You are on page 1of 8

PROJECT NAME - PHYSICAL REHABILITATION CENTER

LOCATION - OPP. GOREWADA LAKE, NAGPUR | TYPE - ACADEMIC


INTRODUCTION :

The Physical Rehabilitation Center for traumatic


disabilities is a outcome of the present scenario of the
healthcare facilities created by the technological
advancements for the revenue generation rather than
making it feasible for the users. Introducting the spces
like “Nature inside the building” which results, positive
impact on the patient’s health not only physically but
also by focusing more on the holistic well- being of the
individual.

PA G E N O . | 0 2
Location : On the Gorewada road near Natraj society opposite to the Gorewada lake,
AIM : Nagpur.

To design the humanizing spaces Existing width of the


in rehabilitation center and explore the Primary access is 9m
bidirectional relationship between the human wide road
and nature i.e. with respect to preserve,
conserve and protect the human and nature
relationship through Biophilic & Bioclimatic
aspects.
Primary access
OBJECTIVES :

1. connectivity of human, architectural space


& nature Secondary access from
2.Bridge the gap between modernisation & various parts of near by
healing environment villages, normally it is 6m
wide road
ARCHITECTURAL CHALLEGES :

How to built environments and


their connection with nature affect overall
Secondary access
holistic level of well-being and in turn effect
6.4 Km
the healing process.

SCOPE OF PROJECT :
Large trees are present
mostly on the periphery
It redefines the way we look after the health-
of the site
care institutionalized
Small shrubs are con-
It reclaims and merge with the local content
centrated on the north
to ensure the minimumal energy usage

LIMITATIONS :
10.1 Km
The elements of barrier free Existing natural features
architecture can be used to create innova-
tive spaces but at the same time they may
distrub the required atmosphere require-
ments for healthcare facility Very few contours giving
slight slope to the site
from west to east 9.1 Km

N
16.6 Km
Topography of the site

PA G E N O . | 0 3
7

7
11
13 7
7
7
4

7
9 28
14 26
29

17
16
9 30
7 31
6
32 31

25

12
10 24
9

22 9

7
31
7
33 27
8
18
4 7 21
15

9 34
9

8
6 5
1
2 3

1. Guard room 8. Musical Fountain 15. Flower garden 22. Pharmacy unit & 27. Admin unit
2. Entry 9. Gazibo GOREWADA LAKE
16. Sand pit staff amenities 28. Residential unit
3. Exit 10. Sculpture garden 17. Kids play area 23. Emergency unit & 29. Swimming pool
4. Service entry 11. Open food court 18. Emergency entry medical imagining unit 30. Pool seating area
5. 2-wheeler parking 12. Open gym 19. Outpatient entry 24. Outpatient unit & 31. Green seating area SITE PLAN
N
6. 4-wheeler parking 13. Meditation area 20. Admin entry OT complex 32. Aquarium S C A L E = 1 : 11 0 0
7. Water body 14. Multipurpose area 21. Residential entry 25. Inpatient unit 33. Viewing gallery
26. Therapy unit 34. Seating area PA G E N O . | 0 4
Fig. Circular form, least surface area
is exposed to the sunlight

Fig. Building oriented according


to the climatic context

Fig. Easy vehicular accessibility

The form and orientation of the building is based on


the climatic context, surrounding and vehicular move-
ment.
The building blocks are planned as separate units
connected by the inseparable transitional spaces,
acting as the unique feature of the building.

PA G E N O . | 0 5
EMERGENCY &
The center is accessible from the Central main access, PHARMACY UNIT
branched towards the emergency and pharmacy department.
It is planned in such a way that it can be easily accessible at WASH AREA
(13.84 SQ.M.)

anytime. The pharmacy department is placed along staff


W3
D4
DIS- DIS-
ABLED. ABLED.
WC WC
PANTRY
D5
D5
(21.80 SQ.M.)
WC WC

amenities like Dr room, Nurse room cafeteria and reading


D5
GENE- GENE- D5
D3 STAFF
TOR TOR LADIES REFRESHMENT
TOILET
GENTS
(20.46 SQ.M.)
AREA
TOILET
(29.39 SQ.M.)
(39.28 SQ.M.)
3.00 M WIDE CORRIDOR D2
D3

spaces.
D3
(1:12)
(LENGTH=3.6M)

3.00 M WIDE CORRIDOR


UP

SEATING AREA
(114 SQ.M.)
D1
DN 310
PROSTHETICS &
ORTHOTICS EQUIP.
(58.38 SQ.M.)

