Professional Documents
Culture Documents
LINE NO.-6"-SHHP-G8101-H100
REST SUPPORT
1"-SHHP-G8101-H100
EL+101.650 M
REFER NOTE 1
Note = 1.GNFC to provide the secondary supporting structure and ensure respective
dimensions
GENERAL ARRANGEMENT OF SUPPORT PS-2 AT NODE 1875
LINE NO.-6"-SHHP-G8101-H100
REST SUPPORT
REFER NOTE 3
265
210
REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-3 AT NODE 1800
LINE NO.-6"-SHHP-G8101-H100
REST SUPPORT
REFER NOTE 3
265
210
REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-4 AT NODE 1050
LINE NO.-6"-SHHP-G8101-H100
REST SUPPORT
REFER NOTE 3
265
210
REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-5 AT NODE 1040
LINE NO.-6"-SHHP-G8101-H100
REST+GUIDE(N-S)(GAP 10MM)
265 210
REFER NOTE 3 REFER NOTE 3
150
400 10 10
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-6 AT NODE 960
LINE NO.-6"-SHHP-G8101-H100
REST SUPPORT
REFER NOTE 3
265
210
REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-7 AT NODE 860
LINE NO.-6"-SHHP-G8101-H100
REST+GUIDE(N-S)(GAP 3MM)
265 210
REFER NOTE 3 REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-8 AT NODE 845
LINE NO.-6"-SHHP-G8101-H100
REST SUPPORT
REFER NOTE 3
265
210
REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-9 AT NODE 750
LINE NO.-6"-SHHP-G8101-H100
REST+LIMITSTOP(E-W)(GAP 0MM)
265 210
REFER NOTE 4
0
150 REFER
NOTE 4
~100
400
REFER NOTE 4
Note =1. Use the shoe from existing LINDE support standard.
2. 50x25x10THK stopper cut from scrap plate of corresponding pipe material spec and
shop welded on pipe as shown in the above figure. (4Nos. per shoe)
3. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
4.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-10 AT NODE 730
LINE NO.-6"-SHHP-G8101-H100
PIPE SHOE
GUIDE(N-S)(GAP 20MM)
~372
VARIABLE SPRING L
BOTTOM MOUNTED
HEIGHT
TO BE WELDED 300 INCLUDING
10 THK BASE
PLATE
150
~1260 L
WHERE,
GNFC PROVIDED SECONDARY MEMBER
H= HEIGHT OF ISMB/C -CHANNEL
2" SCH 160 TRUNNION
L= HEIGHT OF F-TYPE SPRING CAN GUIDE L ANGLE
200MM LONG
C= HEIGHT OF PIPE SHOE ARRANGEMENT
WITH 6MM THICK
SQUARE BASE PLATE
GUIDE(N-S)(GAP 20MM) VARIABLE SPRING
EACH SIDE BOTTOM MOUNTED
158
MM
REFER
MM
NOTE 3
10
VERTICAL PIPE
GUIDING LUGS
GAP 5 mm ON EACH SIDE
400
MM
320
MM
INSULATION REFER
NOTE 3
REFER
NOTE 3 GNFC TO ENSURE
REFER
NOTE 3 SECONDARY
STRUCTURE
8 MM
LOCATION
ELEVATION VIEW
CONTINUATION ON PG. 323 FOR PLAN VIEW
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-11 AT NODE 132
LINE NO.-6"-SHHP-G8101-H100
GNFC TO ENSURE
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-12 AT NODE 2250
LINE NO.-2"-G8101-H90
REST SUPPORT
REFER NOTE 1
150
115
REFER NOTE 1
100
400
REFER NOTE 1
Note =1. Use GNFC Fabricated Support Arrangement for 2 inch Line support, GNFC to ensure the dimensions
GENERAL ARRANGEMENT OF SUPPORT PS-13 AT NODE 2260
LINE NO.-2"-G8101-H90
REST+GUIDE(N-S)(GAP 18MM)
150
115
REFER NOTE 1 REFER NOTE 1
0 100
400 18 18
REFER NOTE 1
Note =1. Use GNFC Fabricated Support Arrangement for 2 inch Line support, GNFC to ensure the dimensions
REFER NOTE 3
160
ISMB MEMBER
VERTICAL PIPE
GUIDE L ANGLE
BOLTING ARRANGEMENT
ASSEMBLY
U-BOLT
ASSEMBLY
GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
CONTINUATION ON PG.2 FOR PLAN VIEW
DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-15 AT NODE 2430
LINE NO.-2"-G8101-H100
CONTINUATION FROM PG.1
ISMB MEMBER
2"-G8101-H100
GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-16 AT NODE 2490
