You are on page 1of 38

13.Aug.

2021 Page 1 / 38
ADD B DEFECT LIST 16:36 NHATHC

Defect Type : B ADD

VN-A222 Open Defects = 2


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

07.Sep.2021
07.Sep.2021 MEL 32-09-02A , CAT D B58238-08 MW#1 TPIS REMOVED ADD RAISED REF MEL 32-09-02A, CAT D, DEADLINE 07 AUG 2021
A222/WO 561880 25 Day
(Iss.Date: 09.Apr.2021 ) (Concession)
(Iss.Station: SGN) (CAAV)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

4611375003 WASHER ( Noted by DIEPTQ at 6:39 on 05.Aug.2021 )


4.00 438.00
(Request date: 05.Aug.2021 by DIEPTQ)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 2 / 38
ADD B DEFECT LIST 16:36 NHATHC

C20500100 MLG.WHEEL ASSY L0003719 ( Noted by DIEPTQ at 6:39 on 05.Aug.2021 )


(Request date: 05.Aug.2021 by DIEPTQ) (17.Oct.2019)
10.00
(Ordered by HUNGNT2)

L0000619
(19.Aug.2019)
20.00
(Ordered by TUANLA)

R0020019
1.00
(06.Sep.2019) (Ordered by QUANGTN)

R0032019
(29.Oct.2019)
1.00
(Ordered by TUNGVNA)

R0012619
1.00
(19.Aug.2019) (Ordered by DUNGLV)

L0007320
100.00
(04.Feb.2020) (Ordered by TUANNM)

R0025819 09.Jan.2021
1.00
(02.Oct.2019) (Ordered by TUANPV)

R0058420 09.Jan.2021
(23.Jan.2020)
1.00
(Ordered by HANT3)

R0253121 09.Jan.2021
1.00
(01.Jan.2021) (Ordered by NHATHC)

R0252721 09.Jan.2021
(01.Jan.2021)
1.00
(Ordered by HAIPD)

1.00 5.00 P0169921 26.Feb.2021


(03.Feb.2021)
10.00
(Ordered by QUYNHNTD)

P0169921 26.Feb.2021
8.00
(03.Feb.2021) (Ordered by QUYNHNTD)

R0379721 28.Jun.2021
1.00
(26.Jun.2021) (Ordered by TAITV)

R0340521 21.Apr.2021
1.00
(17.Apr.2021) (Ordered by TUANPV)

R0345221 26.Apr.2021
1.00
(23.Apr.2021) (Ordered by QUANTD)

R0377321 23.Jun.2021
(20.Jun.2021)
1.00
(Ordered by TUANPV)

R0377821 23.Jun.2021
(23.Jun.2021)
1.00
(Ordered by TUANPV)

P0218121 01.Jun.2021
(25.May.2021)
4.00
(Ordered by QUYNHNTD)

P0218121 01.Jun.2021
2.00
(25.May.2021) (Ordered by QUYNHNTD)

R0382821 02.Jul.2021
1.00
(28.Jun.2021) (Ordered by TUANPV)

R0382921 02.Jul.2021
1.00
(28.Jun.2021) (Ordered by TUANPV)

MS24665-134 PIN-COTTER ( Noted by DIEPTQ at 6:39 on 05.Aug.2021 )


3.00 3'635.00
(Request date: 05.Aug.2021 by DIEPTQ)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 3 / 38
ADD B DEFECT LIST 16:36 NHATHC

4133801030 PRESSURE TRANSDUCER ( Noted by DIEPTQ at 6:39 on 05.Aug.2021 )


1.00 4.00
(Request date: 05.Aug.2021 by DIEPTQ)

MS17825-4 NUT P0217921 14.Jun.2021 ( Noted by DIEPTQ at 6:39 on 05.Aug.2021 )


2.00 154.00 1'000.00
(Request date: 05.Aug.2021 by DIEPTQ) (24.May.2021) (Ordered by QUYNHNTD)

02.Nov.2021 MEL 31-30-07A , CAT D ADD B80372-06: PRINTER INOP (DUE TO PRINT CONTINOUSLY) ADD B80372-06: PRINTER INOP. MEL 31-30-07A. CAT D. DEADLINE
A222/WO 596620 81 Day
02NOV2021
(Iss.Date: 05.Jul.2021 )
(Iss.Station: HAN)

VN-A226 Open Defects = 2


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

05.Nov.2021 MEL 32-09-02B , CAT D ADD B129867-61: RH NW TPIS TRANSDUCER REMOVED ADD B129867-61: RH NW TPIS TRANSDUCER REMOVED IAW MEL
A226/WO 600285 84 Day
32-09-02B.CAT D.DEADLINE 05-11-21
(Iss.Date: 08.Jul.2021 )
(Iss.Station: HAN)

05.Nov.2021 MEL 32-09-02B , CAT D ADD B129867-60: LH NW TPIS TRANSDUCER REMOVED ADD B129867-60: LH NW TPIS TRANSDUCER REMOVED IAW MEL
A226/WO 600490 84 Day
32-09-02B.CAT D.DEADLINE 05-11-21
(Iss.Date: 08.Jul.2021 )
(Iss.Station: HAN)

