9 That the NOC from the Tree Authority for cutting of : NOC from Tree Authority Attached
trees if any on plot under reference shall be submitted in Additional Documents
to this office.
10 That this development permission shall not be used as : Noted
an instrument to evict the existing occupiers or as tool
for demolition of existing structures on plot under
reference.
11 That out of Total BUA proposed to be utilized for : Noted
residential development, 20% of the same shall be
built for residential tenements having built up area
upto 50 sq mt.
12 That the development of the land shall be carried out : Noted
as per the Notification issued by the U.D. Deptt.
Under No. TPB-4304/2770/CR-312/04/UD-11 dt.
14.05.2007
13 That the remarks for proposed building on plot under : CFO NOC Attached in Additional
reference from C.F.O, S.W.D, Roads & S.P dept. shall Documents and E.E. (SWD)
be submitted to this office. remarks Attached in Additional
Documents
Dy. Ch. Eng.(SP) Dept. Attached in
Additional Documents
14 That the factory permit under Section 390 of MMC : Existing company has been shifted
Act and storage license under Section 394 of MMC and Labour NOC attached in
Act, if any shall be surrendered to the concerned ward additional Documents.
office. Motive Power/ Industrial Electric Supply
connection shall be discontinued from the concerned
Electrical Company; proof thereof shall be submitted
to Building Proposal Deptt. All pending municipal
dues including factory permit / license charges etc.
shall be paid to respective section of Ward Office.
The same shall be complied with before requesting for
commencement certificate (plinth/stilt).
15 That the compliance of conditions of N.O.C from : Attached in additional Documents.
Labour Commissioner, Maharashtra State Mumbai
under no. U/no.LC/NOC/C.S.-169/2010/Desk-7
dtd.6/5/2011; LC/NOC/C.S.-108/2011/Desk-7
dtd.12/8/2011 & LC/NOC/CS. 40/2014/Desk 7/8956
dated 21/6/2014 shall be submitted to E.E.B.P.(E.S)
ward.
16 That the Indemnity bond shall be submitted by the : Indemnity Bond Attached in
owner / developer stating that there will be no third Additional Documents
party interest created due to submission of the said
proposal.
17 That the 25% of the land area admeasuring total : AOS Handing over Process is in
9000.00 sq.mt. shall be kept vacant and handed over progress, if it is not handed over
to MCGM and transferred the ownership on PRC in C.C. shall be restricted to 50% of
the name of M.C.G.M in lieu of FSI/ TDR only, the AOS Area.
before requesting for Commencement Certificate as
per circular u/No. CHE/DP/TAC -01/20279/Gen dtd.
20.10.2014
18 That the clause shall be incorporated in the agreement : Noted will be C/W. Copy of sample
of prospective buyers stating that the segregating agreement is Attached in Additional
distances of proposed development / buildings are Documents
deficient. A copy of sample agreement shall be
submitted in this office of to E.E.B.P(E.S)before
requesting for Commencement Certificate (Plinth /
C.C).
19 That the permission is granted on the basis of : Noted
documents submitted by you and the same shall stand
revoked if they are found to be false/fake/fraudulent.
20 That the owner/ developer shall submit the Regd : Undertaking Attached in Additional
undertaking that “they will not serve purchase notice Documents.
for reservations, D.P road / set back area of D.P D.P. Road has been handed over to
reservation and amenity space in future on plot under MCGM.
reference and will claim benefit only in terms of Setback area of Saki-Vihar road is
TDR/FSI only”. handing over
AOS Handing over Process is
completed possession receipt is
attached in additional document
Shashikant jadhav
DN: c=IN, o=Personal, cn=Shashikant
Laxman jadhav,
Laxman
serialNumber=28d8c972d6fe5f6f07b69
02daebcaee524cb190ed30f1e33cde9c2
dd15f6a34e, postalCode=400080,
2.5.4.20=23dfc78f3eda049d011e197d8
jadhav 0fd9d826f00f3c22d5083ec4cbac65f98c
49be0, st=Maharashtra
Date: 2021.03.19 20:23:09 +05'30'