You are on page 1of 17
fos SMS ENGINEERING CONSULTANTS] D-6, HiGHWay APTS., SIGN East, Mumpar-22. @ 98207 75150} Payment Certificate No. 17 Date: Project: Structural Repairs & Rehabilitation wks. Contractor: TECHBUILD GST no. 27AADHM2306J1ZD Reference: RAA. Bill No. 17 Dated: 25-Jul-19 Sr.No. Details of Bil Rate Amount, Re. 1 Amount of bill submitted by contractor ne 52,21 068) 2 Amount of bill as per Tender BOQ after checking 2,52,21 068 -20,000 Value of work done 52,01, 068} Add for Taxes: cast 9.00% 22,68,096 SGST 9.00% __22,68,096] “ Gross Bill Amount 2,97,37,260 3 Recoveries: 3.1 Retention deducted 5.0% — 12,60,053 3.2 Reten. released 2.50% 1,78,85,105 -447,128 3.3 TDS by PHFOCHS 8,12,926 812,926) 4 Adhoc payment made till date 26,830,560 To be checked by PHFOCHS AMOUNT CERTIFIED AGAINST THIS INVOICE 20,93,775 for SMS ENGINEERING CONSULTANTS : ee Signatory SANJAY SACHDEV Advance RAI RA2 RAS RA4 RAS RA6 RAT RAS RAS RA 10 RA 11 RA 12 RA 13 RA 14 RAIS RA 16 TB PAYMENT RECEIVED Cheque at. Bill ot. full recovered 3-Apr-18 12-May-18 25-Jun-18 22-Aug-18 44-Oct-18 4-Dec-18 23-Dec-18 18-Jan-19 RA 17 Part Retention release Amount 15,00,000 18,51,667 15,60,050 17,02,592 20,75,238 13,95,949 11,94,300 12,14,627 12,21,910 15,57,184 13,56,819 16,92,970 13,92,605 11,28,138 15,483,617 12,17,941 13,31,224 18,983,727 TDS Net 16,98,644 18,80,575 17,72,205 21,01,980 15,00,841 13,22,389 13,40,378 10,81,336 13,78,039 12,00,725 14,98,204 PC Tender Sr. No. Description of Item unit| "Rote (A)_|GENERAL TEMS: ‘At [Providing and erecting scaffolding | sat 125] ‘AZ |Removing existing steel grils al stacking. sat. 25.4 ‘AS |Refixing of grils includ, Modifn, sa. 50.9) A4 |Providing & erecting plywood) lcovering sat. 273) ‘AS Safety platform for arresting falling| debris sqft. 297 ‘AG [Providing Safely Net sat. 27| ‘Sub Head Totall_(A) | 1,186,104 (B) | STRUCTURAL REPAIRS AND PLASTER - EXTERNAL B.t_|Dismantiing of plaster sq.ft. 124 8.2 [Breakina/ Chipping concrete san. 25.5 B.3 Joint stiching with C.M. 1:3 and laggregate eft 40.0 B.4 [Providing and applying Epoxy Kg 200.0) B.5 [Providing and applying rust passivator lit 300.9] B6 |Providing steel reinforcements for lext. repair! strengthening Kg 100.0) B7 [25 mm Ploymer modified cemeni Imortar inoluding bond coat, safe 150.0) B.8_ [Providing jacketing with Concrete Mix IM-25 (1:4:2) 25-40 mm. thk. cust 424.7) B.9 Providing Micro-concrete including form work. kg. 85.0 B10 [Concrete Mix M-25 (1:1:2) for Chajas| J drop pardi cust. 566.3] B11 |Cast chajjas Conc. M15-4"thk | sq.ft. 130.0 5.12 [Proving reinforcements for new] R.C.C. chaija kg 100.0 B13 [Anchoring the reinforcement bars| lwith HILTI injectable mortar nos. 300.0] B14 |One coat of plaster J Dash coat in Cement Mortar 1:4 sat 59.9] B.15_|External plaster in two coats sq.ft 25.0 B.1a [Ready Mix Ext. plaster in two coats| sq 93.0] B16 |New precast RCC jal includes removing the existing sq.ft, 300.9] B17 [Coping with Concrete Mix M-25 (41:2), avg, 4" thick. sq 100.0 ‘Sub Head Total] (8) | 10,553,721 (C) | STRUCTURAL REPAIRS AND PLASTER. INTERNAL ‘C.4_[Dismantiing of plaster sat. 14.9] ‘C2 _ Protecting the flooring with POPY