint Document
Business Rules Settlement of cost will be posted against technical object cost center
Incase if any planned external services are required against the preventive maintenance, the tasklist
included in the plan need to be adopted with ‘PM03-control key’ against operation and enter the
external processing information
External processing profile is used in which we can store default values to generate purchase requisitions
from maintenance orders. In each profile, we can store a default value for the following values:
a. Cost Element account
b. Purchasing organization
c. Purchasing group
d. Material group
1. Once the preventive maintenance order with external service operation is generated by the
system; upon release of the order a PR number against the external service will be generated
which will be forwarded to the purchasing department.
2. Purchasing department will create a PO against the PR and upon approval; PO will be forwarded
to the external service provider.
3. Up on receiving the PO the External service provider will schedule to perform preventive
maintenance activity against production department date of release of technical object.
4. After completion of the service activity, maintenance planner creates the service entry sheet
(ML81N) against the service purchase order in full.*
Incase if these external service were on (AMC) Annual Maintenance Contract basis, a pre approved PO
along with Contractual Outline-agreement of a line item with ‘n’ Quantity will be created by the
purchase department; where ‘n’ indicates the number of invoice submission for a contractual period
___________________________________________________________________________________________
44
Plant Maintenance Business Blueprint Document
FIG: Preventive Maintenance AMC Process Flow Chart – [Order External Process]
Process Trigger the Preventive Maintenance Order as per the proposed plan under ‘AMC’
Objective and to capture the cost involved in External maintenance
1. Planner Group
Validation
2. Workcenter
___________________________________________________________________________________________
45
Plant Maintenance Business Blueprint Document
Business Rules Settlement of cost will be posted against technical object cost center
5. Each time AMC Preventive maintenance orders get generated, a remainder will be sent to
External Service Provider who has to perform the required services as per contract.
6. Maintenance planner assigns Permits against the maintenance order (IW32) if applicable & gets
the Permit approval (IPM2) from the Safety In-charge before services were performed by the
external service provider as per the AMC.
7. After completion of the service activity, maintenance planner creates the service entry sheet
(ML81N) against the service purchase order in Partial Quantity.*
Note: The External Services required for the Planned Maintenance are maintained in the operations of
the task lists. Based on the Control key “PM03” in the task list operations, the system generates the
Service Purchase Requisition number.
Note: If any of the Equipment is sent for external services to outside to the vendor site using the
Returnable gate pass, then the equipment will be repaired by Vendor and will be delivered back with the
same Returnable gate pass issued by the Stores department along with Vendor’s Invoice & Delivery
Challan
8. After completion of confirmation against external operation service entry sheet (ML81N) & Goods
receipt (MIGO) maintenance planner will check the costs to for verification of planned vs actual
and set preventive maintenance order status to "TECO" .
9. After completion of TECO controlling person will settle the cost to cost center of respective
technical object as per standard settlement rule
10. After completion of Settlement FI person will close the order as business completion and while
doing that if system throw an information or warning message then FI person will check the
details and close the order
Process steps:
___________________________________________________________________________________________
46
Plant Maintenance Business Blueprint Document
___________________________________________________________________________________________
47
Plant Maintenance Business Blueprint Document
14. Material issue System generated order have Stores IW32 / IW33
the reservation numbers as per Department / IW38
assignment in Maintenance task
list
15. Spares withdraw Stores department issue spares Maintenance MIGO BBP/P2P
against system generated Team /3.2.14.0
reservation numbers of 1 & 02
scheduled maintenance order
If Work Permits are Required for Maintenance Work Order
16. Assign Work Before performing the Work, Maintenance IW32
Permits Maintenance In-charge must In-charge
ensure required Permits were
issue against the Work Order
17. Issue of the Issue of Work Permits by safety Safety, IPM2 Print
Permits officer after inspection of work Production & Form
space, tools & safety Maintenance Required
In-charge
requirements
Operations against Maintenance Work Order
18. Perform the Maintenance team has to Maintenance External
maintenance perform the maintenance Team activity
activities as per scheduling
19. Confirmation of Maintenance In-charge will Maintenance IW41 / IW42
worked hours confirm the performed worked In-charge /
hours against scheduled Supervisor
maintenance order
20. Complete the Maintenance In-charge has to Maintenance IW32 Restrict
work order complete the work order by In-charge / TECO if
assigning the “TECO” status in Supervisor PO
Confirma
work order to restrict the
tions are
further assignments of spares open
and external services against
completed work order.
