You are on page 1of 47

GENERAL ARRANGEMENT OF SUPPORT PS-1 AT NODE 2010

LINE NO.-6"-SHHP-G8101-H100

REST SUPPORT

1"-SHHP-G8101-H100

EL+101.650 M

REFER NOTE 1

EXISTING SECONDARY STRUCTURE

Note = 1.GNFC to provide the secondary supporting structure and ensure respective
dimensions
GENERAL ARRANGEMENT OF SUPPORT PS-2 AT NODE 1875
LINE NO.-6"-SHHP-G8101-H100

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 3
265
210
REFER NOTE 3

150

400
REFER NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-3 AT NODE 1800
LINE NO.-6"-SHHP-G8101-H100

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 3
265
210
REFER NOTE 3

150

400
REFER NOTE 3

ELEVATION VIEW-FROM EAST ELEVATION VIEW-FROM SOUTH

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-4 AT NODE 1050
LINE NO.-6"-SHHP-G8101-H100

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 3
265
210
REFER NOTE 3

150

400
REFER NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-5 AT NODE 1040
LINE NO.-6"-SHHP-G8101-H100

REST+GUIDE(N-S)(GAP 10MM)

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

265 210
REFER NOTE 3 REFER NOTE 3

150
400 10 10
REFER NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-6 AT NODE 960
LINE NO.-6"-SHHP-G8101-H100

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 3
265
210
REFER NOTE 3

150

400
REFER NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-7 AT NODE 860
LINE NO.-6"-SHHP-G8101-H100

REST+GUIDE(N-S)(GAP 3MM)

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

265 210
REFER NOTE 3 REFER NOTE 3

150
400
REFER NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-8 AT NODE 845
LINE NO.-6"-SHHP-G8101-H100

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 3
265
210
REFER NOTE 3

150

400
REFER NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-9 AT NODE 750

LINE NO.-6"-SHHP-G8101-H100

REST+LIMITSTOP(E-W)(GAP 0MM)

AS PER LINDE STD. USE SHOE FROM LINDE


SUPPORT STD. FROM LINDE STD.

265 210
REFER NOTE 4

0
150 REFER
NOTE 4
~100

400
REFER NOTE 4

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. 50x25x10THK stopper cut from scrap plate of corresponding pipe material spec and
shop welded on pipe as shown in the above figure. (4Nos. per shoe)
3. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
4.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-10 AT NODE 730
LINE NO.-6"-SHHP-G8101-H100

NOTES= 1. .GNFC to ensure the Shoe Dimensions. and Elevations.


2. Spring Vendor to ensure the overall spring dimensions

VIEW FROM NORTH

2" SCH 160 TRUNNION 200MM LONG


EXISTING STRUCTURE
WITH 6MM THICK SQUARE BASE PLATE
6"-SHHP-G8101-H-100

PIPE SHOE
GUIDE(N-S)(GAP 20MM)

HOLDOWN(E-W)(GAP 9 MM) EACH END CL EL103.015


H 210 REFER NOTE 1
C CHANNEL
1000

1420 ENSURE SPRING DIMENSION


VENDOR REFER
NOTE 2

~372
VARIABLE SPRING L
BOTTOM MOUNTED
HEIGHT
TO BE WELDED 300 INCLUDING
10 THK BASE
PLATE

150
~1260 L
WHERE,
GNFC PROVIDED SECONDARY MEMBER
H= HEIGHT OF ISMB/C -CHANNEL
2" SCH 160 TRUNNION
L= HEIGHT OF F-TYPE SPRING CAN GUIDE L ANGLE
200MM LONG
C= HEIGHT OF PIPE SHOE ARRANGEMENT
WITH 6MM THICK
SQUARE BASE PLATE
GUIDE(N-S)(GAP 20MM) VARIABLE SPRING
EACH SIDE BOTTOM MOUNTED

ISMB BEAM 6"-SHHP-G8101-H-100

PLAN VIEW PIPE SHOE

HOLDOWN(E-W)(GAP 9 MM) EACH SIDE


GENERAL ARRANGEMENT OF SUPPORT PS-11 AT NODE 132
LINE NO.-6"-SHHP-G8101-H100

USE 6"SLIDING AND GUIDING SUPPORT


ARRANGEMENT FROM LINDE STD.

