You are on page 1of 1

Daily/weekly/monthly/as needed maintenance plan

Operator: month: Inst. Model : S/N:

DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

DAILY
MAINTENANCE

Check reagents

Check waste
container

Check
Backgrounds

Perform clean
WBC

Perform clean
RBC

Perform clean
Flow bath

Perform clean
sample probe

Perform
cleanser soak

Weekly
Maintenance

WBC Channel
Cleanser soak

RBC Channel
Cleanser soak

Check wbc/rbc
chambers area
for any
calcification
and clean as
needed

Clean sample
probe outside
service

Monthly
Maintenance

Clean and *Remove dust, wipe with 10% sodium hypochlorite.

Decontaminate
Then wipe with D. Water.
analyser outer
surfaces.

As needed
Maintenance

Fluidics NEEDED AFTER MAINTENANCE OR CLEANING PROCEDURES DONE ON FLUIDICS SYSTEM INSIDE ANALYZER

initialization

Clean fluidics NEEDED WHEN BACKGROUNDS RESULTS OUT OF RANGE.

Empty fluidics NEEDED WHEN: 1-ANALYZER WILL NOT USED FOR 3- 10 DAYS 2- INCORRECT REAGENTS USED.

*Backgrounds Reference ranges: •WBC ≤ 0.2 •RBC ≤ 0.02 •HGB ≤ 1 •PLT ≤ 10

You might also like