21. Cost settlement FINANCE team has to do the FINANCE KO88 / BBP/FI/3
settlement of incurred cost of Department KO8G
scheduled maintenance work
order to respective cost
receiving object
22. Close the work FINANCE team has to close the FINANCE IW32 / CO99 BBP/FI/3
order performed scheduled Department/
maintenance work order which Maintenance
is settled and have “TECO” In-charge
status
___________________________________________________________________________________________
48
Plant Maintenance Business Blueprint Document
___________________________________________________________________________________________
49
Plant Maintenance Business Blueprint Document
11. Get the After releasing system Maintenance IW32 / ME5K BBP/P2P
Purchase generates the purchase planner / ME5A
requisition requisition number against the
number scheduled maintenance order
12. Approve the As per the approval / release Maintenance ME54N BBP/P2P
Purchase strategy, authorized person will planner
requisition approve the purchase
requisition
13. Create the Purchase department creates Purchase ME21N BBP/P2P
Purchase Order the PO against the service PR Department
14. Call the third As per the machine availability, External
party service maintenance planner has to call activity
person the third party service person
If Work Permits are Required for Maintenance Work Order
15. Assign Work Before performing the Work, Maintenance IW32
Permits Maintenance In-charge must Planner
ensure required Permits were
issue against the Work Order
16. Issue of the Issue of Work Permits by safety Safety, IPM2 Print
Permits officer after inspection of work Production & Form
space, tools & safety Maintenance Required
In-charge
requirements
Operations against Maintenance Work Order
17. Takeover the Maintenance planner has to External
machine under take over the machine under activity
maintenance maintenance and handover it to
maintenance users to perform
the maintenance activities
18. Perform the Service person perform the External
activities maintenance activities along activity
with the maintenance users
19. Handover the maintenance users has to External
machine to handover the machine to activity
production production department to take
users the trail run
Work Confirmation against Maintenance Work Order
20. Confirm the Maintenance planner has to Maintenance ML81N BBP/P2P
third party confirm the third party service planner
service by creating the service entry
sheet against the Service PO
with full confirmation*
21. Completion Maintenance planner has to Maintenance IW41 / IW42
Confirmation confirm the time and spares user
consumption against the
maintenance order
22. Assign the Settlement rule by default Maintenance IW32
settlement rule standard rule will be created planner
against technical object
costcenter
___________________________________________________________________________________________
50
Plant Maintenance Business Blueprint Document
Transaction Description
IP01 Creation of Maintenance Plan
IP10 Schedule Maintenance Plan
IP16 Display Maintenance Plan
IP19 Scheduling overview Simulator
IP24 Scheduling overview list
IP30 Deadline Monitoring
User Transaction
SI AIR SPRINGS MD Team IP01, IP02, IP03, IP10, IP16, IP19, IP24 & IP30
Maintenance Planner IP02, IP03, IP10, IP16, IP19, IP24 & IP30
Maintenance End User IP03, IP10, IP16, IP19, IP24 & IP30
___________________________________________________________________________________________
51
Plant Maintenance Business Blueprint Document
None
1. Requirements/Expectations
A brief definition of the process and its requirements.
Refurbishment process is used for refurbishing the high valued components it might be an Electrical,
Mechanical and Calibration component or assembly of a machine. SI AIR SPRINGS requirement is to
keep track of these assemblies, its movement and status of these components and valuation.
2. General Explanations
Any general explanations on the process that relate to the customers’ business process. This typically does not include
any SAP specific terms, it should relate purely to the business rules.