VN-A260 Open Defects = 0


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

VN-A261 Open Defects = 0


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

VN-A262 Open Defects = 0


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

VN-A266 Open Defects = 1


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

20.Aug.2021 CDL 53-03-51 ADD B0056940-04: RH PANEL 191AR ONE CAMLOCS IS MISSING ADD B0056940-04: RH PANEL 191AR ONE CAMLOCS IS MISSING. ACC CDL
A266/WO 562946 7 Day
53-03-51 REV05 27NOV2020. DEADLINE: ASAP. SPEED TAPE APPLIED ACC
(Iss.Date: 15.Apr.2021 )
AMM 51-22-01-910-801-4 METHOD C. REV 68
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

CA18132 LIVE LOCK RETAINER RING ( Noted by TRUNGPB at 11:16 on 02.Aug.2021 )


1.00 100.00 đã nộp thuế, chờ giao hàng tại SGN
(Request date: 15.Apr.2021 by DIEPTQ)

CA18123-1 PIN, LIVE LOCK ( Noted by HAIPD at 13:44 on 12.Jul.2021 )


1.00 10.00
(Request date: 15.Apr.2021 by DIEPTQ)

VN-A269 Open Defects = 4


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 4 / 38
ADD B DEFECT LIST 16:36 NHATHC

18.Oct.2021 MEL 25-21-10-01 , CAT D B0081360-02 SEAT 19D RECLINE MECHANISM INOP ADD RAISED REF MEL 25-21-10-01, CAT D, DEADLINE: 18 OCT 2021 SEAT
A269/WO 585414 66 Day
SECURED AT UP RIGHT POS
(Iss.Date: 20.Jun.2021 )
(Iss.Station: UIH)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

AC71-48 RECLINE CABLE P0236721 17.Oct.2021 ( Noted by TUANPV at 13:47 on 20.Jun.2021 )


1.00 0.00 4.00
(Request date: 20.Jun.2021 by TUANPV) (19.Jul.2021) (Ordered by KHUONGNM)

18.Oct.2021 MEL 25-21-10-01 , CAT D B0081361-02 SEAT 14D RECLINE MECHANISM INOP ADD RAISED REF MEL 25-21-10-01, CAT D, DEADLINE: 18 OCT 2021 SEAT
A269/WO 585418 66 Day
SECURED AT UP RIGHT POS
(Iss.Date: 20.Jun.2021 )
(Iss.Station: UIH)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

AC71-48 RECLINE CABLE P0236721 17.Oct.2021 ( Noted by TUANPV at 15:56 on 20.Jun.2021 )


1.00 0.00 4.00
(Request date: 20.Jun.2021 by TUANPV) (19.Jul.2021) (Ordered by KHUONGNM)

18.Oct.2021 MEL 25-21-10-01 , CAT D B0081361-03 SEAT 20D RECLINE MECHANISM INOP ADD RAISED REF MEL 25-21-10-01, CAT D, DEADLINE: 18 OCT 2021 SEAT
A269/WO 585419 66 Day
SECURED AT UP RIGHT POS
(Iss.Date: 20.Jun.2021 )
(Iss.Station: UIH)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

AC71-48 RECLINE CABLE P0236721 17.Oct.2021 ( Noted by TUANPV at 15:58 on 20.Jun.2021 )


1.00 0.00 4.00
(Request date: 20.Jun.2021 by TUANPV) (19.Jul.2021) (Ordered by KHUONGNM)

03.Nov.2021 MEL 25-21-10-01B , CAT D B0080976-02: SEAT 8A RECLINE MECHANISM U/S B0080976-02: SEAT 8A RECLINE MECHANISM U/S; MEL 25-21-10-01B CAT D
A269/WO 599665 82 Day
EXP 03/11/21
(Iss.Date: 06.Jul.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

AC71-48 RECLINE CABLE P0236721 17.Oct.2021 ( Noted by TUNGVNA at 9:42 on 06.Jul.2021 )


1.00 0.00 4.00
(Request date: 06.Jul.2021 by TUNGVNA) (19.Jul.2021) (Ordered by KHUONGNM)

VN-A581 Open Defects = 13


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

26.Aug.2021 ADD B0081934-08: PLACARD: WATER DRAIN VALVE PANEL 192EB, 532CB, ADD B0081934-08: PLACARD: WATER DRAIN VALVE PANEL 192EB, 532CB,
A581/WO 586801 13 Day
533CB, 316AR AFT JACK POINT DAMAGE 533CB, 316AR AFT JACK POINT DAMAGE REF LMM 2.5.8 DEADLINE
(Iss.Date: 27.Jun.2021 )
(Concession)
27JULY2021
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D1121011744100 PLACARD P0238821 27.Jul.2021 ( Noted by HOANNV at 3:0 on 13.Aug.2021 )


1.00 0.00 10.00 GIAO HÀNG NGÀY 13/08
(Request date: 28.Jun.2021 by TUANPV) (23.Jul.2021) (Ordered by QUYNHNTD)

D1121004620000 PLACARD P0238821 27.Jul.2021 ( Noted by HOANNV at 3:1 on 13.Aug.2021 )


1.00 0.00 10.00 GIAO HÀNG NGÀY 13/08
(Request date: 28.Jun.2021 by TUANPV) (23.Jul.2021) (Ordered by QUYNHNTD)

D1121011743200 PLACARD P0238821 27.Jul.2021 ( Noted by HOANNV at 3:1 on 13.Aug.2021 )


1.00 0.00 10.00 GIAO HÀNG NGÀY 13/08
(Request date: 28.Jun.2021 by TUANPV) (23.Jul.2021) (Ordered by QUYNHNTD)

