You are on page 1of 1

LIST OF ACTIVITIES FOR LUGTU PROJECT INVENTORY OF FINISHING MATERIALS

LOCATION
TO DO LIST STATUS MATERIAL GROUND FLOOR QUANTITY BRAND STATUS
SECOND FLOOR
STRIP LIGHTS DINING AREA 11 MTS
DESIGN OF WALK IN CLOSET FOR HALLWAY 15 MTS
FOR CHECKING
BEDROOMS AND MASTER BEDROOM MASTER
13 MTS
BEDROOM
LIVING ROOM 16 MTS
LAYOUT AND ESTIMATE OF STONE BEDROOM 2 13 MTS
FINISH FOR CHECKING BEDROOM 3 13 MTS
@ FRONT COLUMNS FAMILY ROOM 13 MTS
2ND FLOOR
26 MTS
HALLWAY
PURCHASE 3 GYPSUM BOARDS (9MM) - PIN LIGHT DINING AREA 11 PCS
MASTER
6 PCS
BEDROOM
ESTIMATE OF WALL PANEL @ LIVING
- LIVING AREA 8 PCS
AND DINING AREA
GUEST ROOM 5 PCS
FOYER 4 PCS
DESIGN OF RAILINGS FOR STAIR - BEDROOM 2 4 PCS
BEDROOM 3 4 PCS
FAMILY ROOM 4 PCS
DESIGN OF RAILINGS FOR OPEN SPACE LIGHTING
FOR CHECKING GARAGE
(2ND FLOOR) RECEPTACLE
MAID’S ROOM
UTILITY AREA
LAYOUT AND ESTIMATE OF STONE MAID’S T&B
FOR CHECKING
FINISH @ PERIMETER FENCE FOYER
KITCHEN
DINING AREA
INVENTORY OF FINISHING GUEST ROOM
MATERIALS FOR CHECKING COMMON T&B
MASTER
BEDROOM
BEDROOM 2 3 PCS
BEDROOM 3 3 PCS
FAMILY ROOM 1 PC
HALLWAY 2 PCS
WALL
PERIMETER
MOUNTED
FENCE
LIGHT

You might also like