0403-154Mep-ok 5/02/07 9:25 Page 6

Invited Paper
OFFSHORE REPAIR
OF THE IFA 2000 CROSS-CHANNEL
LINK
Xavier BOURGEAT * – RTE ( Gestionnaire du Réseau de Transport et d’Electricité)

Carried out under difficult mete- In the twenty years of operation of


orological conditions, the operation the interconnection, the IFA 160 avail-
to repair the damage sustained by the ability was less than 50%.
IFA 2000 Cross-Channel link showed
the efficiency of the means mobilised
by RTE, in coordination with NGT**. IFA 2000: the second
Seventeen years after the construc-
generation submarine
tion of the interconnection, the
interconnection
“embedding” and “disembedding”
In 1981, joint France – United King-
machine, the repair cable and logistic
dom studies lead to the decision to
means were made operational in
build a DC interconnection with a
fewer than fifteen days. largely higher capacity, embedded over
the entire length of the route between
the two landing points, at a depth pro-
The interconnection tecting it from any mechanical hazards.
between France and The present IFA 2000, the 2000 MW
the United Kingdom France–United Kingdom interconnec-
tion connects the French coast (San-
1961: IFA 160, the first inter- gatte) to the English coast (Folkestone)
connection between France since 1986, the date the Cross-Channel
and the United Kingdom link was put into operation.

In 1982, IFA 160 was removed and,


In 1961, France and the United
at the same time, work on the con-
Kingdom were interconnected for the
struction of IFA 2000 got under way.
first time by a Cross-Channel power
The route, chosen at a more eastwardly
link. Known as IFA 160, the160 MW
location than that of the IFA 160 link, is
direct current submarine interconnec-
in an area where the unconsolidated
tion between France and the United sea bed lent itself more easily to cable
Kingdom was an outstanding achieve- burial.
ment at the time. However, as the sub-
marine cables were simply laid on the The two converter stations located
* xavier.bourgeat@rte-france.com
** National Grid Transco : TSO for sea bed, the considerable development at Bonningues-lès-Calais in France and
England and Wales
of trawling in the English Channel and at Sellindge in England, are respectively
the North Sea led to service interrup- 6.5 km and 17 km from the landing
tions due to frequent damage caused points.
by anchors.

6 E L E C T R A N°213 - Avril 2004


0403-154Mep-ok 5/02/07 9:25 Page 7

I nvited P aper
The four routes of the
IFA 2000 link

Figure 1: Overview of the submarine part of the IFA 2000 link.

The lengths of the submarine routes are IFA 2000: early man-
between 43 km for route 4 and 46 km agement of repair
for route 1. The nominal depth of cable means
embedding is 1.5 metres. On the main
route, the routes are spaced one kilo- In view of the experience acquired INVITED PAPERS
metre apart to limit common modes with the IFA 160 link, the operators
in the event of a hazard. devoted their thoughts to the future ELECTRA is the journal
of CIGRE Members.
availability of the interconnection, well
Nevertheless, a number of
Each submarine route between San- before its commercial operation: even
columns under the section
gatte and Folkestone corresponds to a if the likelihood of cable damage was
‘ Invited Papers ’ are now
pair of cables which was laid either by considered to be extremely low during open to all contributors.
France, or by the United Kingdom. the design studies, the repair solutions This we hope will enhance
According to the terms of the agree- were nevertheless worked out at an exchanges between
ment binding both countries, each early stage. It was decided to provide all players in the area
party owns the submarine routes that for and maintain specific means of trou- of electrical power.
it has laid, from the landing point of bleshooting for the IFA 2000 intercon-
Sangatte up to that of Folkestone. In nection, capable of stepping in at short If in your country you have
addition, each party is responsible for notice and shared between France and information about signifi-
its routes, in other words, it sees to any the United Kingdom. cant events or innovation in
the area of electricity,
necessary repairs, with the cooperation Today, the cable maintenance and
please share this with us.
of the other party if need be. repair contracts are entered into
Your contribution
between RTE, the French transmission
(2 500 words maximum)
The technological choices for the system operator, and NGT, National should be sent directly to
submarine and land cables, as well as Grid Transco, the English transmission the Central Office or to your
for the laying modes, proved fully sat- system operator, on the one hand, and National Committee.
isfactory since commissioning of the between the Offshore works company It will then be forwarded to
interconnection in 1986. The technolo- for the maritime operations and the the Editing Committee.
gies used are based on the mass cable manufacturer for the cable con-
impregnated technique with protective nection operations on the other hand. We rely on your collabora-
armature featuring high peripheral These contracts call for the use of an tion, for which we thank you
mechanical strength. adapted vessel, the nature of in advance.

