Professional Documents
Culture Documents
Ma’am/Sir,
Good Day!
We hereby submit this letter in your good office to bill you the amount of TWELVE THOUSAND EIGHT HUNDRED
TWENTY FIVE Pesos Only (PHP 12,825.00), VAT excluded. This amount corresponds on the above mentioned
equipment which was utilized during the actual supply of ready mix concrete. The said mixture herein has been served
in the project site below:
Attached hereby the following information & breakdown for your reference:
1. PILAR ST. – ZCMC BLDG.
Description Rate Charge/m3 Total Volume Served (m3) Total Amount
NOTE: Of PHP 34, 200.00, PHP 21, 375.00 was paid to the HBTS1282R STATIONARY CONCRETE PUMP operator;
the difference of the total amount and the amount paid to the operator makes the withstanding balance of PHP
12,825.00, which is stated above in this letter.
With this submission, we reaffirm our commitment to the terms and conditions as agreed.
Should you have any questions, feel free to contact us at 09052425863 / 0965-165-8020
HENSON L. CARBONILLA
General Manager