floor] protector sq.ft. 273) ‘C3 [Providing reinforcements kg 100] ‘C.4_|Providing and applying Epoxy Kg 900] CS [Providing and applying rus passivator ‘| Hit 300] 27/07/2019 27/07/2019 Description of Item Unit 25 mm Ploymer modified cement Imortar including bond coat. sq.ft. Providing Micro-concrete _including| {form work. Kg. 20 mm. internal plaster in CM. 1 including finishing of the surface fine| lwith POP. ‘Sub Head Total] PAINTING ITEMS: [Apex Ultima 2 coats + one coat off imer sa.ft. JApcolite Asian 2 coat * one coat off {Yellow primer. sat. ISNOWCEM paint 2 coat to [compound wall sat. Painting pipes 4” and above dia, eft. ‘Sub Head Total] _(D_ RAINWATER PIPES 110 mm dia. rain water PVC pipe including fittings ft, Making holes in for RW pipes | making good the hole nos. Making holes in for other pipes &| Imakir the hole. os. ‘Sub Head Total] (E MISCELLANEOUS WORKS BMC Liasion Work- Permission cost_|__LS| |On providing Insurances ts| Wat fing to Chaija toy ft] ‘Sub Head Total] [Structural Steel Platform work Phase - I Providing Structural Steel for Platform | Fabrication and welding of Structural steel mt] [Erection of Structural steel MT Fixing dia 12 Anchor bolts No, [Conc. pedestal for steel columns No, Phase [Cutting & removing platform MT Re Erection of Structural steel MT Less Scrap Value of steel MT ‘Sub Head Total] _(G) New Electric Panel Room (EPR) Dismantling brick masonry walls i Dismantling of RCC Slab, ft. Removing Doors & Windows ft. RCC wall incl shutterit cu.ft. [Steel reinforcements for above. President House, Colaba: Structural Repairs Rehabilitation work Page 2 of 12 27/07/2019 Description of Item [9° thk. Brick work. RCC slab [Steel reinforcements for above [PCC for plinth Brick bat coba waterproofin, Internal Plaster [External Plaster [Ceiling Piaster ‘above Door & Window “ement paint [Marble frame for D & W JAI. Powder coated Bakelite Door (3x 6.5 |Al. Powder coated louvers Kota stone sit out ‘Sub Head Total] lew & Sho ismantling_brick masonry walls jismantiing of RCC Slab jemoving Doors & Windows RCC columns inal shutterin feel reinforcements for above 9" thk. Brick work. RCC slab [Steel reinforcements for above Hilt for Colurnn [Brick bat coba waterproof Internal Plaster [External Plaster (Ceiling Plaster Lintel above Door oor & Windows marble frames. xing Old Windows jreaking old Floor ties ‘stone flooring in sho Floor tiles IPOP punnin [Lustre paint to wall & cell Electrical points [Electrical fitin Fan. [Temporary Electric supply lines Al. Powder coated toughened glass [Door (3 x 6.5) hs ltal|* BRS eeee eas ‘Sub Head Total [BEST Sub station repairs [Dismantling of plaster [Dismantling of old waterproofing Ja” thk. Brick work. [Brick bat coba waterproofi PMM repairs President House, Colaba: Structural Repairs Rehabilitation work Page 3 of 12 27/07/2019 Description of Item [internal Plaster [External Plaster Sub Head Total] [STAIRCASE WELL [Dismantling of plaster sqft. [25 mm Ploymer modified cement Imortar including bond coat. sat. Plaster Dash coat s Internal Piaster sq.ft [External Plaster 2 coats sat Providing brick work on inner face (above stait ft Providing RCC Lintel beam on inner| ledge (below stair) oust Reinforcement for intel K Marble frame in 2 ievels ft [Steel openable shutters ft Replacing broken Kola stone flooring sat. [Kota stone platform in niche: ft Plastic paint to Walls & celing indl| lambi.