No. 213 - April 2004 E L E C T R A 7


0403-154Mep-ok 5/02/07 9:25 Page 8

C O N T I N U E D
Invited Paper
which will depend on where the dam- results of this test were extremely sat-
age is located, in other words, on the isfactory and showed that the repair
water depth at this spot. The proce- could be performed under the condi-
dures distinguish faults in coastal nav- tions stipulated in the contracts.
igation areas from those at sea. Tak-
ing into account the regulatory At the same time, the French and
requirements of submarine interven- English operators make sure that the
tions, the sometimes difficult climatic necessary replacement equipment is
conditions in the North Sea, as well as available if required. In all, 32 km of
the extensive range between high and cable, identical to the cables laid, are
low tides along with strong currents, stored in Dunkirk, ready for use at any
may confine diving operations to about time to replace portions of the IFA
four times one hour per 24 hours. 2000 Cross-Channel link in the event
of damage.
In order to improve the means of
intervention under the sea, the embed-
ding and disembedding machines used The damage of March
for cable laying were replaced by more 2003
flexible equipment specifically
designed to carry out repair operations, At 6.12 p.m. on 6 March 2003, the
named MED1 for Embedding and Dis- first bipole of the interconnection
embedding Machine number 1 tripped due to the lack of direct volt-
(Machine à ensouiller et désensouiller age. At that time, the link was
numéro 1), fully remotely-guided from deprived of a transit capacity of
the surface of the support repair craft. 500 MW.

Figure 2: Lowering into the sea of MED1 during repair operations in the spring of 2003. Note the plas-
tic caterpillar tracks and the racket, in raised position, which receives the cable electromagnetic location
system. This machine weighs about twenty tonnes in the air.

In 1990, a full-scale test was con- Upon occurrence of the fault, RTE,
ducted so as to check the ability of the in coordination with its English coun-
human and equipment resources to terpart NGT, immediately undertook
effectively carry out a repair at sea. The investigations to determine the cause

