MOCKUP INSPECTION Resp
onsibil
e
- Material Submission Supervisor
Obtain material approval
- Project Specs. QA/QC
- BQ Engineer
Joint inspection and
Supervisor
selection of mockup
area
Proceeding mockup works Supervisor
Carried out inspection according to ITP Supervisor
(Issue Inspection Request Form) QA/QC
Engineer
Fa
Inspection il
Rectify the defect
Pas
s
Proceed for re-
Records results
(signed Inspection Request inspection
Form)
& checklist
CONSTRUCTION SEQUENCE
FLOWCHART
Material Submission (MSA)
Re
jec Reply
Consultant
te
Comments/Change
d
Ap
pr
Method Statement/ITP
ov
Submission
ed
Consultant Reply Comments
Delivery of Material at Site
Checking of delivered material
as per approved material list
Request for Inspection
No
Passed Rectification
Yes
Start Installation Process
Final No
Inspection
End/Filing Records