Construction Scope Of Section-A: All mechanical equipment,non-

standard parts, steel structure,process piping,cladding, heat


insulation,fabrication works of the section-A excluding spaceframes of
sandy clay storage,raw coal storage and limestone storage , including
but not limited to the following workshops: Limestone transport from
existing OLBC to storage/Limestone storage/Limestone transport to
dosing silo, sand clay transport from OLBC to storage/storage for
sand clay,clay and iron material/RM additive transport to dosing silo,
raw coal storage/raw coal reclaim&transport to mill, truck
unloading/raw coal transport to storage and all mechanical and steel
structure works on drawings(including the change of the drawings)工
程范围: 所有 SECTION-A 的机械设备、非标、钢结构(不包含石灰
石,原煤,砂质粘土堆棚网架安装部分)、工艺管道、彩板、保温、制
作工程,包括但不限于:石灰石从已有的 OLBC 输送至堆棚/石灰石堆
棚/石灰石输送至定量给料仓,砂质粘土从已有的 OLBC 输送至堆棚/粘
土、砂质粘土、铁粉堆棚/辅料输送至定量给料仓,煤堆棚/煤输送至煤
磨,煤卸车/煤输送至堆棚(包括图纸变更)的所有机械和钢结构工程。

ESTIMATED BILL OF QUANTITY

Process ID 2021/2022/3011 2023/2024/3012 0633 /0641 0631/0632

Workshop LS transport sand clay raw coal truck


from existing transport from storage/raw unloading/ra
OLBC to OLBC to
coal w coal
storage/LS storage/storage
reclaim&transp transport to
storage/LS for sand clay,clay
transport to and iron ort to mill storage
dosing silo material/RM
additive transport
to dosing silo
Equipment(t) 957 878 570 186
Steel 580 1120 600 112

structure(t)
Non standard 15 10 3.5 1.5

parts(t)
Piping (t) 4 1.5 1.5 1
Refractory(t) \ \ \ \
Insulation(㎡


Cladding(㎡)
Steel structure 580 1120 600 112

fabrication(t)