- part rate ft [Scrapping old paint from wooden] handrails ft [Scrapping old paint from steel railing eft Wooden melamyne matt finish spray] oish ft [Applying primer & 2 coats of Enamel int on steel rail eft Painting inner walls behind RCC jal & fire duct with Ultima sq.ft (Core cutting for cable on every floor 4.5" thk. Brick work [Closing hole for fire riser pi |Waterproofing to Chalja tog [Closing hole for fire alarm cable ine. |Grindin, ‘Sub Head Total] [COMMON PASSAGES Dismantling existing floor tiles. Breaking old false ceil floor files [POP false ceilin [Cut outs for lights Trap doors, Paintin ‘Sub Head Total President House, Colaba: Structural Repairs Rehabilitation work Page 4 of 12 27/07/2019 Description of Item UTILITY DUCT: CIVIL Dismantling brick masonry walls Dismantling of RCC Slab Removing wooden frames, [4.5" thk. Brick work internal Plaster RCC Lintel & slab [Steel reinforcements for above: [White wash internal surface. ‘Sub Head Total] [COMPOUND WALL [Dismantling of granite ti [Dismantiing of plaster [Brick wk.4.5" for damaged areas. Plaster on damaged brickwk. [Dash coat plaster to even out the level [Temporary office - GI shest roofing [Concrete coping ‘Supply wall tiles -Base price 61/sft Fix wall tiles- vitrified Fix & Removing tiles New 9° thk. Brick work [Excavation in stone mason/ concrete 2 RCC columns inel shutterin, [Steel reinforcements for above Fixing Kalinga stone claddi [Kalinga stone corner polish [Making grooves in wall Lay granite stone for steps & riser [Mouding for above, [Refix granite stone - steps & riser [SS car parking no. Plate ‘Sub Head Total CANOPY, [Dismanting brick masonry walls, [Dismantling of RCC Slab [External plaster [Concrete Mix M25 (1:1:2) for Chajjas| li drop pardi Providing reinforcements for new] RCC. chajja a [Anchoring the reinforcement bars with HILT injectable mortar ‘Sub Head Totall [STORM WATER DRAIN Dismantiing of R.C.C. Members brick masonry walls, cust. JExcavation in soil cust President House, Colaba: Structural Repairs Rehabilitation work Page S of 12 27/07/2019 Description of Item Unit Providing, laying and jointing 150] mm dia R.C.C. NP2 pipes eft] Rain water collection/ Catch pil chambers nos. ‘Sub Head Totall_(O) LOBBY Dismantling of plaster sq.ft Letter box wall dismanti [Dismantiing of False ceili saitt. [Disconnection of electric cables Ls [Dismantling of Security table PMN Saft. Plaster Dash coat [White wash internal surface 0 Js} en| me ra] [3 Lay floor tiles/ stone Lay Quartz floorin, Protecting the flooring with POPY floor] rotector }Susplying i Lay Italian marble Wall claddir Lay granite stone for steps & riser Moulding & Polishin« Making grooves in Granite steps [Polishing of talian marble. EmBe alss/5 3/5 [>[> lVeener paneliin [Ptastic paint Dismantling of Niche Refiling of Niche with PCC. Electrical Wiring: Dismanting of floorin [Screed concrete LED lights, Fire proof doors, la [Concierge table