158
MM
REFER

MM
NOTE 3

10
VERTICAL PIPE

GUIDING LUGS
GAP 5 mm ON EACH SIDE

400
MM
320
MM

INSULATION REFER
NOTE 3

REFER
NOTE 3 GNFC TO ENSURE
REFER
NOTE 3 SECONDARY
STRUCTURE
8 MM

LOCATION

ELEVATION VIEW
CONTINUATION ON PG. 323 FOR PLAN VIEW

DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 5MM ON EACH SIDE)

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-11 AT NODE 132
LINE NO.-6"-SHHP-G8101-H100

CONTINUATION FROM PG 322

PIPE SHOE FROM


LINDE STANDARD
6"-SHHP-G8101-H-100 HOLDOWN(N-S)(GAP 5 MM) EACH SIDE

GNFC TO ENSURE
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE CLAMP SHOE GUIDE(E-W)(GAP 5 MM)


EACH SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW

DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 5MM ON EACH SIDE)

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-12 AT NODE 2250
LINE NO.-2"-G8101-H90

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 1
150
115
REFER NOTE 1

100

400
REFER NOTE 1

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use GNFC Fabricated Support Arrangement for 2 inch Line support, GNFC to ensure the dimensions
GENERAL ARRANGEMENT OF SUPPORT PS-13 AT NODE 2260
LINE NO.-2"-G8101-H90

REST+GUIDE(N-S)(GAP 18MM)

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

150
115
REFER NOTE 1 REFER NOTE 1

0 100

400 18 18
REFER NOTE 1

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use GNFC Fabricated Support Arrangement for 2 inch Line support, GNFC to ensure the dimensions
REFER NOTE 3

160

3. GNFC to ensure the TRUNNION


Dimensions.

GENERAL ARRANGEMENT OF SUPPORT PS-14 AT NODE 3340


LINE NO.2"-G8101-H90
GENERAL ARRANGEMENT OF SUPPORT PS-15 AT NODE 2430
LINE NO.-2"-G8101-H100

ISMB MEMBER

VERTICAL PIPE
GUIDE L ANGLE
BOLTING ARRANGEMENT
ASSEMBLY

U-BOLT
ASSEMBLY

GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
CONTINUATION ON PG.2 FOR PLAN VIEW
DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-15 AT NODE 2430
LINE NO.-2"-G8101-H100
CONTINUATION FROM PG.1

HOLDOWN(E-W)(GAP 10 MM) EACH SIDE

ISMB MEMBER
2"-G8101-H100

GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE GUIDE(N-S)(GAP 10 MM) EACH


SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-16 AT NODE 2490
LINE NO.-2"-G8101-H100

ISMB MEMBER

LIMIT LUG
VERTICAL PIPE REFER DETAIL A
BOLTING
ASSEMBLY

GAP 0 mm
U-BOLT
GNFC TO ENSURE
ASSEMBLY
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS

GUIDE L ANGLE
ARRANGEMENT

CONTINUATION ON PG.4 FOR PLAN VIEW


DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 0MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-16 AT NODE 2490
LINE NO.-2"-G8101-H100
CONTINUATION FROM PG.3

HOLDOWN(E-W)(GAP 0 MM) EACH SIDE

LIMIT LUG
REFER DETAIL A

ISMB MEMBER
2"-G8101-H100

GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE GUIDE(N-S)(GAP 0 MM) EACH


SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 0 MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-17 AT NODE 285
LINE NO.-1"-SHHP-G8101-H50