Process Requirements:
a. During the process of any breakdown assemblies or sub- assemblies of the equipment will be
replaced with the new assemblies or spare assemblies.
b. The dismantled assemblies will get collected at the stores.
c. Later these dismantled assemblies will be sent for repair/refurbishment by the maintenance
department to external services with reference to purchase order.
d. In some cases, these activities will be performed by the internal maintenance team.
e. Required components for refurbishment will be drawn from the stores.
f. Purchase requisition will be generated for non stocked spare components
g. Once PO is generated and forwarded to the vendor and up receiving the required spares the
refurbishment of the dismantled assembly will be carried out.
h. Update the activities performed and costs involved in the particular equipment history book for
the work done, modification, spares consumed, breakdown hours, etc.,
i. Refurbished spare will be sent back to store & will be consumed when required
j. Cost calculation of the maintenance / refurbishment work done is recorded.
If there are any special functions or events. This may include process triggers etc.
Refurbishment will be planned by the Maintenance Planner depending on ‘to-be repaired’ stock
None
None
The refurbishment process will be standardized and the dismantled assembly movement will be triggered
at every level
7. Description of Improvements
It is important to outline where the business will realize benefits of implementation. Both in its use of software, and
streamlined business processes.
With standardizing the refurbishment process and assembly & Dismantle process, particular assembly
valuation will be captured and the movement is also recorded. And depending on the valuation user can
make a decision whether to go for a new assembly by scrapping the old assembly or to go for
refurbishment process
8. Solution in SAP.
Describe how this process will be addressed in the product.
A refurbishment order process is a maintenance order process using which refurbishing (servicing /
repairing) damaged Equipment’s or Equipment Assemblies can be carried out.
The Assemblies will be having both equipment view and material view which will be integrated in the
master data. Condition based valuation is activated against the refurbish-able assembly or material.
All the Assembles Material Master need to be created with activated valuation type, serial number and
pricing to enable to keep track of the specific assembly or material.
___________________________________________________________________________________________
53
Plant Maintenance Business Blueprint Document
Entry Criteria Create Refurbishment Maintenance Order Type ‘ZRFR’ with internal operation.
1. Order Type
2. Planning Plant
3. Business Area
Inputs
4. Main Workcenter
5. Activity Type
6. Material with serial number
1. Planner Group
Validation
2. Work Center
___________________________________________________________________________________________
54
Plant Maintenance Business Blueprint Document
Business Rules Settlement of cost will be posted against component or assembly refurbished
Process:
1. Maintenance Planner has to create the “IW81”-Refurbishment maintenance order against the
damaged Equipment Assembly (material code & serial no. if applicable)” for which the
refurbishment activity need to be carried out.
2. Once the order is created & saved system generates the reservation number for the maintenance
team to collect the material from stores.
3. Any additional components will be reserved against the refurbishment maintenance order against
the operation along with item category (L– stock-able material or N– non stock-able material).
6. Incase if the spare component item category is N (non stock-able item) then maintenance in-
charge has to perform “activate reservation/purchase requisition” option within the
maintenance order; which makes system to generate the purchase requisition number for non-
stock items.
If required spares are specific to particular order and management don’t want to update in
inventory (stock) then the material stock item category is assigned as “N”.
When stock item category is assigned as “N”, system generates the “Material Purchase
Requisition” up on reservation.
After procuring the requested quantity, stores will be performing Goods receipt, then the
requested quantity will be directly consumed without updating of inventory account to the
requesting work order or cost center
7. Once required material are received from the receiving stores whether it may be stocked or non-
stocked items and the refurbishment activity will be performed by the maintenance work center.
4.2 Refurbishment Maintenance Order External Services Process (PM03- Control Key):
___________________________________________________________________________________________
55
Plant Maintenance Business Blueprint Document
1. Order Type
2. Planning Plant
3. Business Area
Inputs
4. Main Work center
5. Activity Type
1. Planner Group
Validation
2. Work Center
Business Rules Settlement of cost will be posted against component or assembly valuation
___________________________________________________________________________________________
56
Plant Maintenance Business Blueprint Document
8. If incase of any external service is required, then maintenance in-charge has to collect & assign
required service information under operation tab by using “PM03” control key against operation
line item within the maintenance work order.
