This inspection and test plan outlines the tasks, acceptance criteria, inspection frequency, and responsibilities for inspecting and testing the retaining wall (DPT Bronjong) construction for the Karaha-GI Garut 150kV transmission line project. Key points include:
- Prepare a job safety analysis and work permit on a weekly basis
- Inspect that the work area is cleaned up properly prior to wall installation
- Verify that galvanized wire is used for the retaining wall
- Check that the wire and stone installation is neat and properly arranged
- Inspections will be conducted by the subcontractor, witnessed by CTI and PGE, and records reviewed by CTI.
This inspection and test plan outlines the tasks, acceptance criteria, inspection frequency, and responsibilities for inspecting and testing the retaining wall (DPT Bronjong) construction for the Karaha-GI Garut 150kV transmission line project. Key points include:
- Prepare a job safety analysis and work permit on a weekly basis
- Inspect that the work area is cleaned up properly prior to wall installation
- Verify that galvanized wire is used for the retaining wall
- Check that the wire and stone installation is neat and properly arranged
- Inspections will be conducted by the subcontractor, witnessed by CTI and PGE, and records reviewed by CTI.
This inspection and test plan outlines the tasks, acceptance criteria, inspection frequency, and responsibilities for inspecting and testing the retaining wall (DPT Bronjong) construction for the Karaha-GI Garut 150kV transmission line project. Key points include:
- Prepare a job safety analysis and work permit on a weekly basis
- Inspect that the work area is cleaned up properly prior to wall installation
- Verify that galvanized wire is used for the retaining wall
- Check that the wire and stone installation is neat and properly arranged
- Inspections will be conducted by the subcontractor, witnessed by CTI and PGE, and records reviewed by CTI.
PT CITRAMASJAYA TEKNIKMANDIRI ITP-PGE-C1.6 01 10 Juli 2016 1/1 Prepared by : Checked by : Approved by : Acknowledged by : Project Name EPCC Jaringan Transmisi 150 kV Karaha - GI Garut (Cilawu) Handono Erif Wari Edi Hariawan
Activity Dinding Penahan Tanah (DPT) Bronjong
Reference CTI – QA/QC Coordinator CTI – QA/QC Manager CTI – General Manager PGE – QA/QC Manager Abbreviations : M Field Inspection or/and Test which is performed by the Subcontractor. W Witness Point of Inspection/Test, is an activity during construction where inspection, R Review of Inspection/Test Record and other Document Inspection/Test Record to be measurement, or testing must take place and documented. submitted only for information. P Issue/provide document H Hold Point is defined as critical steps in the installation and testing process. Otherwise Owner SW Spot Witness, this activity may perform during construction where interim measurements, issue waiving letter, the Project Team cannot proceed to the next work activity until the and/or witness of activity normally take place and documented, prior to final measurement inspection, measurement, or test has been witnessed and approved by the attending parties. or inspection being done.
Person In Inspection/Test Inspection/Test Activity
Task Task Description Frequency Acceptance Criteria Record Notes No. Uraian Pekerjaan Charge Kriteria Penerimaan Rekaman Vendor CTI PGE/ Pusenlis Catatan Frekuensi Penanggungjawab Inspeksi/Peggujian Others 1 Prepare JSA dan Permit to Work HSE PTW issued Approved JSA Approved JSA N/A W R N/A (PTW) per week Approved PTW Approved PTW 2 Completion of works, area yang akan SPV, QC As per Lokasi Visual Chek Documentation N/A W SW N/A dipasang bronjong telah dirapikan. Photo 3 Kawat brojong yang digunakan harus SPV, QC As per Lokasi SNI 03-0090-1999 Hasil Test N/A W R N/A galvanis. 4 Pemasangan kawat bronjong harus SPV, QC As per Lokasi Visual check Documentation N/A W SW N/A rapi dan tersusun Photo 5 Pemasangan batu dalam kawat SPV, QC As per Lokasi Visual Check Documentation N/A W SW N/A bronjong harus disusun rapi dan Photo tidak ada yang melebihi lubang wiremess.