Emergency dept. is connected to the outpatient dept. through METER


D3
LIFT
310.75 ROOM

D4

the viewing gallery placed along the medical imaginig unit, UP


STORE
UP
W2

acts as the waiting area, while it is connected to the inpatient


(1:12)
(LENGTH=3.6M)
ROOM
(56.00 SQ.M.)
D2

D3

D2 DISPENSING
A
unit by the OT Complex.
UNIT
(39.58 SQ.M.)
UP
(1:12)
(LENGTH=5.4M)

PHARMACY
(70.78 SQ.M.) D3

2.80 M WIDE CORRIDOR

310.28 308.70 G.T G.T

W1 W1
309.20
VIEWING

A
TOILET
GALLERY GENE-
GENE-
TRIAGE D4 TOILET
D4
TOR
D5 D5
WC
DIS- DIS-
WC TOR
D5 D5

(49.24 SQ.M.) ABLED.


WC
ABLED.
WC
309.70 LADIES
GENTS
TOILET
TOILET
(20.10 SQ.M.)
(20.10 SQ.M.)

UP 310.30 REST
ROOM VIEWING
(45.33 SQ.M.) PLAZA
310 (1:12)
(LENGTH=3.6M)

D2 D2
UP (1:12) UP
(LENGTH=6M)

UP
UP 3 M WIDE CORRIDOR
310.30
WAITING
AREA

Staff amenities
(1:12)
(LENGTH=7.2M)

(88.64 SQ.M.)
UP

309.40 STORE
ROOM
D4 (4.32 SQ.M.)

UP
D4

CT SCAN OBSERVING
CELL
(46.59 SQ.M.) (9.79 SQ.M.)

309.55 D2

Pharmacy
(1:12) D2
STORE
310

C
(LENGTH=3.6M)
ROOM

D
310.30 D4
(6.24 SQ.M.)

UP X-RAY
RECEPTION
AREA ROOM D4
UP (34.40 SQ.M.)
(55.23 SQ.M.)

Dept.
(1:12)
(LENGTH=3.6M) DARK
ROOM
(8.11 SQ.M.)

D3 D3
UP
(1:12)
(LENGTH=6M)
D3

D2
UP AHU
DR.CABIN PLASTER

N
DR.CABIN
LIFT (34.20 SQ.M.) ROOM
(34.20 SQ.M.)
(78.94 SQ.M.)

D5 D4

METER TOILET W1

ROOM TOILET
D4

Emergency
W2 W2 W2 W1 W1 W1

Dept.
W2 W2

W2

A
Seating plaza serving as the
DIS-
ABLED.
WC
DIS-
ABLED.
WC
NURSE
ROOM
SEATING
PLAZA
PROPOSED GROUND
FLOOR PLAN
D5 D5 W2
TOILET LADIES
(40.73 SQ.M.)
WC WC
TOILET

viewing gallery
D5GENE- GENE- D5(20.46 SQ.M.)
TOR TOR

SCALE = 1:800
LOCKER LOCKER
ROOM ROOM
(20.00 SQ.M.) (20.00 SQ.M.)

Pharmacy
D3

D3 D3

W2

3.00 M WIDE CORRIDOR


W2

DR. CCTV
ROOM
ROOM
(34.25 SQ.M.)
W2
(37.80 SQ.M.)
W2

D1

D3

Overhang spaces acts


D3
LIFT METER
ROOM

Spacious seating areas are


D4

as shading mechanism
W2

created by louvers and mez-


UP

STAFF

floor beneath
AMENITY
(54.35 SQ.M.)
D2
1.80 M WIDE CORRIDOR

zanine stories
D

A
LIBRARY
(129.39 SQ.M.)

30
8.7
0 W1 W1 W1 W1 W1 W1

30
9.2 TO
ILE
0 T SAMPLE DR. CABIN
TO
TO
SAMPLE COLLECTION
ILE
D4
T ILE COLLECTION
VIEWING T
GALLERY ROOM
D4
D4

ROOM (45.33 SQ.M.) D3 D3


(154.79 SQ.M.)D3
D3 D3

(49.24 SQ.M.) WAITING


AREA
SAMPLE SAMPLE REPORT
TESTING TESTING PREP.

D2 D2 D3

3 M WIDE CORRIDOR
+10.50 (320) LVL. PARAPET LVL.

+10.20 (319.7) LVL. FIRST SLAB W3 W3 W3

LVL. CABIN 1 CABIN 2 CABIN 3

SEATING AREA WAITING AREA


W1
4.400

D3 D3
WAITINGD3
(46.59 SQ.M.) AREA

ROOM TOILET
2.400

D2
D2

D
VISITORS
(34.40 SQ.M.)