8 E L E C T R A N°213 - Avril 2004


0403-154Mep-ok 5/02/07 9:25 Page 9

C O N T I N U E D

I nvited P aper
of the tripping. The teams that were land, is of a type differing from the
mobilised carefully analysed the submarine cable. The two propaga-
recordings available. RTE technicians, tion speeds and the impossibility of
in collaboration with those of NGT, disconnecting these cables featuring
were able to pinpoint the fault on different technologies, made fault
cable 11 of route 4, the most southerly localisation a more difficult task. The
one of the interconnection (see figure calibration of the speed on the sec-
1). The locating process rapidly ruled ond cable of the pair, was able to
out the French and English under- provide suitable indications, only
ground parts. The fault was confirmed after interpretations, since it
in the submarine part of cable 11, includes a 17 km section of oil-filled
owned by RTE. underground cable in addition to
43 km of mass impregnated subma-
rine cable.
Fast mobilisation of a
project team and Even if we managed to calibrate
equipment the propagation speeds as well as
possible, there still remained uncer-
RTE immediately set up a project tainties as to the exact location of the
structure under the responsibility of fault, and the propagation speed on
the local operating group so as to a similar replacement cable stored in
effectively conduct the cable repair Dunkirk was measured to improve the
operations. This structure involved method.
not only the regional operators, but
also the insulated cable specialists of All these parameters showed that INVITED PAPERS
RTE’s Centre National d’Expertise the fault was located at about 39 km
Réseaux (National Grid Engineering from Sangatte. Using this information ELECTRA is the journal
Centre), fault locating experts, while as a basis, the data concerning the lay- of CIGRE Members.
also associating the English opera- ing and embedding in 1984 and 1985 Nevertheless, a number of
tors. The maritime operator and were analysed and showed that the columns under the section
cable manufacturer were equally arrival at Folkestone was particularly ‘ Invited Papers ’ are now
informed. difficult, the sea bed at this point being open to all contributors.
made up of highly irregular zones (loose This we hope will enhance
exchanges between
In fewer than fifteen days, RTE areas alternating with very hard areas)
all players in the area
brought together a team of 60 peo- making embedding extremely difficult.
of electrical power.
ple, all the replacement equipment An artificial embankment was therefore
and the necessary means of technical built so as to protect the cable in some If in your country you have
intervention. points where it had not been buried information about signifi-
deeply enough. cant events or innovation in
the area of electricity,
Fault localisation please share this with us.
Off-shore repair oper- Your contribution
Echometry is the technique used ations (2 500 words maximum)
to locate the fault. The length of the should be sent directly to
Cross-Channel link and the high Preparations the Central Office or to your
National Committee.
capacitance per cable length, which
It will then be forwarded to
causes high transmission losses for The preparatory stage made it pos-
the Editing Committee.
high frequency pulses, made these sible to find the vessel best suited to
operations difficult. What’s more, the the operations: the non-motorised We rely on your collabora-
English underground cable between barge, which requires a tug and a spe- tion, for which we thank you
Folkestone and Sellindge, which cially-equipped support craft to place in advance.
extends the submarine link to the the anchors.

No. 213 - April 2004 E L E C T R A 9


0403-154Mep-ok 5/02/07 9:25 Page 10

C O N T I N U E D
Invited Paper

Figure 3: View of the barge during the operations at sea. One can see the arm of the crane in down posi-
tion. The cable drum is at the rear with the gantry crane and winding arm. The prefabricated shelters in
the rear house a workshop and the MED1 control station.

A dielectric strength test of the Many dielectric strength tests were


replacement cable, by applying 280 kV carried out up to the beginning of May
for 1 hour, was successfully performed 2003 with the participation of the
prior to its loading. English operators.
Casting off took place in the
evening of 11 April 2003 for a cross- Cable re-embedding and
ing that was to last about ten hours. service restoration

The repair phase: cutting The “jetting” technique (i.e. the


the defective cable section, spraying of water under high pressure
analysing the fault and mak- from the MED1) made it possible to re-
ing the junctions embed the cable without difficulty for
straight line. However, re-embedding
The first operation consisted in at the level of the cable loops was a
accurately locating the cable. To do more delicate task. In some areas
so, a signal was injected into the where the required embedding condi-
cable at Sangatte. The MED1, fitted tions might not be correctly fulfilled,
with a device enabling it to detect RTE reinforced cable protection by lay-
this signal and to accurately deter- ing “protection mattresses”. These
mine its route with respect to the mattresses are blocks of cast concrete
cable position, was launched in the bound together by a mesh made of
vicinity of the fault. synthetic material.
Divers then went into action at a
depth of 20 metres to sever the defec-
tive portion of the cable. A first end of
the severed cable was brought up from
the sea bed onto the barge, aboard
which the first junction with the replace-
ment cable was performed. The second
end of the severed cable was then
brought up onto the barge in order to
make the second junction. The repaired
cable was then laid back on the sea
bed. A repair loop thus replaced the
Figure 4: Protection mattress. In all, 11 mat-
defective section and reconnected the tresses of this type were laid so as to protect
submarine cable. the cable against external hazards.