9. By entering “PM03” control key, system proposes to enter the external processing information
Entries Required:
- Control Key ‘PM03’
- Service Number
- Text Description
- Quantity with Units
- Gross Price
- Cost Element
- Material Group
- Purchasing Group
- Purchase Organization
8. Depending on the material group system picks the Cost element in cost element field
automatically from the configuration.
9. After assigning the service information maintenance in charge has to perform “activate
reservation/purchase requisition” option within the maintenance order; which makes system to
generate the service purchase requisition number against the refurbishment work order.
10. Purchase department will process the Purchase requisition to release the PO after approvals and
forward it to vendor/third party services.
Note: Service Masters for the PM Work Orders are maintained in the Material Management BBP
P2P/ Proposed service masters are as below
a. Mechanical Services
b. Electrical Services
External processing profile is used in which we can store default values to generate purchase requisitions
from maintenance orders. In each profile, we can store a default value for the following values:
a. Cost element account
b. Purchasing organization
c. Purchasing group
d. Material group
During external processing, a distinction is made between the external procurement of materials and the
allocation of complete order operations to vendors.
Since both of these procurement processes generally require different data for purchasing, for example,
different purchasing groups or different cost element accounts, we should also define different profiles
for them.
11. The equipment or assembly, which ever need to be refurbished will be sent to external service
provider (along with or without the required spares depending on the scenario) with a returnable
gate pass with list of item details and reference purchase order number.
12. Once the external service provider completes the job, the equipment or assembly will be
delivering at the receiving stores along with the returnable gate pass copy and delivery challan
13. After completion of refurbishment of the equipment or the assembly whether it might be
internal or external maintenance in-charge has to confirm the internal operation using “IW41” &
external operations “ML81N” respectively
30. Once the repairs works were completed the Refurbished material need to be sent back to store
using transaction ‘IW8W’ as ‘V2- Repaired’ valuated material or assembly
Entries Required:
- Refurbishment Order Number
- Storage location
31. After completion of confirmation against internal operations (IW41/IW42), external operation
service entry sheet (ML81N), Goods issue/ receipt (MIGO) & Goods return (IW8W) maintenance
planner will check the costs to for verification of planned vs actual and set the preventive
maintenance order status to "TECO" .
___________________________________________________________________________________________
57
Plant Maintenance Business Blueprint Document
32. After completion of TECO controlling person will settle the cost to cost center of respective
technical object as per standard settlement rule
33. After completion of Settlement FI person will close the order as business completion and while
doing that if system throw an information or warning message then FI person will check the
details and close the order.
Note: When orders have “CLSD” status systems will not allow to-do the financial transactions.
Note: Here system calculates the variance of refurbishment order cost.
Maintenance order total cost – material master price of “repaired assembly”.
When stock updated “Material master price” posted to Inventory account” and in cost
settlement, if any variance is there that one also settled or posted to inventory account.
Transaction Description
IW28/ IW29 Display list of Notifications
IW38/ IW37N/ IW40 Display list of Refurbishment Orders
MMBE Display list of Stock Overview against material
User Transaction
IW21, IW22, IW23, IW24, IW28, IW29, IW31, IW81, IW32, IW33, IW34,
Maintenance In-charge
IW38, IW37N, IW40, IW41, IW42, IW43, IW45, IW8W, MMBE & ML81N
Maintenance End User IW23, IW29, IW33, IW37N, IW40, IW41, IW42, IW43, IW45, & MMBE
Finance In-charge KO88, KO8G & CO99
___________________________________________________________________________________________
58
Plant Maintenance Business Blueprint Document
1. Requirements/Expectations
A brief definition of the process and its requirements.