Flower bed Laser cut panelit [Glass wall - 12 mm toughned ‘Sub Head Totall_(P) [TERRACE BEAUTIFICATION Dismantling of plaster Dismantling of old waterproofi [9" thk. Brick work [4.5" thk, Brick work President House, Colaba: Structural Repairs Rehabil Page 6 of 12 27/07/2019 Description of Item [PMM repairs Internal Plaster [External Plaster [Ceiling Plaster [Painting-Cement paint ‘Sub Head Total] RCC Jalli- cables & Jn. Box [Terrace Lighting- cables, switches &| Jn. Box [4 elevation box fagade lightin [Compound wall & Gate lightir al 4 core cable & Jn. Box. b| 4 core cable circuit ¢| Conduit with single core 2.5 wire 4 d | Driver over light- Conduit with single core 2.5 wire 4 run [MCB with LBD for Cwall ight [Chipping floor concrete for GI lconduits 4” thk. [Laying of GI pipe conduits in /ement Making chasel zari in wall- stair & Jexternal [Making hole in wall for junction boxes [Making cable trench covers int for Driver over lights |Sample light fitfings purchased [Sample light paid to Mr. Fhali [Basement cables rearrangement & removal of extra cables ‘Sub Head Total] Utility Duct Light Point- Conduit and wire [SAmps SPin Sw+Plu [Swatt- LED light fitting Pus LED Tube| [50mmDia PVC Pipe- MMS, 1st floor 1 [50mm round PVC junctior’ Box , 113box per floor *10 floor [50 mm Bend for Hathaway Main 5) /10°8 <,>PVC Junction Box + 1* 104 |Crown Connector<. > Salon mtn! ICABLE loop shoftin 100 PAIR MTNL main Jucntion Box + [Crown Connector 40 nu President House, Colaba: Structural Repairs Rehat Page 7 of 12 27/07/2019 Description of Item [PMM repairs Internal Plaster [External Plaster [Ceiling Plaster Painting-Cement paint ‘Sub Head Totall IRC Jalli- cables & Jn. Box [Terrace Lighting- cables, switches | JJn. Box, [4 elevation box fagade lighting [Compound wall & Gate lighti al 4 core cable & Jn. Box. | 4 core cable circuit ¢| Conduit with single core 2.5 wire 4 run. ‘| _ Driver over light- Main croult | Driver over light- Conduit with single core 2.5 wire 4 run f[ MCB with LBD for Cwall ight [Chipping floor concrete for GI lconduits 4" thk. Laying of GI pipe conduits in ment [Making chase/ zari in wall- stair & Jexternal Making hole in wall for junclion boxes Making cable trench covers int for Driver over lights. [Sample light fittings purchased [Sample light paid to Mr. Fhali [Basement cables rearrangement & removal of extra cables ‘Sub Head Total] Utility Duct [Light Point- Conduit and wire iSAmps Pin Sw#Pl [Swatt- LED light fiting Plus LED Tube [S0mmDia PVC Pipe- MMS, Ast floor 1 [50mm round PVC junction’ Box , '13box per floor *10 floor [50 mm Bend for Hathaway Main S) /10°8 <..>PVC Junction Box + 1" 10* |Crown Connector<, > Salon mini |CABLE loop shottin, 100 PAIR MTNL main Jucntion Box + [Crown Connector 10 nu President House, Colaba: Structural Repairs Rehabilitation work Page 7 of 12 Sr. No. Description of Item Unit Tender ao 160 Pair jelly Armoured Cable MTNL Main Loop from Salon Wast End - Basement - Intercom room RM. 391 ATO |4Pair Telephone wire <> from each fiat to Gr.Floor Intercom Room - IMTNL Junction Box RM. 40} Adi IMTNL Cable Jointer Payment Mr. PAJAPATI - CASH is 11,500) Ate H1Cx 2.5 sqmm Cu x4Run + earthing} lwires + Conduits <> 3P 4w + E for stair case lighting main <> Meter [Room to tarrace level RM. 265| Ate Utility - Cable duct side and front wall Jcriling utility cable loop out provisions. Gr.to tarrace level > no. 460| At Removal for Old cables for Cable |duct rea <> MTNL+ cable TV+ hathway+ conduits ete Ls 17,250) As [GI Bracket C - 12 INCH<.