Raw Material Preparation Department

This department has 4 main steps and these are grinding, and homogenizing. The preparation of
cement raw materials is designed with calcareous materials, clayey materials and slight corrective
material in proper extent, and granulated into certain fineness.

Furthermore, this department has 2 stacker and reclaimer. These two are necessary part in
cement production line as a vital role in the limestone pre-homogenization, stabilize the condition of
cement kiln, ensure the clinker quality. The stacker and reclaimer has the capacity of 2,000 tons per
hour and the reclaiming speed of 0.04 meters per minute. Moreover, there are 3 sets of cement ball
mill. This is widely used in the industry of the cement as it processes the material into powder like
substance. This has the production capacity of 615 tons per hour.

References:

 AGICO Cement. Preparation of Cement Raw Materials. 2019. Accessed on October 23, 2020
from http://www.cement-plants.com/raw-material- production/#:~:text=The
%20raw%20material%20production%20of,crusher%2C%20imp act%20crusher%2C%20etc.
 AGICO Cement. Stacker and reclaimer. 2019. Accessed on October 23, 2020 from
http://www.cement-plants.com/raw-material-production/stacker-and-reclaimer/
 AGICO Cement. Cement ball mill. 2019. Accessed on October 23, 2020 from
http://www.cement-plants.com/raw-material-production/cement-mill/ball-mill/