CLIENT CHECK SHEET
a,
R Pt Reka Patria Ekaguna MLE PT Peramina EP
FRONT END ENGINEERING DESIGN (FEED)
UNTUK SP BARU DI STRUKTUR LIMAU
Issued By i Mardhani Issue date +: 26 May 2010
Document Number : APTOO1-D-DWG-PI-008 Rev. Number :0
Document Title: PIPING PLAN PIPE RACK Rov. Status: IFB
REPLY FROM CLIENT
Document Status
Please check one ofthe folowing status
1 Approved without Comments
Documents approved ihou any cornea or not and may be continue tthe nee revision stage
[51 Approved With Comments
Document is approved but some noteeamment hes been made tobe incorporated,
May be contin to the next revision stage by inceporatng the commons
(71 Not Approved. Revise and Re-issued with incorporating Comments
Decumant is nat epproved, sal be reissued and incorporating comments
COMMENTS
CHECKED BY :
NAME THLE DATE SIGN40 ate |
Sh q a i KEYPLIN =
E 4 Ye one
3 ; i
Qi
om se
eet ‘ =e |
Mi. TO OWG. NO APTO0}
7
_|L tw70 bivc.INO APTooT-bwe-P-o05
fl
i
|
|
!
|
H
|
i
i
a
007
ss
NO APTOO1-D-DWWG-#-009
eRe phere Pavs|
ha.
|
9
one
MIL TO DWG. NOAPTOOL-DDWEPI-OI2
eeeowee
Saeed ae
2 TS OOM I FOR FEED OEY SL. AC CMRLUEE AY EME Conc 2F HET BEL BEEN ey
ay ore pas
peewee toe anon aay = orm. eek
ziAtf ‘STASIUN MPUL @ARU
em 2g un wor ‘1 STRUKTU® UMA
ammmeret AtS z "7? rescuer = a
= = exe wosann [TE