You are on page 1of 1

Contract No. GE/2020/03 Task Order No.

GE/2020/03-25/SSST-01
Feature / Catchment No. & Location 6NE-C/R45 Shung Shan Sun Tsuen, Truth Church, Yuen Long
Bar Bending Schedule
Bar Schedule No.1 Amendment No. Drawing No. ___________________
* * * * * length + # #
location type
bar no. of no. in total A B C D E/R of each total mass/ total mass
and and shape code
mark size mbrs each no. bar length metre
member
mm mm mm mm mm mm m kg kg
Area A- 1a S1 Y 16 3 2 6 21 200 2700 200 3036 18.216 1.58 28.78
Area A- 1b S1 Y 16 3 2 6 21 200 2700 200 3036 18.216 1.58 28.78
Area A- 2 S2 Y 16 1 24 24 51 500 150 130 130 1400 33.6 1.58 53.09
0.00
Area B- 1a S1 Y 16 3 2 6 21 200 1500 200 1836 11.016 1.58 17.41
Area B- 1b S1 Y 16 3 2 6 21 200 1500 200 1836 11.016 1.58 17.41
Area B- 2 S2 Y 16 1 11 11 51 500 150 130 130 1400 15.4 1.58 24.33

* specified to nearest 5 mm prepared by date checked by date amendments


+ specified to nearest 10 mm Jackson Chau 28/5/2021 Chris Lau 28/5/2021

 specified to two decimal places note : This schedule shall be prepared by the Contractor and submitted to the PM/SM prior to steel bars bending works.
NEC - GEO/CA/41 (28/08/2018)