>AT 11 land tarrace floor for cable and wire [supports no. 299| Ate Hathaway cable installation for flat }902, since hathaway crew do not did linside house Ls 575| [Staircase Bt [Light Point- Conduit and wire B2 Cx 2.5 sqmm Cu x 4Run + earthing lwires + Conduits <> 3P 4w + E for stair case lighting main <> Meter Room to tarrace level RM. BS Reshifting of Power Loop wires for [Staircase Light Points due change of [Power Ckt mains from fire Duct to RCC Jali area BF Fire duct Siab driling as per site lenginne instruction<. Grto tarrace level for conduit Installation Be [Removal for Old cables for staicase_ larea <> MTNL+ cable TV+ hathway+ lights + conduits ete 23,000) Bo Lobby Ct Light Point- Conduit and wire no. oz SAmps 5Pin SwePlug no. os [Cat 6 Cable + PVC pipes DVR to LCD (GRx15m)+Intercom Room to |Tarrace (65m)+MTNL Cable Loop for IBIGUINE Salon(2"10m) RM 75| C4 IRG6 TV Cable + PVC pipes<> DVR to LOD (2Rx15m) RM 64 Cs HDMI Cable with Conduit Fixible <> JDVR to LCD area (2*15M) RM 242] nt House, Colaba: Structural Repairs Rehabil 27/07/2019 Page 8 of 12 Sr.No, Description of Item Tender Unit | Rate Ce Cx 4 sq.mm Cu x SRun - wires + [Conduits <>Single Phase POWER [CIRCUIT Main ckt Meter R to Intercom R + Security desk RM. C7 [4c x 2.5 Sq mm Cu PVC Un Armored [cable for Fire Detector Loop In loop ]Out total 5 Points EPR- Developments Connection [4Core x 2.5 sq.mm Cu Armored |Cable from tarrace Level Booster Pump to EPR Room for Remote Start - Stop Push buttion Loop - Via Cable |duct + Basements RM D2 [4Core x 2.5 sq.mm Cu Armored \Cable from tarrace Over Head tank |HWI sensor to EPR Room for [Remote Start - Stop Push buttion Loop - Via Cable duct + Basements Ds [4Core x 4 sq.mm Cu Armored Cable {from tarrace Level Booster Pump to [Meter room For Power Mains <> via Icable Duct 2 ‘Sub Head Total PAVEMENT WORKS [Removing Kota stone flooring [Chipping conerete for levelling [Supply Pavit - Base price 71/sq.ft aying Pavit tile flooring [Screed concrete Waterproof coating Nlola}alo}o| 5] [Concrete slab incl. form - chamber [sealing [Steel reinforcements for above. Dewatering of UG Fire water tank [Excavation in concrete ale}oloo Backfil with granular material &| lcompaction 2 Jo" thk. Brick work 13, [Laying Paver blocks- footpath 4 [Cast Iron covers for FW tank- 52 kg os. 9,433} 15 [Cast Iron covers for UGWI- 38 kg. nos. 7.218) 16 [Cast Iron covers for SWD- 12 kg os. 3,106] ‘Sub Head Totall [GATES FOR BUILDING L Sliding Gates with rollers running on lfoor mounted 16 mm solid rod with base ISMC 100 structural steel Jchannel. Item also includes for guide |roliers- East side Gate saft President House, Colaba: Structural Repairs Rehabilitation work 27/07/2019 Page 9 of 12 as 27/07/2019 Description of Item [Single leaf shutter Gates mounted on heavy duty hinges, etc