09.Sep.2021 MEL 35-30-01 , CAT D ADD B111666-4 AFT PORTABLE OXYGEN REMOVED FOR OVH ADD B111666-4 AFT PORTABLE OXYGEN REMOVED FOR OVH IAW MEL
A581/WO 577299 27 Day
ADD B111666-4 AFT PORTABLE OXYGEN REMOVED FOR OVH IAW MEL 35-30-01A.CAT D.DEADLINE 09-09-2021 OXYGEN MASK AND POCKET
(Iss.Date: 12.May.2021 ) 35-30-01A.CAT D.DEADLINE 09-09-2021 OXYGEN MASK AND POCKET RE-CERTIFY AND SEND TO STORE (BAV075AC)
(Iss.Station: HAN) RE-CERTIFY AND SEND TO STORE (BAV075AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 5 / 38
ADD B DEFECT LIST 16:36 NHATHC

289-601-248 PORTABLE OXYGEN-MASK ( Noted by at on )


1.00 15.00
(Request date: 13.May.2021 by KHUONGTT)

A2567082700000 POCKET ASSY ( Noted by at on )


1.00 2.00
(Request date: 13.May.2021 by KHUONGTT)

5500-A1A-BF23A PORTABLE OXYGEN CYLINDER ASSEMBLY R0387021 30.Jul.2021 ( Noted by at on )


1.00
(Request date: 13.May.2021 by KHUONGTT) (08.Jul.2021) (Ordered by NHATHC)
1.00 0.00
R0359221 31.May.2021
1.00
(12.May.2021) (Ordered by HAIPD)

23.Sep.2021 MEL 35-30-03A , CAT D B111321-02 BOX OF AFT SMOKE HOOD CRACKED ADD RAISED "AFT PBE BROKEN AND REMOVED" REF MEL 35-30-03A, CAT
A581/WO 580162 41 Day
D, DEADLINE 23 SEP 2021
(Iss.Date: 26.May.2021 )
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E28180-20-0001 PROTECT. BREATHING EQPT (PBE) P0223221 22.Sep.2021 ( Noted by KHUONGNM at 8:16 on 22.Jul.2021 )
1.00 0.00 10.00 KHUONGNM: LT: 1-2D; chưa thanh toán trả trước (22/7)
(Request date: 26.May.2021 by DIEPTQ) (07.Jun.2021) (Ordered by KHUONGNM)

23.Sep.2021 MEL 25-20-01A , CAT D B111321-03 TRAY TABLE SEAT 8D CAN`T BE STOWED ADD RAISED "SEAT 8D NOT USE BECAUSE TRAY TABLE INOP" REF MEL
A581/WO 580160 41 Day
25-20-01A, CAT D, DEADLINE 23 SEP 2021
(Iss.Date: 26.May.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

854745-410K FOODTRAY LATCH P0233521 23.Sep.2021 ( Noted by TRANGNH at 16:14 on 09.Aug.2021 )


1.00 0.00 1.00 đã đặt hàng P0233521 FL Technics (hồ sơ trả trước)
(Request date: 29.May.2021 by HAIPD) (09.Jul.2021) (Ordered by TRANGNH)

19.Oct.2021 MEL 33-30-01A , CAT D B081910-03: AFT & FWD CARGO AND SERVICE COMPARTMENT LIGHTING B081910-03: AFT & FWD CARGO AND SERVICE COMPARTMENT LIGHTING
A581/WO 585726 67 Day
SYS U/S SYS U/S; MEL 33-30-01A CAT D EXP 19/10/21
(Iss.Date: 21.Jun.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

DIN84AM4X18-4-8 SCREW P0245421 27.Sep.2021 ( Noted by HAIPD at 19:18 on 22.Jun.2021 )


2.00 0.00 2.00
(Request date: 22.Jun.2021 by HAIPD) (13.Aug.2021) (Ordered by TRUNGPB)

MS25235-3011 BULB P0245421 27.Sep.2021 ( Noted by HAIPD at 19:18 on 22.Jun.2021 )


2.00 0.00 5.00
(Request date: 22.Jun.2021 by HAIPD) (13.Aug.2021) (Ordered by TRUNGPB)

05.Nov.2021 MEL 35-30-01A , CAT D ADD B0124071-05: REMOVE 01 PORTABLE OXYGEN CYLINDER AT AFT ADD B0124071-05: REMOVE 01 PORTABLE OXYGEN CYLINDER AT AFT
A581/WO 600486 84 Day
CABIN CABIN IS RAISED REF MEL 35-30-01A CAT D DEADLINE : 05/11/2021 RAISED
(Iss.Date: 08.Jul.2021 )
BY 049AC
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5500-A1A-BF23A PORTABLE OXYGEN CYLINDER ASSEMBLY R0387021 30.Jul.2021 ( Noted by DATMD at 14:56 on 18.Jul.2021 )
1.00
(Request date: 18.Jul.2021 by DATMD) (08.Jul.2021) (Ordered by NHATHC)
1.00 0.00
R0359221 31.May.2021
(12.May.2021)
1.00
(Ordered by HAIPD)

24.Dec.2021 ADD B0081935-10: PAINT PEEL OFF NEAR DOOR 4R ADD B0081935-10: PAINT PEEL OFF NEAR DOOR 4R. REF SRM 53-11-00
A581/WO 586803 133 Day
REV01MAY2021. DEADLINE ASAP
(Iss.Date: 27.Jun.2021 )
(Iss.Station: HAN)