ISMB MEMBER

VERTICAL PIPE
GUIDE L ANGLE
BOLTING ARRANGEMENT
ASSEMBLY

U-BOLT
ASSEMBLY

INSULATION

GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
CONTINUATION ON PG. 332 FOR PLAN VIEW
DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-17 AT NODE 285
LINE NO.-1"-SHHP-G8101-H50
CONTINUATION FROM PG. 331

HOLDOWN(E-W)(GAP 10 MM) EACH SIDE

ISMB MEMBER
1"-SHHP-G8101-H50

GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE GUIDE(N-S)(GAP 10 MM) EACH


SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 10MM ON EACH SIDE)

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-18 AT NODE 294
LINE NO.-1"-SHHP-G8101-H50

VERTICAL PIPE
BOLTING
ASSEMBLY

U-BOLT
ASSEMBLY

INSULATION

GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
CONTINUATION ON PG. 334 FOR PLAN VIEW REQUIRED
DIMENSIONS

DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 0MM ON EACH SIDE)


GENERAL ARRANGEMENT OF SUPPORT PS-18 AT NODE 294
LINE NO.-1"-SHHP-G8101-H50
CONTINUATION FROM PG. 333

1"-SHHP-G8101-H50

GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE

PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 0MM ON EACH SIDE)

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-19 AT NODE 395
LINE NO.-1"-SHHP-G8101-H50

ISMB MEMBER

VERTICAL PIPE
GUIDE L ANGLE
BOLTING ARRANGEMENT
ASSEMBLY

U-BOLT
ASSEMBLY

INSULATION

GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
CONTINUATION ON PG. 336 FOR PLAN VIEW DIMENSIONS

DO NOT REST+4-WAY GUIDE (N-S)(GAP 5MM ON EACH SIDE)


(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-19 AT NODE 395
LINE NO.-1"-SHHP-G8101-H50
CONTINUATION FROM PG. 335

HOLDOWN(E-W)(GAP 10 MM) EACH SIDE

ISMB MEMBER
1"-SHHP-G8101-H50

GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE GUIDE(N-S)(GAP 5 MM) EACH


SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW
DO NOT REST+4-WAY GUIDE (N-S)(GAP 5MM ON EACH SIDE) (E-W)(GAP 10MM ON EACH SIDE)

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-20 AT NODE 405
LINE NO.-1"-SHHP-G8101-H50

1"-SHHP-G8101*H50

REFER NOTE 1
3 MM
GUIDING MEMBER

50

GNFC TO ENSURE
GAP 22 MM SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS

ELEVATION VIEW-FROM EAST ELEVATION VIEW-FROM SOUTH

DO NOT REST+GUIDE(N-S)(GAP 3MM)

NOTE:-1. GNFC TO ENSURE DIMENSION OF GUIDING MEMBER.


2. USE L ANGLE OR ANY SECONDARY STEEL AS A GUIDING MEMBER ACCORDING
TO SITE FEASIBILITY.
GENERAL ARRANGEMENT OF SUPPORT PS-21 AT NODE 620
LINE NO.-1"-SHHP-G8101-H50
GAP 0 MM

50

REFER NOTE 2

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

REST+GUIDE (E-W)(GAP 0MM)

PS-B2
NOTE:-1. GNFC TO ENSURE DIMENSION OF GUIDING MEMBER.
2. USE L ANGLE OR ANY SECONDARY STEEL AS A GUIDING MEMBER ACCORDING
TO SITE FEASIBILITY.
PS-B2-6"

PS-B2
GENERAL ARRANGEMENT OF SUPPORT PS-22 AT NODE 4055
LINE NO.-6"-SHP-CS-600#-H80

USE 6" SLIDING AND GUIDING SUPPORT


ARRANGEMENT FROM LINDE STD.

