DRAINAGE AND SLOPE

PROTECTION DESIGN
STANDARDS
SESSION
IX.a

Engr. Geromie Operario


Resource Person
Typical Cross Section
Road Right of Way:
15 m - Provincial Roads
10 m - Municipal and Barangay Roads

SIDE DRAINS
Common Implications for Roads with Improper
and Insufficient Drainage System
2018 CMGP

FLOODING SCOURING
Common Implications for Roads with Improper
and Insufficient Drainage System
2018 CMGP

POTHOLES SHOVING/PRESENCE OF MUD


Common Implications for Roads with Improper
and Insufficient Slope Protection
2018 CMGP

SOIL EROSIONS/LANDSLIDES
DRAINAGE AND SLOPE
PROTECTION DESIGN
STANDARDS
SESSION
IX.a Drainage Design

Engr. Geromie Operario


Resource Person
DRAINAGE DESIGN REFERENCES

DPWH Road Construction and Maintenance Management Manual

Design Guidelines, Criteria & Standards Volume 4 Highway Design 2015, BoD, DPWH

DILG Local Road Management Manual

International Bank for Reconstruction and Development, 2005

Standard Drawings for Roads and Bridges


SIDE DRAINS
- required along the side of
the roadway to collect and
transport water running off 2018 CMGP
the cross-fall of the road
surface.

DPWH Road Construction and Maintenance Management Manual


DRAINAGE DESIGN PROCEDURES

SURVEY AND INVESTIGATIONS

RAINFALL ANALYSIS

RUN-OFF ANALYSIS

DESIGN PARAMETERS & CALCULATIONS

DESIGN OUTPUT
TOPOGRAPHIC MAP

2018 CMGP
2018 CMGP

● Provide drainage if
the Longitudinal
slope is 0.50% and
above.

DPWH Road Construction and Maintenance Management Manual


SIZES and TYPES of SIDE DRAINS

2018 CMGP

● Size and type should be based on pavement surface runoff and catchment area
● Design flood frequency is 5 yrs. and flood frequency is 10 yrs
TYPES of SIDE DRAINS

2018 CMGP EARTH DITCH

LINED CANAL
EARTH DITCH
- maximum gradient of 5%
2018 CMGP
- Minimum depth of 0.6 m below the roadway

- For flat bottomed profile, should ideally be wide


and shallow with minimum depth of 0.3m below
the roadway

- for flat bottomed ditches, the side slope and


back slope should have less than 1:4 ratio but
not less than 1:2 ratio
2018 CMGP

TURNOUTS are extensions of ditches that redirect water into the vegetated buffers and
disperse runoff before it can cause erosion.
LINED SIDE DRAINS

2018 CMGP
Lining of side drains with structure
should only be used where the
turbulent or high velocity flow in
excess of 1m/second cannot be
reduced or controlled by other
means.
SIDE DRAINS TYPES & CONNECTIONS

2018 CMGP
LINED SIDE DRAINS MATERIALS

2018 CMGP

GROUTED RIPRAP
CONCRETE HOLLOW BLOCKS

STONE MASONRY
SIDE DRAINS

2018 CMGP

Location of the Lined Canals should also be properly labeled in the PLAN
SIDE DRAINS

2018 CMGP

Location of the Lined Canals should also be properly labeled in the STRAIGHT LINE
DIAGRAM
SIDE DRAINS

2018 CMGP

Location of the Lined Canals should also be properly labeled in the PROFILE
SIDE DRAINS

2018 CMGP

Location of the Lined Canals should also be properly labeled in the CROSS SECTION
DIAGRAM
SIDE DRAINS
SCHEDULE

2018 CMGP
CROSS DRAINS
Road Right of Way:
15 m - Provincial Roads
10 m - Municipal and Barangay Roads

SIDE DRAINS

- structures used where the


road intersects a
watercourse.
DRAINAGE DESIGN PROCEDURES for CULVERTS

SURVEY AND INVESTIGATIONS

HYDROLOGIC ANALYSIS (Discharge)

HYDRAULIC and STRUCTURAL DESIGN

DESIGN OUTPUT
TOPOGRAPHIC MAP

2018 CMGP
DESIGN CONSIDERATIONS for CULVERTS

2018 CMGP

RCPC minimum size: 910 mm Ø


DESIGN CONSIDERATIONS for CULVERTS

2018 CMGP

Cover
-should be 0.6 meter
DESIGN CONSIDERATIONS for CULVERTS
Pipe culvert: 15-year flood with sufficient freeboard to contain the 25-year flood return
period
2018 CMGP
DESIGN CONSIDERATIONS for CULVERTS

Box culvert: 25-year 2018 CMGP


flood with sufficient
freeboard to contain the
50-year flood return
period
DESIGN CONSIDERATIONS for CULVERTS
Freeboard is the vertical distance between the design water surface and the ceiling
of cross drain. The freeboard criteria is2018
1 foot
CMGPminimum is required.
DESIGN CONSIDERATIONS for CULVERTS
 Minimum velocity: 0.8m/sec
 Maximum2018velocity:
CMGP 5m/sec
DESIGN CONSIDERATIONS for CULVERTS