+5.70 (315.2) LVL. FIRST FL. LVL. WAITING AREA


(55.23 SQ.M.)

REST ROOM
D3 D3

WAITING AREA TOILET D2

TOILET
UP
DR.CABIN RECEPTION AREA
ROOM
4.850

LIFT (72.30 SQ.M.)


D5 D2

TOILET
METER

PROPOSED FIRST
2.400

ROOM

N
D4

W1

+0.75 (310.3) LVL. PLINTH LVL. FLOOR PLAN


+0.55 (309) LVL.
SCALE = 1:800
A
+0.00 (308.45) LVL. GROUND LVL.

PA G E N O . | 0 6
O U T PAT I E N T &
D4
OT COMPLEX
AHU

CHILLER DIRTY UTILITY W1

PLANT (51.16 SQ.M.)


GAS STERILE
CYLINDER STORE
STORE (24.53 SQ.M.)
(17.60 SQ.M.) D2 D2 D4 D4

INDI.THERAPY D2 PHYSIO-
W2 (36.44 SQ.M.) THERAPY W1 OPERATION
(74.03 SQ.M.) THEATER-1 W1

(49.23 SQ.M.)

W2
D D
W2
OPERATION
W1 THEATER-2
(69.59 SQ.M.)

W2
W1
D
D

D3
LADIES
TOILET LADIES
(20.70 SQ.M.) W1 TOILET

4.50 M WIDE
CORRIDOR
DIS-
D5 D5 D5 ABLED. DIS-
4.50 M WIDE CORRIDOR

WC WC WC D5 D5 D5 ABLED.
GENE- WC WC WC
TOR GENE-

B
OPD TOR

(18.13 SQ.M.)
RECOVERY
D3
W2
GENE- W1
TOR
WC DIS- ROOM GENE-
D5 D5 WC D5 TOR
ABLED.
(63.62 SQ.M.) D5
WC
D5 WC D5 DIS-

B
WC ABLED.
D4 WC
D4
TOILET GENTS
D2 TOILET GENTS
TOILET D2
(33.36 SQ.M.) TOILET

INDI. D2 TOILET
W2 THERAPY
(18.13 SQ.M.) D4
D
UP
UP

W2
W2 DR.ROOM
(37.95 SQ.M.)

METER
D LIFT ROOM METER
DN LIFT ROOM

DN DN
SEATING PLAZA
4.00 M WIDE (90.89 SQ.M.)
ELECTRO
CORRIDOR
THERAPY DN
(104.76 SQ.M.) D2 D2 310.45
310 D2 D2
DN

3.00 M WIDE
CORRIDOR
(1:12)

3.00 M WIDE
(LENGTH=1.2M)

CORRIDOR
COUNSELING CELL COUNSELING CELL COUNSELING CELL
UP
(PSYCHOLOGICAL TREATMENT) COUNSELING CELL D3
(PSYCHOLOGICAL TREATMENT)
310.75 (40.12 SQ.M.) (40.12 SQ.M.)
D2 (PSYCHOLOGICAL TREATMENT) (PSYCHOLOGICAL TREATMENT)

OPD W2
D3

(PROSTHETICS)
DR.
(52.35 SQ.M.)
D ROOM
W2
(40.12 SQ.M.) (20.00 SQ.M.)
(40.12 SQ.M.)
UP D5

3.00 M WIDE
D4

CORRIDOR
TOILET LOCKER D5
(1:12)
(LENGTH=3.6M) ROOM TOI.
310.45 TOILET
309.75 310.75 LOCKER TOI.

D4
ROOM
311.40
D5

W2 D5

OPD D3

(ORTHOTICS)
310.90 (52.35 SQ.M.) NURSE
310.90
D D2
W2
ROOM
WAITING RECEPTION (19.75 SQ.M.)
D3
AREA AREA
(101.26 SQ.M.) (44.41 SQ.M.)
SEATING
PLAZA WAITING
(21.56 SQ.M.) STAFF
AREA
WORKSTATION
(101.26 SQ.M.) WAITING (78.00 SQ.M.)
AREA
(178 SQ.M.)
D3
D

UP
310.90 B
310.60 B
UP

310.15

UP

N
310

PROPOSED FIRST
FLOOR PLAN
SCALE = 1:800
Staggered
N PROPOSED GROUND planning
FLOOR PLAN
SCALE = 1:800 According to the climatic con-
text, courtyard planning is used,
Treatment as it is a source of biophilic and
area bioclimatic approach
Semi-open areas act
as connecting link
Diagnosis
Series of area
courtyards