158
MM

MM
10
VERTICAL PIPE

GUIDING LUGS

400
MM
INSULATION
320
MM

REFER NOTE 3

REFER
NOTE 3

GNFC TO ENSURE
REFER SECONDARY
NOTE 3
STRUCTURE
8 MM

LOCATION

ELEVATION VIEW FROM SOUTH


VERTICAL 4 WAY GUIDE SUPPORT (N-S)(GAP 2MM ON EACH SIDE) (E-W)(GAP 1MM ON EACH SIDE)

CONTINUATION ON PG. 340 FOR PLAN VIEW

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-22 AT NODE 4055
LINE NO.-6"-SHP-CS-600#-H80
CONTINUATION FROM PG.339

PIPE SHOE FROM


LINDE STANDARD
HOLDOWN(E-W)(GAP 1 MM) EACH SIDE
6"-SHP-CS-600#-H80

GNFC TO ENSURE
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE CLAMP SHOE GUIDE(N-S)(GAP 2 MM) EACH


SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(GAP 2MM ON EACH SIDE) (E-W)(GAP 1MM ON EACH SIDE)

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-23 AT NODE 4120
LINE NO.-6"-SHP-CS-600#-H80

NOTES= 1. .GNFC to ensure the Shoe Dimensions. and Elevations.


2. Spring Vendor to ensure the overall spring dimensions

VIEW FROM EAST

2" SCH 160 TRUNNION 200MM LONG


EXISTING STRUCTURE
WITH 6MM THICK SQUARE BASE PLATE
6"-SHP-CS600#-H80

PIPE SHOE
GUIDE(E-W)(GAP 15 MM)
HOLDOWN(N-S)(GAP 2 MM) EACH END CL EL102.800
H
REFER NOTE 1
210
C CHANNEL
1000

1420 ENSURE SPRING DIMENSION


VENDOR

~455
VARIABLE SPRING L
REFER NOTE 2

BOTTOM MOUNTED
TO BE WELDED 300

~190
~3364 L
WHERE,
GNFC PROVIDED SECONDARY MEMBER
H= HEIGHT OF ISMB/C -CHANNEL
L= HEIGHT OF F-TYPE SPRING CAN GUIDE L ANGLE
2" SCH 160 TRUNNION 200MM LONG
C= HEIGHT OF PIPE SHOE ARRANGEMENT WITH 6MM THICK SQUARE BASE PLATE

GUIDE(E-W)(GAP 15MM)
VARIABLE SPRING
EACH SIDE BOTTOM MOUNTED

C CHANNEL 6"-SHP-CS600#-H80

PLAN VIEW PIPE SHOE

HOLDOWN(N-S)(GAP 2 MM) EACH SIDE


GENERAL ARRANGEMENT OF SUPPORT PS-24 AT NODE 4200
LINE NO.-6"-SHP-CS-600#-H80

REST+LIMIT STOP(N-S)(GAP 3MM)

AS PER LINDE STD. USE SHOE FROM LINDE


SUPPORT STD. FROM LINDE STD.

265 REFER 210


NOTE 4

REFER
3 NOTE 4

~100
150

400
REFER
NOTE 4

ELEVATION VIEW-FROM EAST ELEVATION VIEW-FROM SOUTH

Note =1. Use the shoe from existing LINDE support standard.
2. 50x25x10THK stopper cut from scrap plate of corresponding pipe material spec and
shop welded on pipe as shown in the above figure. (4Nos. per shoe)
3. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
4.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-25 AT NODE 4220
LINE NO.-6"-SHP-CS-600#-H80

REST SUPPORT

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

REFER NOTE 3
265
210
REFER NOTE 3

150

400
REFER NOTE 3

ELEVATION VIEW-FROM EAST ELEVATION VIEW-FROM SOUTH

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-26 AT NODE 4840
LINE NO.-6"-SHP-CS-600#-H80

REST+ GUIDE(E-W)(GAP 12 MM)

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

265 210 REFER


NOTE 3
REFER
0 NOTE 3

150

400 12 12

REFER
NOTE 3

ELEVATION VIEW-FROM EAST ELEVATION VIEW-FROM SOUTH

Note =1.Use the shoe from existing LINDE support standard.


