COMMON INDEPENDENT INDEPENDENT INDEPENDENT TOTAL


PLANT FOR PLANT ROOM PLANT ROOM PLANT ROOM FOR STANDALONE
BLOCK 1, 2 & 3 FOR BLOCK-1 FOR BLOCK-2 FOR BLOCK-3 PLANT ROOMS

CAPACITY TR
CAPACITY AFTER DIVERSITY

NO. OF 700 TR WC CHILLERS


NO. OF 350 TR AC CHILLERS

1 WC Chiller capacity/each TR
Quantity Nos.
Chiller Power/each KW/TR
KW/TR WC CHILLER KW/TR

AC Chiller capacity/each TR
Quantity Nos.
Chiller Power/each KW/TR
KW/TR AC CHILLER KW/TR
Total chiller power KW
Total chiller TR TR
WC chiller cost each Rs.
AC chiller cost each Rs.
Total chiller cost Rs.
Operation cost per month Rs.

2 Total water consumption Litres/day


Cost /month in rupees

3 Condenser water pump


Pump cost/each Rs.
Pump KW/each KW
Quantity with standby Nos.
Total KW without standby KW
Total cost of cond. Pumps Rs.
Operation cost/month Rs.

3 Primary chilled water pump-1


Pump cost/each Rs.
Pump KW/each KW
Quantity with standby Nos.
Total KW without standby KW
Total cost of primary Pumps Rs.

1 of 4
Chiller Plant Comparison

COMMON INDEPENDENT INDEPENDENT INDEPENDENT TOTAL


PLANT FOR PLANT ROOM PLANT ROOM PLANT ROOM FOR STANDALONE
BLOCK 1, 2 & 3 FOR BLOCK-1 FOR BLOCK-2 FOR BLOCK-3 PLANT ROOMS
Operation cost/month Rs.

5 Secondary chilled water pump+ VFD


Pump cost/each Rs.
Pump KW/each KW
Quantity with standby Nos.
Total KW without standby KW
Total cost of second. Pumps Rs.
Operation cost/month Rs.

6 Secondary chilled water pump+ VFD-2


Pump cost/each Rs.
Pump KW/each KW
Quantity with standby Nos.
Total KW without standby KW
Total cost of primary Pumps Rs.
Operation cost/month Rs.

7 Cooling Tower + piping


Cost/each Rs.
Cooling tower KW/each KW
Quantity Nos.
Total KW KW
Total cost of tower, piping Rs.
Operation cost/month Rs.

8 Total Initial investment Rs.

9 Total KW without standby KW


Total connected TR TR
KW/TR KW/TR

10 Total running cost/month


a) Electricity cost Rs.
b) Water cost Rs.
Total electricity, water cost Rs.

11 Maintenance cost/annum Rs.

AssumpPiping cost in Basement Rs

2 of 4
Chiller Plant Comparison

COMMON INDEPENDENT INDEPENDENT INDEPENDENT TOTAL


PLANT FOR PLANT ROOM PLANT ROOM PLANT ROOM FOR STANDALONE
BLOCK 1, 2 & 3 FOR BLOCK-1 FOR BLOCK-2 FOR BLOCK-3 PLANT ROOMS
Plant room piping cost Rs.
Total Piping cost Rs.

TOTAL FIRST COST Rs.

Assumptions:
No standby pump considered in the power calculations
AHU, piping and riser piping cost being common are not included
Electricity Rs. Per unit 6.50
Water Rs./ 10 KL 1200
Loading factor common for all seasons 0.5
No. of hours of operation/day 12 hours
No. of days of operation/month 26 days

Running Cost of Power = Kw x 0.5 x 12hrs/day x 26 days/month x rate/unit (Rs.6.50 per unit)
Kw x 0.5 Diversity x 12 hours/day x 26 day/s month x Rs. 6.50 Electrical cost per KWH = 1014
Constant 1014 Rs. Per KW/day
Cost of water = No. of litres/day x 0.5 x 26 days/month x rate/lit (Rs. 1200/10 KL)
No of litres/day x 0.5 diversity x 26 days a month x cost of water (Rs. 1200/10 KL) = 1.56
Constant 1.56 Rs. Per lit/day

ADVANTAGES

3 of 4
Chiller Plant Comparison

COMMON INDEPENDENT INDEPENDENT INDEPENDENT TOTAL


PLANT FOR PLANT ROOM PLANT ROOM PLANT ROOM FOR STANDALONE
BLOCK 1, 2 & 3 FOR BLOCK-1 FOR BLOCK-2 FOR BLOCK-3 PLANT ROOMS

DISADVANTAGES

4 of 4

You might also like