complete. Gates of size 5'x7" Sliding Gates with rolers running on HRoor mounted 16 mm solid rod with base ISMC 100 structural steel Jchannel. Item also includes for guide rolires- West side Gate with 2 shutters (11.06.19 email of TB) Fixed railing with Material and labour| material to be used 25 X 50- Pipe -14| |Gauge Bright steel (24.05.19 email of ITB)- east side Fixed railing with Material and labour| material to be used 25 X 50- Pipe ~14| |Gauge Bright steel (26.06.19 email of [TB)- north side Painting of grils ‘Sub Head Total] _(U) [Temporary 4” dia. Rainwater rt [Core Cutting: [Core cutting * dia Tos. [Core cutting 3° dia nos, [Core cutting 5° dia [Core cutting 7" dia [Side wall hole maki pe JAC conden: e- 1 dia [Rainwater pipe- Cast iron 4" dia. Soil pipes - Cast iron 4” dia. [Waste pipes - Cast Iron 3" dia. Removing old Cl pi [Submersible pumps installation including manifold, NRV, testing, lcommissioning, etc. complete Fixing new Gl pipes- 50mm dia, Removing old Gi pioes ‘Sub Head Total [Basement Ramp south wall [Dismantling of plaster sai Dismantling of RCC grills sai RCC columns indi. shutter cu [4” thk. Brick work E External Plaster E ft ft President House, Colaba: Structural Repairs Rehabilitation work Page 10 of 12 5 6 T 8 9 40 4 12. 13, a > d 14 15 16 7 18 19 20 24 Description of item Unit Water proof watta at base rf. sacft ‘Sub Head Total] |Ground floor - Tile claddi [Dismantling of plaster [Brick wkork 4.5" thk. Plaster - to match wall tiling Wi. [Supply wall tiles Base price 6t/sht [Fix wall tiles- vitrifi Fixing Kalinga stone - window border ‘Sub Head Total] [Cutting & removing platform Providing Structural Steel for Column |& beam [Fabrication and welding of Column & lbeam RCC slab Mix M-25 (1 [Tiled floorin, [Railing- steel & wood ‘Sub Head Total EXTRA ITEMS, [Breaking Kota stone - Tianu sh Removing Galvume sheets of 1st lloor & 11th [Old Office cabin dismantlin Plywood partition for 1st floor balcony [Temporary 4" dia. Rainwater pipe [Thermocole window covering Dismantling of Siporex walls [BEST cap closing- welding plate Vegetation removal chemical [New Light wt Block Masoni Fixing of Steel props telescopic RCC Jalli Sample fix & remove re Cut re cutting da ‘outing 3° dia ore cutting 5° dia re cutting 7" dia ide wall hole makin; C condensate pipe- 1 dia \G condensate pipe- 1 ‘dia ving existing waterproofin rick bat water proofin rick masonry 11 mm thk, rick masonry 230 mm thk. fomove Boilers on west side President House, Colaba: Structural Repairs Rehabilitation work 27/07/2019 Page 11 of 12 27/07/2019 Description of Item [Shifting GI pipe on Tst floor west side nos, 600 [Shifting 7 rerouting electrical wires on 1st floor baleom Ls 800] Mosquito fogci Imonth| 2,000) Fixing of Tarpualin sheets for rain ion sq.ft. [Drip mould on 1st floor north side rit [Cleaning debirs on South side wall labour [Rainwater pipe- Cast Iron 4” dia, rit [Soil pipes - Cast iron 4” dia. rt Waste pipes - Cast iron 3 dia Removing old Cl pipes [Submersible pumps installation including manifold, NRV, testing, Icommissioning, etc. complete Fixing new Gl pipes 50 mm dia. [Removing old Gl pipes [Plywood partition in South side lpaloonies (email dt. 22.10.18) [Removing windows on South side baloonies Refixing of old windows & repairing bearing chi [50 W LED light in compound [Shifting of electrical wires - 1st Toor south side West side Gate shutter repair- welai [South side balcony window marble bottom sill (09.02.19 quote! 