2.Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
ELEVATION VIEW-FROM EAST

REFER
NOTE 4

4. GNFC to ensure the TRUNNION


Dimensions.

BDG1-2-6"-300-N-S

6
LINE NO.-6"-SHP-CS-600#-H80
GENERAL ARRANGEMENTOF SUPPORT PS-27 AT NODE 8940
REINFORCING PAD REQUIRED REST+LIMIT STOP(N-S)(GAP 0MM)
REFER
NOTE 3

160

GENERAL ARRANGEMENT OF SUPPORT PS-28 AT NODE 9020


LINE NO.-6"-SHP-CS-600#-H80

3. GNFC to ensure the TRUNNION


Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-29 AT NODE 5220
LINE NO.-6"-SHP-CS-600#-H80
REST+ GUIDE(N-S)(GAP 12 MM)+LIMITSTOP(E-W)(GAP 10MM)

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

265 210
REFER REFER
NOTE 4 NOTE 4
10 0

150
400 12 12
REFER NOTE 4

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. 50x25x10THK stopper cut from scrap plate of corresponding pipe material spec and
shop welded on pipe as shown in the above figure. (4Nos. per shoe)
3. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
4.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-30 AT NODE 5240
LINE NO.-6"-SHP-CS-600#-H80

REST+ GUIDE(N-S)(GAP 15 MM)

AS PER LINDE STD.


USE SHOE FROM LINDE
SUPPORT STD. FROM LINDE STD.

265
210
REFER
NOTE 3 REFER
NOTE 3
0

150
400
15 15
REFER
NOTE 3

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-31 AT NODE 5500
LINE NO.-6"-SHP-020-11K-IH
REST+GUIDE(N-S)(GAP 0MM)+LIMITSTOP(E-W)(GAP 0MM)

GAP 0 MM GAP 0 MM
REFER
NOTE 1
~100

ELEVATION VIEW-FROM SOUTH

DO NOT WELD ON THIS SIDE

GAP 0 MM
125

REFER
NOTE 1

10
REFER
NOTE 1

ELEVATION VIEW-FROM EAST

NOTE:-1. GNFC TO ENSURE DIMENSION OF GUIDING MEMBER.


2. USE L ANGLE OR ANY SECONDARY STEEL AS A GUIDING MEMBER ACCORDING
PS-B2-6" PS-B4-6"
TO SITE FEASIBILITY.
REST+GUIDE(N-S)(GAP 0MM)+LIMITSTOP(E-W)(GAP 0MM)

PS-B4 6" PS-B2 6"


PS-B4 -6"
GENERAL ARRANGEMENT OF SUPPORT PS-32 AT NODE 5540
LINE NO.-6"-SHP-020-11K-IH

ISMB MEMBER

LIMIT LUG
REFER DETAIL A
VERTICAL PIPE
BOLTING
ASSEMBLY

GAP 0 mm
U-BOLT GNFC TO ENSURE
ASSEMBLY SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS

GUIDE L ANGLE
ARRANGEMENT

CONTINUATION ON PG.7 FOR PLAN VIEW


DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 0MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-32 AT NODE 5540
LINE NO.-6"-SHP-020-11K-IH
CONTINUATION FROM PG.6

HOLDOWN(E-W)(GAP 0 MM) EACH SIDE

LIMIT LUG
REFER DETAIL A

ISMB MEMBER
2"-G8101-H100

GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION

VERTICAL PIPE GUIDE(N-S)(GAP 0 MM) EACH


SIDE

GUIDE L ANGLE ARRANGEMENT

PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 0 MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-33 AT NODE 5720
LINE NO.-6"-SHP-018-11K-IH

ANCHOR SUPPORT
REST+GUIDE(E-W)(GAP 3MM)+LIMITSTOP(N-S)(GAP 5MM)+HOLDOWN(GAP 3MM)

3MM THK BP PLATE U-BOLT ASSEMBLY FOR 6" PIPE

L-CHANNEL MEMBER

GAP 5 MM GAP 5 MM
REFER
NOTE 1
~100

ELEVATION VIEW-FROM SOUTH

U-BOLT ASSEMBLY
FOR 6" PIPE
(REFER NOTE 3)

3MM THK BP PLATE

L-CHANNEL MEMBER
10

ELEVATION VIEW-FROM EAST

NOTE:-1. GNFC TO ENSURE DIMENSION OF L-CHANNEL MEMBER &U-BOLT ASSEMBLY.