SI AIR SPRINGS requirement is to capture the Scheduled frequency dates of the Instrument
Calibration/Inspection activities. SI AIR SPRINGS would also like to have proposed schedule to generate
calibration plan.
2. General Explanations
Any general explanations on the process that relate to the customers’ business process. This typically does not include
any SAP specific terms, it should relate purely to the business rules.
Process Requirements:
None
None
___________________________________________________________________________________________
59
Plant Maintenance Business Blueprint Document
For SI AIR SPRINGS, Calibration process is proposed to be performed in both Planned using Preventive
Maintenance call object and Unplanned by creating Calibration Order
7. Description of Improvements
It is important to outline where the business will realize benefits of implementation. Both in its use of software, and
streamlined business processes.
Calibration order type will help in keeping track of the instrument or gauges history and working
condition. The costs incurred in calibrating the instrument will help to keep track on the cost invested
for testing and services if any, which also helps to make a decision on the investment to go for a new
gauge or instrument.
8. Solution in SAP.
Describe how this process will be addressed in the product.
The Calibration activity is the process of calibrating the working condition of the Measuring instruments
or Metrology instruments or Production Resource Tools, to make sure their working condition is in its
original state of operation and these are carried out periodically by creating a maintenance plan and
assigning the plan to relevant technical object (Instrument or gauge); For executing the Calibration
Process, Maintenance Planner has to define the below master data elements
1. Characteristics
2. Master Inspection Characteristics
3. Sampling Procedure
4. Task List
5. Maintenance Strategies
6. Maintenance Plans
Whether it is a planned or unplanned activity, an order type of “ZCAB” is selected for calibration process
by the Calibration planner to initiate the calibration process. Oder type “ZCAB” is configured so as to
generate “Inspection Lot” with reference to the technical object selected.
In case of scheduled Calibration process a maintenance plan with “CO- Calibration Order” category will
be used to generate the “ZCAB” order types on time or performance based cycles; which generates
technical object relevant “inspection lot”.
Based on the scheduled dates, the calibration work orders are created automatically with an
inspection lot as per the maintenance plan.
Once the Calibration order is created, inspections are carried out as per the master inspection
characteristics and the test results can be recorded and order can be closed.
IN SI AIR SPRINGS Calibration activities of measuring instruments are taken care by External
Service only.
Note: For INDUSTRY, Order type & number ranges for Calibration Process are defined as below
___________________________________________________________________________________________
60
Plant Maintenance Business Blueprint Document
ZCAB Internal
1000000 9999999
Note: For SI AIR SPRINGS, group plants maintenance activity types for Calibration Process are defined as
below
Note: Following Maintenance Planner Groups are defined for SI AIR SPRINGS.
___________________________________________________________________________________________
61
Plant Maintenance Business Blueprint Document
Complete Calibration Order as per the proposed plan & Master Inspection
Process
Characteristics defined and to capture the cost involved in Internal preventive
Objective
maintenance processing
1. Planner Group
Validation
2. Work Center
1. Usage Decision
2. Work Permits closure (if assigned)
3. Work Duration Confirmation
Exit Criteria
4. Actual vs Planned Costs
5. Settlement Rule
6. Update Instrument Serial no. (if replaced)
Business Rules Settlement of cost will be posted against technical object cost center
Process:
1. Once the planning of the calibration order is scheduled as discussed in the preventive
maintenance process BBP/PM/3 depending on the cycles calibrations will get generated.
2. Calibration planner can forecast the scheduled plans using ‘IP19 & IP24’ transactions & the same
can be published across the plans.
3. Calibration planner regularly will check the schedule list of plans using ‘IW38’ transaction & the
‘Planning’ tab in the Calibration Order screen will let you know the planning details like Plan
number, call no., tasklist group and immediate previous call.
4. Calibration planner can check the planned calibration order plan details under planning tab of
the order screen.