OUTLET SCOUR CONTROL 2018 CMGP


DESIGN CONSIDERATIONS for CULVERTS

Headwall
2018 CMGP

Wingwall

Catch Basin

Apron
RCPC: Reinforced Concrete Pipe Culvert Typical Cross Section

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
2018 CMGP
2018 CMGP
2018 CMGP
CROSS DRAINS

Box culvert: 25-year 2018 CMGP


flood with sufficient
freeboard to contain the
50-year flood return
period
RCBC: Reinforced
Concrete Box
Culvert Typical
Section
2018 CMGP
2018 CMGP
2018 CMGP
RCPC CROSS SECTION RCBC CROSS SECTION

2018 CMGP

PLAN

PROFILE
2018 CMGP
DRAINAGE AND SLOPE
PROTECTION DESIGN
SESSION
IX.b Slope Protection
Design

Engr. Geromie Operario


Resource Person
Common Implications for Roads with Improper
and Insufficient Slope Protection
2018 CMGP

SOIL EROSIONS/LANDSLIDES
Typical Cross Section
Road Right of Way:
15 m - Provincial Roads
10 m - Municipal and Barangay Roads

SIDE DRAINS

STONE MASONRY
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

MINIMUM STANDARD: (H:V)


2018 CMGP

Cut Slope of 1.5:1 to 1:1 for Common Materials

Cut Slope of 0.5:1 to 1:1 for Rippable Rock

Cut Slope of 0.25:1 to 0.5:1 for Hard/Solid Rock

Minimum fill slope of 1.5:1

(https://www.google.com/url?sa=i&url=http%3A%2F%2Fwww.sinaiconstruction.net%2FLA-foundation-retrofit-blog%2Fslope-failure-repair-
options%2F&psig=AOvVaw0VqFMbZTvieyw1e1vWypRr&ust=1613918341899000&source=images&cd=vfe&ved=0CAIQjRxqFwoTCNC00r7Y-O4CFQAAAAAdAAAAABAD
SLOPE PROTECTION

2018 CMGP
SLOPE PROTECTION
DPWH Design Guidelines and
Standards, Vol. IV
2018 CMGP
DPWH DO No. 15 s 2020,
Annex A “Selection of Slope
Failure Countermeasures”

DPWH DO. 100 s 2020 - New


and Updated Standard
Plans for Various Flood
Control, Urban Drainage
and Coastal Structures (CY
2015-2019)

(https://www.google.com/url?sa=i&url=http%3A%2F%2Fwww.sinaiconstruction.net%2FLA-foundation-retrofit-blog%2Fslope-failure-repair-
options%2F&psig=AOvVaw0VqFMbZTvieyw1e1vWypRr&ust=1613918341899000&source=images&cd=vfe&ved=0CAIQjRxqFwoTCNC00r7Y-O4CFQAAAAAdAAAAABAD
SLOPE PROTECTION DESIGN PROCEDURES

SURVEY AND INVESTIGATIONS

SLOPE STABILITY ANALYSIS

SCOUR ANALYSIS

DESIGN OUTPUT
SLOPE PROTECTION DESIGN PROCEDURES

SURVEY AND INVESTIGATIONS

Should be provided on areas with:


- High risk of soil slope failure
- High water table
- Many records of slope failure
SLOPE PROTECTION DESIGN PROCEDURES

SLOPE STABILITY ANALYSIS

 is a static or dynamic, analytical or empirical method to evaluate


the stability of earth and rock-fill dams, embankments,
excavated slopes, and natural slopes in soil and rock.
SLOPE PROTECTION DESIGN PROCEDURES

SCOUR ANALYSIS
Outlet protection may be required where:

 The outlet velocity exceeds the scour velocity of the bed or bank
material
 The outlet channel and banks are actively eroding
 Protection requirements may range from a riprap apron to stilling
basins and concrete structures
2018 CMGP

DPWH DO No. 15 s 2020, Annex A “Selection of Slope Failure Countermeasures”


2018 CMGP

DPWH DO No. 15 s 2020, Annex A “Selection of Slope Failure Countermeasures”


2018 CMGP

DPWH DO No. 15 s 2020, Annex A “Selection of Slope Failure Countermeasures”


2018 CMGP

DPWH DO No. 15 s 2020, Annex A “Selection of Slope Failure Countermeasures”


SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

Grouted Riprap 2018 CMGP


- use in Cut Sections
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

Grouted Riprap
2018 CMGP
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

Use Grouted Riprap in Cut Sections and Stone


Masonry in Cut/Fill Sections
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

Stone Masonry
- use in Cut/Fill Sections Sections
2018 CMGP
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

USE STONE MASONRY for Cut/Fill Sections


SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

Slope Drainage
Works
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

Sodding
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

Retaining Wall
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)
Crib wall
2018 CMGP
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

Mechanically
Stabilized Earth
(MSE) Wall
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

Gabions
2018 CMGP
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

Coconet 2018 CMGP


SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

Shotcrete
2018 CMGP
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP

Vetiver Grass
SLOPE PROTECTION
(refer to DPWH Design Guidelines and Standards, Vol. IV)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
DPWH DO 100 s 2020 - New and Updated Standard Plans for Various Flood Control, Urban Drainage
and Coastal Structures (CY 2015-2019)

2018 CMGP
Road Right of Way:
15 m - Provincial Roads
10 m - Municipal and Barangay Roads

SIDE DRAINS
Thank you
and God
bless! 