Outpatient unit consists of diagnosis and treatment areas,


visually connected by the series of courtyards
Planned according to the patient flow, connected to the medi-
cal imagining unit provided in the emergency department.
Facility provided for :
1. Prosthetics & Orthotics patients
2.Neurological patients
3. Psychological patients PA G E N O . | 0 7
I N PAT I E N T &
ADMIN UNIT
LIFT

W2
LIFT
D

W2
UP
UP

DN
309.05

AQ
W2

W2

UA
RI
UM
W2

W2

W2
ROOM
W2
ROOM (51.73 SQ.M.)
(51.73 SQ.M.)
D4
D4

TOILET W2 W2 W2 W2 TOILET D2

D2

TOILET
TOILET
TOILET
WAITING AREA ROOM
ROOM TOILET
309.20 (39.00 SQ.M.)
(39.00 SQ.M.)
UP 309.50

UP D2

309.75
W2

D2

ROOM D2

W2
(39.00 SQ.M.)

D4

TOILET
TOILET

TOILET
D4

SE NURSING D4

AT W2
ROOM STATION
(IN SPA ING
AHU W2
(39.00 SQ.M.)
ROOM
30
9.6 PA CE (39.00 SQ.M.)
0 TIE W2

NT D2 W2

)
F
D2
DN
D2 W2
W2
W2 D2 W2 W2

W2

ROOM
ROOM
(39.00 SQ.M.)
W2
(39.00 SQ.M.)
W2

D4
D4
TOILET
TOILET
TOILET
TOILET
D4
D4

W2
ROOM D2

(39.00 SQ.M.) 309.20 W2


D2

ROOM
W2 (39.00 SQ.M.)

W2
DN W2

D2
W2
ROOM
D2 (45.18 SQ.M.)
ROOM
(45.18 SQ.M.)
W2

W2
D2 D3 D3
READING

D3

D3
D2
SPACE
(113.60 SQ.M.)
DR.CABIN
DR.CABIN
D4
DR.CABIN DR.CABIN
(29.25 SQ.M.) LEGAL (29.25 SQ.M.)(29.25 SQ.M.)
D4
ADMISSION (29.25 SQ.M.) TOILET READING
UNIT D5 SERVICES SPACE
TOILET
PUBLIC (34.65 SQ.M.)
(19.19 SQ.M.) DISCHARGE ROOM (113.60 SQ.M.)
D5
D5
TOILET RELATION
UNIT (48.49 SQ.M.)
(34.65 SQ.M.)
D5
TOILET
TOILET TOILET
(22.75 SQ.M.) D3
UP TOILET
D3 D3 D3

D3 W2 W2 W2
D3 D3 D2
D3 CONFERENCE W2 W2

ROOM

C C
(43.79 SQ.M.)

C
UP
INTERVIEW

C
UP
ROOM
309.50 309.20 (48.00 SQ.M.)
WAITING
AREA

DN

RECEPTION &
WAITING
AREA PROPOSED GROUND
N RECEPTION &
WAITING D3
PROPOSED FIRST
UP AREA

FLOOR PLAN
(97.53 SQ.M.) LADIES

UP
FLOOR PLAN
GENTS TOILET (97.53 SQ.M.) D3

TOILET D3 D3 (20.19
LIFT (25.06 SQ.M.)
SQ.M.)
GENE- GENE- EXECUTIVE ADMIN

SCALE = 1:800
D5 TOR TOR D5
(34.95 SQ.M.)

SCALE = 1:800
WC WC
D5 D5
METER
ROOM DIS- DIS-
METER
ABLED. ABLED. ROOM
WC WC

32%

50%

No. of occupants = 40-50 Patients 6%

No. of patient ensuites = 18 5%


Inpatient unit is connected to the outpatient unit through
7%
Staff = 20 - 25 the therapy unit cosists activities like restaurant, catering
Patient ensuites Dr. Cabin Staff Workstation unit, linen unit and staff dinning area.
Dr.& Nurse room OT Complex
The rooms are strategically placed as the semi-private
rooms as the lenght of treatment is quiet long. It consists
of small recreational area

It is directly accessible from the admin unit placed along


the spaces like admission unit, discharge unit and waiting
area.It is connected to the other recreational areas like
flower garden, open gym, kids play area and pool area.

PA G E N O . | 0 8

You might also like