29.Apr.2022 B39755-08 FOUND INLET CONE ENG #2 MISSING POLYURETHANE REF AMM 72-38-11-200-010-B ADD B39755-08 IS RAISED, DEADLINE 6000H,
A581/WO 461621 2830:46 FH
COATING LESS THAN 50% 4500FC OR 20 MONTHS
(Iss.Date: 14.Oct.2020 )
(Iss.Station: DAD)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 6 / 38
ADD B DEFECT LIST 16:36 NHATHC

5A1733 INLET CONE R0271021 31.Mar.2021 ( Noted by at on )


1.00 0.00 1.00
(Request date: 20.Jan.2021 by DUNGLV) (26.Jan.2021) (Ordered by DUNGLV)

06.Jun.2022 B39755-08 FOUND INLET CONE ENG #2 MISSING POLYURETHANE REF AMM 72-38-11-200-010-B ADD B39755-08 IS RAISED, DEADLINE 6000H,
A581/WO 461621 297 Day
COATING LESS THAN 50% 4500FC OR 20 MONTHS
(Iss.Date: 14.Oct.2020 )
(Iss.Station: DAD)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A1733 INLET CONE R0271021 31.Mar.2021 ( Noted by at on )


1.00 0.00 1.00
(Request date: 20.Jan.2021 by DUNGLV) (26.Jan.2021) (Ordered by DUNGLV)

28.Feb.2023 B39755-08 FOUND INLET CONE ENG #2 MISSING POLYURETHANE REF AMM 72-38-11-200-010-B ADD B39755-08 IS RAISED, DEADLINE 6000H,
A581/WO 461621 3396 FC
COATING LESS THAN 50% 4500FC OR 20 MONTHS
(Iss.Date: 14.Oct.2020 )
(Iss.Station: DAD)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A1733 INLET CONE R0271021 31.Mar.2021 ( Noted by at on )


1.00 0.00 1.00
(Request date: 20.Jan.2021 by DUNGLV) (26.Jan.2021) (Ordered by DUNGLV)

16.May.2023 ADD B0111684-04:"LEADBONDING AT RH MOVEABLE AFT FAIRING ADD B0111684-04:"LEADBONDING AT RH MOVEABLE AFT FAIRING
A581/WO 578192 641 Day
DAMAGED" DAMAGED" IS RAISED,REF AMM: 24-92-00-210-024A.DEADLINE: 16/05/2023
(Iss.Date: 16.May.2021 ) "LEAD BONDING AT RH MOVEABLE AFT FAIRING DAMAGED" OR 51260.48 FH OR 27889 FC WHICH EVER COME FIST
(Iss.Station: HAN)

WorkOrder Remarks

Updated by HAIPD at 16.May.2021 : SPARE ORDER REF WO 566191


15.Jun.2023 ADD B0111684-04:"LEADBONDING AT RH MOVEABLE AFT FAIRING ADD B0111684-04:"LEADBONDING AT RH MOVEABLE AFT FAIRING
A581/WO 578192 7296:0 FH
DAMAGED" DAMAGED" IS RAISED,REF AMM: 24-92-00-210-024A.DEADLINE: 16/05/2023
(Iss.Date: 16.May.2021 ) "LEAD BONDING AT RH MOVEABLE AFT FAIRING DAMAGED" OR 51260.48 FH OR 27889 FC WHICH EVER COME FIST
(Iss.Station: HAN)

WorkOrder Remarks

Updated by HAIPD at 16.May.2021 : SPARE ORDER REF WO 566191


24.Oct.2023 ADD B0111684-04:"LEADBONDING AT RH MOVEABLE AFT FAIRING ADD B0111684-04:"LEADBONDING AT RH MOVEABLE AFT FAIRING
A581/WO 578192 4828 FC
DAMAGED" DAMAGED" IS RAISED,REF AMM: 24-92-00-210-024A.DEADLINE: 16/05/2023
(Iss.Date: 16.May.2021 ) "LEAD BONDING AT RH MOVEABLE AFT FAIRING DAMAGED" OR 51260.48 FH OR 27889 FC WHICH EVER COME FIST
(Iss.Station: HAN)

WorkOrder Remarks

Updated by HAIPD at 16.May.2021 : SPARE ORDER REF WO 566191

VN-A582 Open Defects = 13


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

14.Aug.2021 MEL 32-07-07A , CAT D ADD B37729-03 "TIRE PRESSURE MW#1 SHOW XX DUE TO REMOVE ADD B37729-03 "TIRE PRESSURE MW#1 SHOW XX DUE TO REMOVE
A582/WO 563349 1 Day
TRANDUCER" TRANDUCER" IS RAISED REF MEL 32-07-07A CAT D DEADLINE 14/08/2021
(Iss.Date: 16.Apr.2021 )
REV 15/03/2021
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

4611375003 WASHER ( Noted by CHINHND at 6:26 on 19.Jul.2021 )


4.00 450.00
(Request date: 19.Jul.2021 by CHINHND)

MS24665-134 PIN-COTTER ( Noted by CHINHND at 6:26 on 19.Jul.2021 )


1.00 3'648.00
(Request date: 19.Jul.2021 by CHINHND)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 7 / 38
ADD B DEFECT LIST 16:36 NHATHC

MS17825-4 NUT P0217921 14.Jun.2021 ( Noted by CHINHND at 6:26 on 19.Jul.2021 )


1.00 154.00 1'000.00
(Request date: 19.Jul.2021 by CHINHND) (24.May.2021) (Ordered by QUYNHNTD)

