You are on page 1of 1

MARK DESCRIPTION

1 2 3 4 A B C D E 1 2 3 4

APEX OF THE ROOF APEX OF THE ROOF

0.51 0.50APEX OF THE TRUSS


APEX OF THE TRUSS

1.75 1.75

TOP OF THE BEAM

2.70 2.70

8.36 8.36
FINISH SECOND FLOOR LINE
FINISH SECOND FLOOR LINE
0.30 0.30

2.70 2.70

FINISH GROUND FLOOR LINE FINISH GROUND FLOOR LINE

0.40 0.40NATURAL GROUND LINE


NATURAL GROUND LINE

FRONT ELEVATION LEFT ELEVATION LONGITUDINAL SECTION

4 3 2 1 E D C B A A B C D

APEX OF THE ROOF APEX OF THE ROOF

0.51APEX OF THE TRUSS 0.59APEX OF THE TRUSS

1.75 1.67

TOP OF THE BEAM

2.70 2.70

8.36 8.36
FINISH SECOND FLOOR LINE
FINISH SECOND FLOOR LINE
0.30 0.30

2.70 2.70

FINISH GROUND FLOOR LINE FINISH GROUND FLOOR LINE

0.40NATURAL GROUND LINE 0.40NATURAL GROUND LINE

REAR ELEVATION RIGHT ELEVATION CROSS SECTION

PROJECT TITLE: OWNER: SHEET CONTENTS: CADD/DRAWN: REVISIONS SHEET NO.


BETH D. MARBA
JERICO S. CALAWAN BCE 413D - 2292 Two-Storey Residential Building Elevations
CHECKED: NO. DESCRIPTION BY DATE
A 1
CIVILENGINEERING SUBJECT/CODE Cut Sections DATE:
PTR. NO.: REG. NO.: LOCATION:
ISSUED ON: TIN NO.: DESIGNED:
ISSUED AT: ISSUED AT: Purok 6 - Sampao Kapalong, Davao Del Norte 1 1
Page___of___

You might also like