1st floor Mukhi open terrace marble lish - floor ‘st floor Mukhi open terrace marble lish - wall ‘1st floor Mukhi open terrace marble lish - skit ‘st floor Mukhi open terrace marble ish - moulding & polish [East side tree guard debris removal Removing old rolling shutter for basement, [Silicon sealant fil for Al. Windows ‘Sub Head Total] (E.1) 7 TOTAL 1,43,59,319| cesT 9.00%} SGST 9.00%] GRAND TOTAL President House, Colaba: Structural Repairs Rehabilitation work Page 12 of 12 { kepys Y GA SMS ENGINEERING CONSULTANTS ym) * PMC * VALUATION * REHAB * NDT OFFICE: D-6, HIGHWAY APTS., SION EAST, Mumaar-zz. “@ 98207 75150 INVOICE GSTIN No.: 27AGDPS7169R1ZB PAN : AGDPS7169R INVOICE NUMBER: —R/19-20/15 DATE: 25-Jul-19 To, Hon. Secretary/ Chairman President House Flat Owners C.H.S. Colaba, Mumbai - 400 005 |GST no. 27AADAPO650K1ZJ Subject: Consultancy Services Bill - Structural Repairs PC 17 R.A billno. Description Less Electrical Amount, As. 17 Total Value of works done 2,97,37,260 -1,138,852 2,85,98,409 16 Previous bill certified value 2,75,50,840 -841,295 —2,67,09,545| Value of works certified this bill 7,888,863 Net Value of work certified Rate Fees towards Consultancy Services 18,868,863 45% 84,999] (Cost of tiles purchased by PH directly 19,42,325 3.5% 67,981}: TOTAL 152,980 Add: CGST 9.0% 13,768 Add: SGST 9.0% 13,768| AMOUNT DUE AGAINST THIS INVOICE 165,219] | Me dy! ae 7 Authorised Signatory SANJAY SACHDEV REGO. OFF.: E701, LINK PALACE, SAIBABA COMPLEX, GOREGAUN (E), MUMBAFGS Date Vendor, Deseription unit | Qty | Amount [| Asveqi 10-Sep-18] Bombay Engg. [Submersible pump nos[ 2] 47,040[ 23,520] 23-Nov-18|Elegant marble [Grey Dorado sq.ft|796| _7,08,693] 891 7-Mar-19|Prime ceramics sqit| 150] 75,874] 506| 7-Mar-19[Prime ceramics [Full body vitrified tle sqft] 920/7,33,104] 145 S-Mar-19[Classic marble [Quartz slab- milano 20mm _|_sq.ft.| 641] __2,70,415 500] 18-Mar-19|Kalpataru Ind. inground fittings nos.[15{_17,388| 1,159] 7-May-19{Vishal LED walls nos.|28[ 83,104] 2.968 7-Mar-19|Prime ceramics [Granite nero boxes! 15[18,054[__1,204 14-May-19|Prime ceramics |kalinga metropolitan sq.ft.[" 200[ 7,00,182] 501 16-May-19|Prime ceramios [Granite nero sq.ft. 7,000] 1,43.370] 143] 20-May-19] JEGL outdoor wi nos.[ 25[ 19,600) 784 22-May-19] EGL outdoor wall nos 29[64,960[ 2,240 4-Jun-19| various nos] 32| 27.776] 868] 7-Jun-19|Prime ceramics |Full body vitrified fle sqit.[ 1,024] 7,48, 160] 145| 12-Jun-i9[Classic marble [Quartz slab- milano 20mm | sq.ft.|_ 98] 51,097 520] 22-Jun-19[Elegant marble |marble slabs sqft] 247 2,22,619| 202] 417-Jun-19|Prime ceramics — |kalinga metropolitan sqft.| 100) 51,802 518] 28-Jun-19|Prime ceramics |Full body vitrified tile sq.ft. 136[ 18,955 139] 4-Jui-19]Vishal lights nos.| a2 24,072| 752] 22,26,265 3,21,512| 9,31,312| 6,89,507| 2,83,940] I 19,42,325

You might also like