You are on page 1of 1

Daily/weekly/monthly/as needed maintenance plan

Operator: month: Inst. Model : DH76 S/N:

DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

DAILY
MAINTENANCE

Check reagents

Check waste
container

Check
Backgrounds

Perform clean
WBC

Perform clean
RBC

Perform clean
Diff. bath

Perform clean
Flow chamber

Perform clean
sample probe

Perform
cleanser soak

Weekly
Maintenance

WBC Channel
Cleanser soak

RBC Channel
Cleanser soak

Check wbc/rbc
chambers area
for any
calcification
and clean as
needed

Clean sample
probe outside
service

Clean input & Remove dust, wipe with 10%


output rack sodium hypochlorite.Then wipe
area with D. Water.

Monthly
Maintenance

Clean and *Remove dust, wipe with 10% sodium hypochlorite.


Decontaminate
analyser outer Then wipe with D. Water.
surfaces.

As needed
Maintenance

Fluidics NEEDED AFTER MAINTENANCE OR CLEANING PROCEDURES DONE ON FLUIDICS SYSTEM INSIDE ANALYZER
initialization

Clean fluidics NEEDED WHEN BACKGROUNDS RESULTS OUT OF RANGE.

Empty fluidics NEEDED WHEN: 1-ANALYZER WILL NOT USED FOR 3- 10 DAYS 2- INCORRECT REAGENTS USED.

*Backgrounds Reference ranges: •WBC ≤ 0.2 •RBC ≤ 0.02 •HGB ≤ 1 •PLT ≤ 10

You might also like