4133801030 PRESSURE TRANSDUCER ( Noted by CHINHND at 6:26 on 19.Jul.2021 )


1.00 5.00
(Request date: 19.Jul.2021 by CHINHND)

16.Aug.2021 MEL 32-07-07A , CAT D B0037739-03: MW#3 TIRE PRESSURE INDICATION ON WHEEL SD PAGE INOP B0037739-03: MW#3 TIRE PRESSURE INDICATION ON WHEEL SD PAGE
A582/WO 563644 3 Day
INOP; MEL 32-07-07A; CAT D EXP 16/08/21
(Iss.Date: 18.Apr.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

MS24665-134 PIN-COTTER ( Noted by CHINHND at 6:27 on 19.Jul.2021 )


1.00 3'647.00
(Request date: 19.Jul.2021 by CHINHND)

4133801030 PRESSURE TRANSDUCER ( Noted by CHINHND at 6:27 on 19.Jul.2021 )


1.00 5.00
(Request date: 19.Jul.2021 by CHINHND)

4611375003 WASHER ( Noted by CHINHND at 6:27 on 19.Jul.2021 )


4.00 446.00
(Request date: 19.Jul.2021 by CHINHND)

MS17825-4 NUT P0217921 14.Jun.2021 ( Noted by CHINHND at 6:27 on 19.Jul.2021 )


1.00 154.00 1'000.00
(Request date: 19.Jul.2021 by CHINHND) (24.May.2021) (Ordered by QUYNHNTD)

17.Aug.2021 MEL 32-09-02A , CAT D ADD B037745-4 MAIN WHEEL#2 PRESS TRANSDUCER REMOVED ADD B037745-4 MAIN WHEEL#2 PRESS TRANSDUCER REMOVED MEL
A582/WO 564055 4 Day
ADD B037745-4 MAIN WHEEL#2 PRESS TRANSDUCER REMOVED MEL 32-09-02A.CAT D.DEADLINE 17-08-2021 (BAV041AC)
(Iss.Date: 19.Apr.2021 ) 32-09-02A.CAT D.DEADLINE 17-08-2021 (BAV041AC)
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

MS17825-4 NUT P0217921 14.Jun.2021 ( Noted by CHINHND at 6:28 on 19.Jul.2021 )


1.00 154.00 1'000.00
(Request date: 19.Jul.2021 by CHINHND) (24.May.2021) (Ordered by QUYNHNTD)

MS24665-134 PIN-COTTER ( Noted by CHINHND at 6:28 on 19.Jul.2021 )


1.00 3'646.00
(Request date: 19.Jul.2021 by CHINHND)

4133801030 PRESSURE TRANSDUCER ( Noted by CHINHND at 6:28 on 19.Jul.2021 )


1.00 5.00
(Request date: 19.Jul.2021 by CHINHND)

4611375003 WASHER ( Noted by CHINHND at 6:28 on 19.Jul.2021 )


4.00 442.00
(Request date: 19.Jul.2021 by CHINHND)

20.Aug.2021 CDL 2710 B0053308-12: REF NRC#5: SLAT#2 RH INBOARD END SEAL U/S ADD RAISED REF CDL 27-10
A582/WO 472224 7 Day
(Iss.Date: 11.Dec.2020 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D5746029520500 SEAL (RH) P0220921 01.Jun.2021 ( Noted by HOANNV at 9:27 on 31.May.2021 )


1.00 0.00 1.00 REQ 27/05
(Request date: 16.Dec.2020 by NHATHC) (01.Jun.2021) (Ordered by TRONGND)

27.Aug.2021 ADD B0030491-04: DELAMINATION ARROUND EDGE OF SLINDING ADD B0030491-04: DELAMINATION ARROUND EDGE OF SLINDING
A582/WO 460207 14 Day
WINDOW WINDOW CAPT SIDE WITH MAX WIDTH=11MM REF AMM
(Iss.Date: 05.Oct.2020 ) ADD B0030491-04: DELAMINATION ARROUND EDGE OF SLINDING 56-12-11-200-001A DEADLINE : ASAP RAISED BY 016AC THE DAMAGE WAS
(Iss.Station: HAN) WINDOW UPDATE TO DENT BUCKER CHART

29.Oct.2021 ADD B97137-02:"RUBBING STRIP OF COVER PLATE DOOR 2L DAMAGED" ADD B97137-02:"RUBBING STRIP OF COVER PLATE DOOR 2L DAMAGED" IS
A582/WO 575861 478 FC
"RUBBING STRIP OF COVER PLATE DOOR 2L DAMAGED" RAISED,REF AMM:52-13-18-300-002A .DEADLINE: 25640FC, INSPECTION
(Iss.Date: 08.May.2021 )
EVERY 50FC FC ON TECHLOG IS 25090 FC ON AMOS IS 25091
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 8 / 38
ADD B DEFECT LIST 16:36 NHATHC

RUBBER & PLASTIC BONDING


3M-SCOTCH-WELD 1300L P0189821 31.May.2021 ( Noted by at on )
1.00 1.00 3.00
(Request date: 10.May.2021 by KHUONGTT) (23.Mar.2021) (Ordered by QUYNHNTD)

ASNA35807015 STRIP (RAW MATERIAL) ( Noted by at on )


1.00 0.00
(Request date: 10.May.2021 by KHUONGTT)

PR1782B-1/2 LOW WEIGHT FUELTANK SEALANT ( Noted by at on )


1.00 0.00
(Request date: 10.May.2021 by KHUONGTT)