10 E L E C T R A N°213 - Avril 2004


0403-154Mep-ok 5/02/07 9:25 Page 11

C O N T I N U E D

I nvited P aper
Service restoration on 28 May 2003. As the sea bed was intact at
2003 brought the IFA 2000 inter- the place of the fault, this ruled out
connection back to its nominal the occurrence of a recent exter-
capacity of 2000 MW. During the nal hazard. Furthermore, the mar-
repair period, almost 40% of the itime authorities made no mention
time was spent in the shelter of the of any vessel having sustained dam-
port of Dover, due to unfavourable age in the area at the beginning of
weather conditions. March 2003.

Fault inspection
The expert examination of the
fault was carried out on 11 June

INVITED PAPERS

ELECTRA is the journal


of CIGRE Members.
Nevertheless, a number of
Figure 5: Aspect of the fault. The cable armature is in the form of a bird cage, and oil seeps through the columns under the section
hole which traverses all of the insulation, the lead and the polyethylene sheath. ‘ Invited Papers ’ are now
open to all contributors.
This we hope will enhance
The progressive inspection of the In addition, the cable showed many exchanges between
cable, layer by layer, immediately honeycomb-like areas. Although these all players in the area
showed that the cable was slightly marks are usual on this type of cable, of electrical power.
twisted. At the paper level, this resulted the density is abnormally high here and
in many layers being torn, and in “elec- seems to express particular mechanical If in your country you have
tric wear” with traces of carbonisation. stresses. information about signifi-
cant events or innovation in
the area of electricity,
please share this with us.
Your contribution
(2 500 words maximum)
should be sent directly to
the Central Office or to your
National Committee.
It will then be forwarded to
the Editing Committee.

We rely on your collabora-


tion, for which we thank you
in advance.
Figure 6: Torn paper and traces of carbonisation between the edges. Honeycombs are also to be seen.

No. 213 - April 2004 E L E C T R A 11


0403-154Mep-ok 5/02/07 9:25 Page 12

C O N T I N U E D
Invited Paper
A twist is to be noted at the cable This exceptional operation brought
core, well visible by means of the fab- together all of the repair resources
rication indentations. elaborated 17 years ago and continu-

Figure 7: Core twist. This twist was, in fact, general at the fault position since the lead was also twisted, as
well as the polyethylene sheath. It should be noted the sheath regained its rectilinear shape after the lead
had been removed.

It therefore appears that the fault ously improved since. Despite the dif-
was due to mechanical causes. The twist ficult weather conditions which slowed
probably dates back to the laying or down the repair actions, the preventive
embedding phase, caused either by the measures provided for showed that
moving of the laying vessel, or by a shift they were up to the task. The reactive
of the embedding machines. An in-plant capability of the teams that had been
defect or a fault during the winding set up was outstanding.
phase is normally to be ruled out,
because the deformation observed on The repair operation was the occa-
the cable armature would have been sion for the teams involved to get a
noticed during these operations or dur- real hands-on approach in a situation
ing the passage by the port holes of the of this kind.
laying vessel. The twist led to the tear-
ing of several paper layers and slow elec- As a result of this work and experi-
trical wear resulted in cable dielectric ence, RTE is continuing its efforts to
breakdown after 17 years of operation. improve the conditions of localisation and
The inspection of the neighbouring the knowledge of propagation speeds.
parts showed the perfectly sound con-
dition of the insulation and armatures, Over and above the mechanical
making it possible to envisage the fault that was located, the detailed anal-
operation of the Cross-Channel link in yses made on the portions of the cable
the long term with a good degree of brought up from the sea bed showed
confidence. that there was no ageing of the insu-
lation system and armatures after
A successful repair and nearly two decades of service.
trained teams
The experience acquired in carry-
This event underlined the reactivity ing out this action in co-operation with
of the TSOs as RTE, in close co-opera- NGT allows us to envisage the
tion with its English counterpart, imme- restored operation of the intercon-
diately dealt with this damage and nection between France and the
implemented all necessary means to United Kingdom with a great deal of
repair the interconnection. confidence. ■