5. In case if the calibration activity can be performed by the internal calibration team, then
depending on the location of the technical object & safety criticality, Calibration planner assign
work permits against the calibration order (IW32)
6. And these permits need to get the approval (IPM2) from safety officer and production in-charge.
7. Once permits are issued and the calibration order is released & saved where inspection lot is
generated.
8. Calibration results recording could be done using the ‘QA32’ or ‘QA11’ transaction where appropriate
inspection lot is selected with reference to plant, date, material or status.
9. Number of recording depends on the ‘Master Inspection Characteristics’ declared and each
recoding will be validated, as defined in the inspection lot.
10. In case if the result posted were out of tolerance a warning message is issues to check the
posted result.
___________________________________________________________________________________________
62
Plant Maintenance Business Blueprint Document
11. Once results get posted a validation check of results is done where you can ‘Accept’ or
‘Reject’
12. In case if the result posted were out of tolerance and rejected there is an option to cause of the
rejection and raise a notification against the rejection using the option provided.
13. And in the next step ‘Usage Decision’ will be made with the same ‘QA32’ or using ‘QA13’ if we
have different users, where the technical object can be issued a QA decision.
Can be Used
Adjustment Required (Re-Calibration)
Cannot be Used (Scrap)
Complete Calibration Order as per the proposed plan & Master Inspection
Process
Characteristics defined and to capture the cost involved in external preventive
Objective
maintenance processing
___________________________________________________________________________________________
63
Plant Maintenance Business Blueprint Document
1. Planner Group
Validation
2. Work Center
1. Usage Decision
2. Work Permits closure (if assigned)
3. External Calibration Confirmation
Exit Criteria 4. Work Duration Confirmation
5. Actual vs Planned Costs
6. Settlement Rule
Business Rules Settlement of cost will be posted against technical object cost center
Incase if any planned external services are required against the Calibration process, the tasklist included
in the plan need to be adopted.
10. Against corresponding tasklist of the maintenance plan ‘PM03-control key’ will be assigned
against operation and system proposes to enter the external processing information
Entries Required:
Proposed Service Masters for the PM Work Orders are maintained in the Material Management
a. Calibration Services
External processing profile is used in which we can store default values to generate purchase requisitions
from maintenance orders. In each profile, we can store a default value for the following values:
a. Cost Element account
b. Purchasing organization
c. Purchasing group
d. Material group
___________________________________________________________________________________________
64
Plant Maintenance Business Blueprint Document
24. Once the Calibration Order with external service operation is generated by the system; upon
release of the order a PR number against the external service will be generated which will be
forwarded to the purchasing department.
25. Purchasing department will create a PO against the PR and upon approval; PO will be forwarded
to the external service provider.
26. Up on receiving the PO the External service provider will schedule to perform Calibration activity
against production department date of release of technical object.
27. After completion of the service activity, maintenance planner creates the service entry sheet
(ML81N) against the service purchase order.
28. After completion of calibration by external services, a calibration certificate will be issued.
Calibration in-charge needs to update the recording (if required) and usage decision against the
calibration order is posted using in ‘QA32’ or ‘QA11’.
29. If the calibration results were found satisfactory as per the “Master Inspection Characteristics”
the technical object is replaced back; if not object will be replaced with new one & the old one
will be scrapped as per the scrap procedure inconsequence a notification is triggered during
‘Usage Decision’
30. Calibration in-charge will confirm all the related work activities or service activities and settle
them against the technical object.
31. After completion of assignment of settlement rule, Calibration in-charge checks the actual cost
vs planned cost to make sure of any pending reservation, PR’s & PO’s and has to do the "TECO"
32. System status in the Calibration Order and the Inspection lots can be view using the info icon
which explains all the process related activities.
33. Finance department has to settle the cost of Calibration work order to respective settlement
receiver in KO88 / KO8G at the period end;
34. Settlement can be done partially or in full depending on the order status by the time of
settlement.
35. And Finance department has to close the order as business completed while doing the business
completion; if any MIRO postings are still pending then, controlling user has to intimate to FI
person to complete the pending postings.