15.Nov.2021 MEL 25-50-01A , CAT D "SURFACE OF STRIP BALL 132QF AT FWD CARGO DAMAGED (WORN)" ADD B0111051-59:"SURFACE OF STRIP BALL 132QF AT FWD CARGO
A582/WO 602262 94 Day
DAMAGED (WORN)" IS RAISED,REF MEL: 25-50-01A.CAT D.DEADLINE
(Iss.Date: 18.Jul.2021 )
15/11/2021
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D2557210600600 STRIP BALL P0242721 14.Nov.2021 ( Noted by DUNGLV at 4:14 on 18.Jul.2021 )


1.00 0.00 1.00
(Request date: 18.Jul.2021 by DUNGLV) (02.Aug.2021) (Ordered by KHUONGNM)

12.Dec.2022 B0053309-14: REF NRC#6 WP-BAV-A582-0010 RPLD BONDING LEAD REQ AT ADD RAISED REF AMM 24-92-00-220-062. EXP DATE: 12 DEC 2022 OR 51019
A582/WO 472223 486 Day
FAIRING ASSY MOVABLE AFT ENG 01 FH OR 29351 FC OCCURS FIRST
(Iss.Date: 12.Dec.2020 )
(Iss.Station: SGN)

23.Dec.2022 ADD B59226-2:"LEAD BONDING AT RH NLG DOOR DAMAGE" ADD B59226-2:"LEAD BONDING AT RH NLG DOOR DAMAGE" IS RAISED,REF
A582/WO 513543 497 Day
"LEAD BONDING AT RH NLG DOOR DAMAGE" AMM:24-92-00-210-024-A.DEADLINE: 24MONTH OR 7500FH OR 5000FC WITCH
(Iss.Date: 23.Dec.2020 )
EVER COME FIRST. 23/12/2022 OR 51084FH OR 29398FC
(Iss.Station: HAN)

29.Mar.2023 B0053309-14: REF NRC#6 WP-BAV-A582-0010 RPLD BONDING LEAD REQ AT ADD RAISED REF AMM 24-92-00-220-062. EXP DATE: 12 DEC 2022 OR 51019
A582/WO 472223 6453:44 FH
FAIRING ASSY MOVABLE AFT ENG 01 FH OR 29351 FC OCCURS FIRST
(Iss.Date: 12.Dec.2020 )
(Iss.Station: SGN)

04.Apr.2023 ADD B59226-2:"LEAD BONDING AT RH NLG DOOR DAMAGE" ADD B59226-2:"LEAD BONDING AT RH NLG DOOR DAMAGE" IS RAISED,REF
A582/WO 513543 6519:24 FH
"LEAD BONDING AT RH NLG DOOR DAMAGE" AMM:24-92-00-210-024-A.DEADLINE: 24MONTH OR 7500FH OR 5000FC WITCH
(Iss.Date: 23.Dec.2020 )
EVER COME FIRST. 23/12/2022 OR 51084FH OR 29398FC
(Iss.Station: HAN)

10.Jul.2023 B0053309-14: REF NRC#6 WP-BAV-A582-0010 RPLD BONDING LEAD REQ AT ADD RAISED REF AMM 24-92-00-220-062. EXP DATE: 12 DEC 2022 OR 51019
A582/WO 472223 4188 FC
FAIRING ASSY MOVABLE AFT ENG 01 FH OR 29351 FC OCCURS FIRST
(Iss.Date: 12.Dec.2020 )
(Iss.Station: SGN)

18.Jul.2023 ADD B59226-2:"LEAD BONDING AT RH NLG DOOR DAMAGE" ADD B59226-2:"LEAD BONDING AT RH NLG DOOR DAMAGE" IS RAISED,REF
A582/WO 513543 4236 FC
"LEAD BONDING AT RH NLG DOOR DAMAGE" AMM:24-92-00-210-024-A.DEADLINE: 24MONTH OR 7500FH OR 5000FC WITCH
(Iss.Date: 23.Dec.2020 )
EVER COME FIRST. 23/12/2022 OR 51084FH OR 29398FC
(Iss.Station: HAN)

VN-A583 Open Defects = 23


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

05.Aug.2021 FWD FAK EXPIRE ON 01AUG2021. SET CODE B FOR MONITOR DUE DATE 01AUG2021
A583/WO 605561 -8 Day
(Iss.Date: 28.Jul.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

AESC-FAK-002 FAK P0154320 30.Dec.2020 ( Noted by DIEPTQ at 11:35 on 28.Jul.2021 )


1.00 2.00 100.00
(Request date: 28.Jul.2021 by DIEPTQ) (30.Dec.2020) (Ordered by TUANLA)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 9 / 38
ADD B DEFECT LIST 16:36 NHATHC

07.Aug.2021 ADD B0022799-05: INLET CONE OF ENG 2 MISSING POLYURETHANE LESS ADD B0022799-05: INLET CONE OF ENG 2 MISSING POLYURETHANE LESS
A583/WO 271556 -6 Day
THAN 50% THAN 50%. REF AMM 72-38-11-200-010B. REPAIR INTERVAL 6000FH, 4500FC,
(Iss.Date: 07.Jan.2020 )
20 MONTHS
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A1733 INLET CONE R0271021 31.Mar.2021 ( Noted by TRANGNH at 9:43 on 13.Aug.2021 )


1.00 0.00 1.00 EDD: 20 August HAN
(Request date: 20.Jan.2021 by DUNGLV) (26.Jan.2021) (Ordered by DUNGLV)