2. USE L ANGLE OR ANY SECONDARY STEEL AS A LIMITING MEMBER ACCORDING
TO SITE FEASIBILITY.
3. MAINTAIN 3 MM GAP THROUGHOUT, BETWEEN BARE PIPE & U-BOLT ASSEMBLEY.
GENERAL ARRANGEMENT OF SUPPORT PS-34 AT NODE 5800
LINE NO.-6"-SHP-018-11K-IH
GAP 3 MM

125

REFER NOTE 1

ELEVATION VIEW-FROM SOUTH ELEVATION VIEW-FROM EAST

REST+GUIDE (E-W)(GAP 3MM)

NOTE:-1. GNFC TO ENSURE DIMENSION OF GUIDING MEMBER.


PS-B2
2. USE L ANGLE OR ANY SECONDARY STEEL AS A GUIDING MEMBER ACCORDING
TO SITE FEASIBILITY.

PS-B2-6"

PS-B2
GENERAL ARRANGEMENT OF SUPPORT PS-35 AT NODE 5820
LINE NO.-6"-SHP-018-11K-IH

REST SUPPORT

6"-SHP-018-11K-IH

EL+106.084 M

REFER NOTE 1

EXISTING SECONDARY STRUCTURE

Note :- 1. GNFC to provide the secondary supporting structure and Ensure Respective
Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-36 AT NODE 5840
LINE NO.-6"-SHP-018-11K-IH

ANCHOR SUPPORT
REST+GUIDE(E-W)(GAP 0MM)+LIMITSTOP(N-S)(GAP 0MM)+HOLDOWN(GAP 0MM)

3MM THK BP PLATE U-BOLT ASSEMBLY FOR 6" PIPE

L-CHANNEL MEMBER

GAP 0 MM GAP 0 MM
REFER
NOTES
~100

ELEVATION VIEW-FROM EAST

U-BOLT ASSEMBLY
FOR 6" PIPE

3MM THK BP PLATE

L-CHANNEL MEMBER
REFER 10
NOTES

ELEVATION VIEW-FROM SOUTH

NOTE:-1. GNFC TO ENSURE DIMENSION OF L-CHANNEL MEMBER &U-BOLT ASSEMBLY.


2. USE L ANGLE OR ANY SECONDARY STEEL AS A LIMITING MEMBER ACCORDING
TO SITE FEASIBILITY.
NOTE:- CLAMP SHOE ARRANGEMENT AND GUIDE TO BE REFERED FROM LINDE SUPPORT STD,FOR BOTH EXISTING PIPING
AS WELL AS NEWLY INSTALLED TURBINE PIPING AS PER THE TAG MARKED ON ISOMETRICS INDICATING ARRANGEMENTS REQUIREMENT

GENERAL ARRANGEMENT AT EXISTING LINES NODE


7580,6600,7340,2880,3040,3080,3100,3120,3140,3200
,3280, SUPPORT INDICATES THE EXISTING
ARRANGEMENT ON THE SITE AND THE TAGS HAVE
BEEN ALLOTED FOR REST & REST+GUIDE
ACCORDINGLY ON THE MARKED ISOMETRICS.
NOTE:- CLAMP SHOE ARRANGEMENT AND GUIDE TO BE REFERED FROM LINDE SUPPORT STD,FOR BOTH EXISTING PIPING
AS WELL AS NEWLY INSTALLED TURBINE PIPING AS PER THE TAG MARKED ON ISOMETRICS INDICATING ARRANGEMENTS
REQUIREMENT.

You might also like