LINE NO.-2"-G8101-H100
ISMB MEMBER
LIMIT LUG
VERTICAL PIPE REFER DETAIL A
BOLTING
ASSEMBLY
GAP 0 mm
U-BOLT
GNFC TO ENSURE
ASSEMBLY
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
GUIDE L ANGLE
ARRANGEMENT
LIMIT LUG
REFER DETAIL A
ISMB MEMBER
2"-G8101-H100
GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 0 MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-17 AT NODE 285
LINE NO.-1"-SHHP-G8101-H50
ISMB MEMBER
VERTICAL PIPE
GUIDE L ANGLE
BOLTING ARRANGEMENT
ASSEMBLY
U-BOLT
ASSEMBLY
INSULATION
GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
CONTINUATION ON PG. 332 FOR PLAN VIEW
DO NOT REST+4-WAY GUIDE (N-S)(E-W)(GAP 10MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-17 AT NODE 285
LINE NO.-1"-SHHP-G8101-H50
CONTINUATION FROM PG. 331
ISMB MEMBER
1"-SHHP-G8101-H50
GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 10MM ON EACH SIDE)
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-18 AT NODE 294
LINE NO.-1"-SHHP-G8101-H50
VERTICAL PIPE
BOLTING
ASSEMBLY
U-BOLT
ASSEMBLY
INSULATION
GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
CONTINUATION ON PG. 334 FOR PLAN VIEW REQUIRED
DIMENSIONS
1"-SHHP-G8101-H50
GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION
VERTICAL PIPE
PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 0MM ON EACH SIDE)
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-19 AT NODE 395
LINE NO.-1"-SHHP-G8101-H50
ISMB MEMBER
VERTICAL PIPE
GUIDE L ANGLE
BOLTING ARRANGEMENT
ASSEMBLY
U-BOLT
ASSEMBLY
INSULATION
GNFC TO ENSURE
SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
CONTINUATION ON PG. 336 FOR PLAN VIEW DIMENSIONS
ISMB MEMBER
1"-SHHP-G8101-H50
GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
DO NOT REST+4-WAY GUIDE (N-S)(GAP 5MM ON EACH SIDE) (E-W)(GAP 10MM ON EACH SIDE)
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-20 AT NODE 405
LINE NO.-1"-SHHP-G8101-H50
1"-SHHP-G8101*H50
REFER NOTE 1
3 MM
GUIDING MEMBER
50
GNFC TO ENSURE
GAP 22 MM SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
50
REFER NOTE 2
PS-B2
NOTE:-1. GNFC TO ENSURE DIMENSION OF GUIDING MEMBER.
2. USE L ANGLE OR ANY SECONDARY STEEL AS A GUIDING MEMBER ACCORDING
TO SITE FEASIBILITY.
PS-B2-6"
PS-B2
GENERAL ARRANGEMENT OF SUPPORT PS-22 AT NODE 4055
LINE NO.-6"-SHP-CS-600#-H80
158
MM
MM
10
VERTICAL PIPE
GUIDING LUGS
400
MM
INSULATION
320
MM
REFER NOTE 3
REFER
NOTE 3
GNFC TO ENSURE
REFER SECONDARY
NOTE 3
STRUCTURE
8 MM
LOCATION
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-22 AT NODE 4055
LINE NO.-6"-SHP-CS-600#-H80
CONTINUATION FROM PG.339
GNFC TO ENSURE
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(GAP 2MM ON EACH SIDE) (E-W)(GAP 1MM ON EACH SIDE)
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
GENERAL ARRANGEMENT OF SUPPORT PS-23 AT NODE 4120
LINE NO.-6"-SHP-CS-600#-H80
PIPE SHOE
GUIDE(E-W)(GAP 15 MM)
HOLDOWN(N-S)(GAP 2 MM) EACH END CL EL102.800
H
REFER NOTE 1
210
C CHANNEL
1000
~455
VARIABLE SPRING L
REFER NOTE 2
BOTTOM MOUNTED
TO BE WELDED 300
~190
~3364 L
WHERE,
GNFC PROVIDED SECONDARY MEMBER
H= HEIGHT OF ISMB/C -CHANNEL
L= HEIGHT OF F-TYPE SPRING CAN GUIDE L ANGLE
2" SCH 160 TRUNNION 200MM LONG
C= HEIGHT OF PIPE SHOE ARRANGEMENT WITH 6MM THICK SQUARE BASE PLATE
GUIDE(E-W)(GAP 15MM)
VARIABLE SPRING
EACH SIDE BOTTOM MOUNTED
C CHANNEL 6"-SHP-CS600#-H80
REFER
3 NOTE 4
~100
150
400
REFER
NOTE 4
Note =1. Use the shoe from existing LINDE support standard.
