You are on page 1of 1

Format No : PROJ/SITE/MF-11

Protocol No : KBL/CQA/Proto/VTP/08

PROTOCOL FOR CHECKING SHAFT RUNOUT – VT PUMPS


KIRLOSKAR BROTHERS LIMITED. Date:-
Regd & Corporate office - "YAMUNA", Survey No 98 (3-7), Baner, Pune 411045.
Project Name :
Description of Equipment: Vertical Turbine Pump
Customer/Consultant:
Reference Document / Drawing/FQP No:
Measuring Instrument & Calibration Details
Details of Activity / Process (Include Sketch if necessary) :-

IMPELLER SHAFT :
ANGULAR LOCATION A LOCATION B LOCATION C LOCATION D LOCATION E
POSITION (Shaft End 1) (Bearing 1) (Bearing 2) (Shaft End 2)

90°
180°
270°

INTERMEDIATE SHAFT :
ANGULAR LOCATION A LOCATION B LOCATION C LOCATION D LOCATION E
POSITION (Shaft End 1) (Bearing 1) (Bearing 2) (Shaft End 2)

90°
180°
270°

HEAD SHAFT :
ANGULAR LOCATION A LOCATION B LOCATION C LOCATION D LOCATION E
POSITION (Shaft End 1) (Bearing 1) (Bearing 2) (Shaft End 2)

90°
180°
270°

Note : Strike out or remove excess columns, if not applicable

Test Results / Observations / Remarks :

Test Witnessed By :

(Name & Signature) (Name & Signature) (Name & Signature)


For Sub Contractor For Kirloskar Brothers Limited For Customer

You might also like