15.Aug.2021 ADD B062647-05: RUBBER SEAL AT 6H AND 9H POS OF ENG 2 MINOR ADD B062647-05 IS RAISED FOR RUBBER SEAL AT 6H AND 9H POS OF ENG 2
A583/WO 539414 2 Day
DAMAGED (BAV059AC) MINOR DAMAGED, AMM 72-32-87-200-010-B, DEADLINE NEXT ENG SHOP
(Iss.Date: 16.Feb.2021 )
VISIT
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A0828 RUBBER SEAL PANEL P0175821 02.Mar.2021 ( Noted by TRANGNH at 16:17 on 09.Aug.2021 )
(Request date: 18.Feb.2021 by NHATHC) (25.Feb.2021)
1.00 đã đặt hàng P0203821, đang đợi thanh toán trả trước
(Ordered by QUYNHNTD)
1.00 0.00
P0203821 15.Aug.2021
2.00
(19.Apr.2021) (Ordered by TRANGNH)

5A0831 SEAL RUBBER PANEL P0199621 15.Aug.2021 ( Noted by at on )


1.00 1.00 1.00
(Request date: 18.Feb.2021 by NHATHC) (13.Apr.2021) (Ordered by TRANGNH)

19.Aug.2021 MEL 52-30-07A , CAT D ADD B0012386-15: AFT CARGO FULLY OPEN LIGHT INOP ADD B0012386-15 RAISED FOR AFT CARGO FULLY OPEN LIGHT INOP
A583/WO 564634 6 Day
(Iss.Date: 21.Apr.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D9259024320000 SEAL P0221721 26.Aug.2021 ( Noted by at on )


1.00
(Request date: 03.May.2021 by QUANGTN) (02.Jun.2021) (Ordered by TRANGNH)

2.00 0.00 P0124020 10.Oct.2020


3.00
(29.Sep.2020) (Ordered by HOANNV)

P0219621 01.Jun.2021
(27.May.2021)
20.00
(Ordered by QUYNHNTD)

E0070B1-07 LIGHT P0204021 09.Aug.2021 ( Noted by at on )


(Request date: 03.May.2021 by QUANGTN) (19.Apr.2021)
1.00
(Ordered by KHUONGNM)

P0198321 08.Apr.2021
5.00
(08.Apr.2021) (Ordered by TRONGND)
1.00 1.00
P0212221 30.May.2021
10.00
(10.May.2021) (Ordered by QUYNHNTD)

P0219621 01.Jun.2021
20.00
(27.May.2021) (Ordered by QUYNHNTD)

A9239559320400 SEALING P0212121 30.May.2021 ( Noted by at on )


2.00
(Request date: 03.May.2021 by QUANGTN) (10.May.2021) (Ordered by QUYNHNTD)
1.00 30.00
P0124020 10.Oct.2020
(29.Sep.2020)
3.00
(Ordered by HOANNV)

06AAA1 POLYSULFIDE SEALANT-GENERAL PURPOSE P0243321 22.Oct.2022 ( Noted by at on )


1.00 0.00 10.00
(Request date: 03.May.2021 by QUANGTN) (02.Aug.2021) (Ordered by KHUONGNM)

06AAC1 POLYSULFIDE SEALANT ( Noted by at on )


1.00 0.00
(Request date: 03.May.2021 by QUANGTN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 10 / 38
ADD B DEFECT LIST 16:36 NHATHC

22.Aug.2021 CDL 54-06 B0060905-28: SEAL OF PANEL 471AR DAMAGED B0060905-28: SEAL OF PANEL 471AR DAMAGED; CDL 54-06 EXP: ASAP
A583/WO 540343 9 Day
(Iss.Date: 21.Feb.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D0003014100000 SEAL P0234421 05.Oct.2021 ( Noted by TRANGNH at 16:15 on 09.Aug.2021 )


1.00 0.00 2.00 đang đợi duyệt đơn hàng
(Request date: 25.Feb.2021 by DUNGLV) (13.Jul.2021) (Ordered by TRANGNH)

28.Aug.2021 ADD B0054291-05: WEATHER SEAL SEAL AT SLIDING WINDOW DAMAGE ADD B0054291-05: WEATHER SEAL SEAL AT SLIDING WINDOW DAMAGE IS
A583/WO 528695 15 Day
ADD B0054291-05: WEATHER SEAL SEAL AT SLIDING WINDOW DAMAGE RAISED REF AMM 56-10-00-200-605A DEADLINE : ASAP RAISED BY 016AC
(Iss.Date: 01.Feb.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

PR1784B1-2 SEALANT P0237621 22.Jul.2021 ( Noted by at on )


(Request date: 16.Feb.2021 by DUNGLV) (22.Jul.2021)
3.00
(Ordered by TRONGND)

P0172821 28.Feb.2021
15.00
(18.Feb.2021) (Ordered by TRONGND)
25.00 10.00
P0172521
(17.Feb.2021)
20.00
(Ordered by TRONGND)

P0172421 28.Feb.2021
(17.Feb.2021)
25.00
(Ordered by TRONGND)

98D56103003000 SPATULA-WEATHER SEAL ( Noted by QUYNHNTD at 3:3 on 19.Mar.2021 )


1.00 0.00
(Request date: 16.Feb.2021 by TRUONGLA)

