Project: IVORYWOOD RESIDENCES

Subject: REHABILITATION OF SECONDARY GATE


CONTRACTOR:
TERMS OF PAYMENT: 30% DP, 70% progress Billing (incl 10%retention)
DELIVERY/INSTALLATION DURATION: 60 regular working days
VALIDITY OFFER: 10 days upon receipt of proposal
PROJECT DURATION: 3 months warranty on workmanship
PRODUCT WARRANTY: Engr. Arthur Due & Mr. Romar Castillo
CONTACT PERSON, POSITION: Operations Manager & Asst. Engineer
CONTACT NUMBER: 727-7739 ; 705-1710
MATERIAL LABOR UNIT
DESCRIPTION QTY UNIT TOTAL UNIT COST AMOUNT
UNIT COST COST
GENERAL REQUIREMENTS
Mobilization 1.00 lot
Safety and Security 1.00 lot
Bonds and Permits 1.00 lot
Temporary Facilities 1.00 lot
Board-up / PVC Bluesheet 1.00 lot
Hauling Debris 1.00 lot
CIVIL WORKS
Excavation 7.00 cu.m.
Backfill 6.00 cu.m.
Haulout and Disposal 2.00 cu.m.
Restoration of gate entrance slab 1.00 lot
Gravel 2.00 cu.m.
For Gate Metal Works
50mm x 100mm x 2 mmTHK Tubular Steel 30.00 l.m.
25mm x 25mm 2mm Tubular Steel 57.00 l.m.
For Pesdestrian Gate Metal Works
50mm x 100mm x 2 mmTHK Tubular Steel 8.00 l.m.
25mm x 25mm 2mm Tubular Steel 5.00 l.m.
Miscellaneous
Foot Bolt 4.00 set/s
Pillow Block UCP 207 35mm 3.00 set/s
Slide Gate Latches Barrel Bolt 2.00 set/s
25mm x 50mm Concrete Moulding 2.00 l.m.
50mm x 100mm Concrete Moulding 2.00 l.m.
Concrete Surface Preparation
Rubbed Concreting Works for Column 9.00 sq.m.
Painting Works
For Metal Works
50mm x 100mm x 2 mmTHK Tubular Steel in
38.00
Primer and QDE finish l.m.
25mm x 25mm 2mm Tubular Steel in Primer
61.00
and QDE Paint Finish l.m.
For Masonry Works
Column 9.00 sq.m.
Mouldings 3.00 sq.m.
FOR STRUCTURAL WORKS
Rebars
Column
10mm dia Rebar (use 9m; 14pcs) 78.00 kgs
16mm dia Rebar (use 12m; 4pcs) 119.00 kgs
Footing
12mm dia Rebar (use 10 pcs of 9m) 80.00 kgs
Formworks
Column 13.00 sq.m.
Footing 4.00 sq.m.
Concrete Works (3000 PSI)
Column 1.00 cu.m.
Footing 2.00 cu.m.
AS-BUILT PLAN 1.00 lot
TOTAL
VAT:
DISCOUNT:
GRAND TOTAL