Professional Documents
Culture Documents
NOTICE
For systems powered from a power distribution box which has a lockout capability, perform
the following steps at appropriate timings in each component replacement procedure:
..........
Turn off and lock out the system power at the main input (Power Distribution Box).
..........
Restore system power.
..........
Special Equipment
• Hoist (46-195700G1)
• Tube Oil
• Candle Stick HV lead Wrench (2215804)
• Tie-wraps
• Kim Wipe
• Functional Check/Adjustment Manual (5116376)
WARNING
MECHANICAL HAZARD!
FAILURE TO HOLD THE GANTRY USING THE AZIMUTH LOCK PIN PRIOR TO REMOVING
COMPONENTS MAY LEAD TO GANTRY MOTION WHICH CAN STRIKE A PERSON CAUSING
INJURY OR DEATH.
CAUTION
BURN/SHOCK HAZARD.
Wait more than fifteen minutes following the last scan before performing the following
procedure.
Hoist Rail
Locking Screw
Fan/Pump Power
Cable Connector
Rotor Control
Cable Connector
M6 Cap Screw
(117kgf.cm)
Mounting Plate
Mounting
Screws (x 4)
(285kgf.cm)
Plate
Screws (x 4)
(285kgf.cm)