___________________________________________________________________________________________
65
Plant Maintenance Business Blueprint Document
1. Notification Type
2. Short description of the notification
3. Equipment Number
Inputs
4. Reported By
5. Notification Date & Time
6. Breakdown Indicator (if applicable)
1. Planner Group
Validation 2. Work Center
3. Breakdown Indicator
1. Work Duration
Outputs
2. Catalogues ( Object/ Damage/ Cause/ Activities)
For any unplanned issues, the production user / end user can raise a maintenance notification and if the
issue is related to any measuring gauge or instrument or test equipment a notification with “ZC”
notification type along with relevant technical object will be raised, which initiated the unplanned
calibration process.
1. When any problem observed in any instrument or gauge, production users / end users will create
the notification in IW21 with the notification type as "ZC”.
2. Calibration department keep checking the list of notification requested and the type of
notifications in their respective plants, by executing “IW28”.
3. Once Calibration notification is identified Calibration in-charge assigns the resources and
acknowledge to production request by setting the notification status to release.
4. Assigned Calibration technician will attend the technical object and analyze the Calibration
requirement.
5. If requirement is minor, assigned Calibration technician has to perform the Calibration
requirement as required and update the observations in respective notification along with
analysis information like, Damages, Object Parts & Causes etc.
6. Calibration user has to update Start & End dates & close the notification.
___________________________________________________________________________________________
66
Plant Maintenance Business Blueprint Document
7. In case of any calibration requirement a Calibration order ‘ZCAL’ will be created against
calibration notification
8. As these were not planned orders the tasklist (Checklist) for calibration need to be assigned to
the Calibration order by going to menu option ‘Extras’ –tasklist selection and selecting
appropriate tasklist; (w.r.t selection criteria)
9. Once appropriate tasklist is signed and the order is release the ‘Inspection lot’ gets generated
and a magnifying mirror icon is generated which will direct you to inspection lot
10. Once Inspection lot is generated the results recording, usage decision (QA32) will be done and
the order will be technically completed along with the notification will necessary details
entered.
11. If the calibration results were found satisfactory as per the “Master Inspection Characteristics”
the technical object is replaced back.
12. If the results were not satisfactory Calibration in-charge will replace the test equipment with
new one & the old one will be sent to stores as scrap material valuation.
Incase if any external services are required against the breakdown maintenance, then the assigned
person intimates to respective Maintenance in-charge or Supervisor regarding the requirement. Creation
of maintenance order will ensure that all the maintenance work center hour costs, spares cost or
external service costs consumed by the maintenance work order are captured for settlement.
13. Once the calibrated instrument is received from the External calibrator; the “usage decision”
will be made against the inspection lot generated in the calibration order.
14. After completion of confirmation against internal operations (IW41/IW42), External Calibration
Services (ML81N) & Goods receipt (MIGO) maintenance planner will check the costs to for
verification of planned vs actual and set Calibration order status to "TECO" .
15. Finance department has to settle the cost of Calibration work order to respective settlement
receiver in KO88 / KO8G at the period end;
16. Settlement can be done partially or in full depending on the order status by the time of
settlement.
17. And Finance department has to close the order as business completed while doing the business
completion; if any MIRO postings are still pending then, controlling user has to intimate to FI
person to complete the pending postings.
SAP
Process Step
S. No. Description Performed by Transaction Remarks
Description
/ Function
___________________________________________________________________________________________
67
Plant Maintenance Business Blueprint Document
Transaction Description
___________________________________________________________________________________________
68
Plant Maintenance Business Blueprint Document
User Transaction
IA05, IP01, IP41, IP42, IP43, IW21, IW22, IW23, IW28, IW29,
Calibration Planner
IW31, IW32, IW33, IW38, IW37N, IW40, ML81N, IP10,
IA05, IP43, IW22, IW23, IW28, IW29, IW32, IW33, IW38, IW37N,
Calibration End User
IW40, IP10,
Finance In-charge KO88, KO8G & CO99
___________________________________________________________________________________________