2. 50x25x10THK stopper cut from scrap plate of corresponding pipe material spec and
shop welded on pipe as shown in the above figure. (4Nos. per shoe)
3. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
4.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-25 AT NODE 4220
LINE NO.-6"-SHP-CS-600#-H80
REST SUPPORT
REFER NOTE 3
265
210
REFER NOTE 3
150
400
REFER NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-26 AT NODE 4840
LINE NO.-6"-SHP-CS-600#-H80
150
400 12 12
REFER
NOTE 3
REFER
NOTE 4
BDG1-2-6"-300-N-S
6
LINE NO.-6"-SHP-CS-600#-H80
GENERAL ARRANGEMENTOF SUPPORT PS-27 AT NODE 8940
REINFORCING PAD REQUIRED REST+LIMIT STOP(N-S)(GAP 0MM)
REFER
NOTE 3
160
265 210
REFER REFER
NOTE 4 NOTE 4
10 0
150
400 12 12
REFER NOTE 4
Note =1. Use the shoe from existing LINDE support standard.
2. 50x25x10THK stopper cut from scrap plate of corresponding pipe material spec and
shop welded on pipe as shown in the above figure. (4Nos. per shoe)
3. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
4.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-30 AT NODE 5240
LINE NO.-6"-SHP-CS-600#-H80
265
210
REFER
NOTE 3 REFER
NOTE 3
0
150
400
15 15
REFER
NOTE 3
Note =1. Use the shoe from existing LINDE support standard.
2. Use the same Rest shoe arrangement mentioned in LINDE support standard for both
Alloy steel and Carbon steel pipe
3.GNFC to ensure the Shoe Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-31 AT NODE 5500
LINE NO.-6"-SHP-020-11K-IH
REST+GUIDE(N-S)(GAP 0MM)+LIMITSTOP(E-W)(GAP 0MM)
GAP 0 MM GAP 0 MM
REFER
NOTE 1
~100
GAP 0 MM
125
REFER
NOTE 1
10
REFER
NOTE 1
ISMB MEMBER
LIMIT LUG
REFER DETAIL A
VERTICAL PIPE
BOLTING
ASSEMBLY
GAP 0 mm
U-BOLT GNFC TO ENSURE
ASSEMBLY SECONDARY
STRUCTURE
LOCATION AND
REQUIRED
DIMENSIONS
GUIDE L ANGLE
ARRANGEMENT
LIMIT LUG
REFER DETAIL A
ISMB MEMBER
2"-G8101-H100
GNFC TO ENSURE
U-BOLT
SECONDARY STRUCTURE
LOCATION
PLAN VIEW
VERTICAL 4 WAY GUIDE SUPPORT (N-S)(E-W)(GAP 0 MM ON EACH SIDE)
GENERAL ARRANGEMENT OF SUPPORT PS-33 AT NODE 5720
LINE NO.-6"-SHP-018-11K-IH
ANCHOR SUPPORT
REST+GUIDE(E-W)(GAP 3MM)+LIMITSTOP(N-S)(GAP 5MM)+HOLDOWN(GAP 3MM)
L-CHANNEL MEMBER
GAP 5 MM GAP 5 MM
REFER
NOTE 1
~100
U-BOLT ASSEMBLY
FOR 6" PIPE
(REFER NOTE 3)
L-CHANNEL MEMBER
10
125
REFER NOTE 1
PS-B2-6"
PS-B2
GENERAL ARRANGEMENT OF SUPPORT PS-35 AT NODE 5820
LINE NO.-6"-SHP-018-11K-IH
REST SUPPORT
6"-SHP-018-11K-IH
EL+106.084 M
REFER NOTE 1
Note :- 1. GNFC to provide the secondary supporting structure and Ensure Respective
Dimensions.
GENERAL ARRANGEMENT OF SUPPORT PS-36 AT NODE 5840
LINE NO.-6"-SHP-018-11K-IH
ANCHOR SUPPORT
REST+GUIDE(E-W)(GAP 0MM)+LIMITSTOP(N-S)(GAP 0MM)+HOLDOWN(GAP 0MM)
L-CHANNEL MEMBER
GAP 0 MM GAP 0 MM
REFER
NOTES
~100
U-BOLT ASSEMBLY
FOR 6" PIPE
L-CHANNEL MEMBER
REFER 10
NOTES