05.Sep.2021 MEL 32-07-07A , CAT D ADD B97333-09:"RH NOSE WHEEL TPIS SHOW XX " ADD B97333-09:"RH NOSE WHEEL TPIS SHOW XX " IS RAISED,REF MEL:
A583/WO 575851 23 Day
"RH NOSE WHEEL TPIS SHOW XX " DUE TO TPIS REMOVED FROM WHEEL 32-07-07A.CAT D.DEADLINE: 05/09/21
(Iss.Date: 08.May.2021 ) NO TPIS HOLDER
(Iss.Station: SGN)

09.Sep.2021 ADD B0097338-24:"REF NRC#43 AND ADD B0097338-22" ADD B0097338-24:"PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE
A583/WO 578927 27 Day
PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE REAR ENGINE#2 REAR ENGINE#2 CRACK NEED EXAMINE CRACK AGAIN" IS RAISED,REF
(Iss.Date: 12.May.2021 ) CRACK AMM: 72-32-87-200-010B PARA 4B.2C.DEADLINE: FH64067, FC 19059 OR
(Iss.Station: SGN) 12SEP2021.

23.Sep.2021 MEL 25-20-02A , CAT D B124626-03 CHK SEAT BACK REST OF SEAT 4C INOP ADD RAISED REF MEL 25-20-02A, CAT D, DEADLINE 23 SEP 2021 SEAT
A583/WO 580409 41 Day
SECURED IN UPRIGHT POS NOTE: FOOTREST SEAT 4C CAN NOT STOW
(Iss.Date: 26.May.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

837−00−210−02 .ACTUATOR LEGREST ( Noted by at on )


1.00 1.00
(Request date: 27.May.2021 by TOANVV)

30.Sep.2021 B0124605-56 CHANGE BLUE HYD FLUID SYSTEM ADD RAISED REF AMM 12-32-29-281-001-A. DEADLINE 19059 FC, 45916H24`
A583/WO 579424 551:19 FH
(Iss.Date: 22.May.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

HYJETV HYJET V P0188121 15.Apr.2021 ( Noted by DUNGLV at 7:49 on 13.Jul.2021 )


60.00 429.00 480.00
(Request date: 13.Jul.2021 by DUNGLV) (19.Mar.2021) (Ordered by TRUNGPB)

14.Oct.2021 ADD B0097338-24:"REF NRC#43 AND ADD B0097338-22" ADD B0097338-24:"PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE
A583/WO 578927 701:19 FH
PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE REAR ENGINE#2 REAR ENGINE#2 CRACK NEED EXAMINE CRACK AGAIN" IS RAISED,REF
(Iss.Date: 12.May.2021 ) CRACK AMM: 72-32-87-200-010B PARA 4B.2C.DEADLINE: FH64067, FC 19059 OR
(Iss.Station: SGN) 12SEP2021.

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 11 / 38
ADD B DEFECT LIST 16:36 NHATHC

08.Nov.2021 ADD B0097338-22:"REF NRC#43 WP BAV-A583-0008" ADD B0097338-22:"PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE
A583/WO 578926 87 Day
PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE REAR ENGINE#2 REAR ENGINE#2 CRACK" IS RAISED, REF AMM: 72-32-87-200-010B. PARA
(Iss.Date: 12.May.2021 ) CRACK 4B.2C.DEADLINE : NEXT ENG SHOP VISIT
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A0832 RUBBER SEAL ( Noted by at on )


1.00 0.00
(Request date: 19.May.2021 by DUONGND)

5A0829 SEAL ( Noted by at on )


1.00 0.00
(Request date: 19.May.2021 by DUONGND)

5A0828 RUBBER SEAL PANEL P0175821 02.Mar.2021 ( Noted by QUYNHNTD at 1:57 on 07.Jun.2021 )
(Request date: 19.May.2021 by DUONGND) (25.Feb.2021)
1.00 chờ thanh toán_leadtime: 2-3days/US
(Ordered by QUYNHNTD)
1.00 0.00
P0203821 15.Aug.2021
(19.Apr.2021)
2.00
(Ordered by TRANGNH)

09.Nov.2021 ADD B0097341-31: OUTSIDE LH FAN COWL DOOR OF ENG 2 PAINT PEEL OFF ADD B0097341-31: OUTSIDE LH FAN COWL DOOR OF ENG 2 PAINT PEEL
A583/WO 577940 88 Day
OFFREF SRM 51-11-00 PARA2.B4. NO DAMAGE FINDING. APPLY
(Iss.Date: 12.May.2021 ) TEMPORARY REPROTECTING ACCORDING AMM 51-77-12-911-001.
(Iss.Station: HAN) PERMANENT REPAIR ON FIRST CONVENIENT
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

77827G20314 TOP COAT(LIGHT BLUE) P0189121 19.Mar.2021 ( Noted by at on )


1.00 0.00 5.00
(Request date: 19.May.2021 by DUONGND) (22.Mar.2021) (Ordered by KHUONGNM)

09.Nov.2021 ADD B0097340-30: SEAL ON PANEL 471AL DAMAGED/ PARTIALY MISSING ADD B0097340-30: SEAL ON PANEL 471AL DAMAGED/ PARTIALY MISSING
A583/WO 577939 88 Day
REF CDL 54-06. DEADLINE ASAP. APPLIED HI SPEED TAPE IAW AMM
(Iss.Date: 14.May.2021 )
54-57-00-040-052B CHECK HI SPEED TAPE EACH TERM CHECK.
(Iss.Station: HAN)

WorkOrder Remarks

Updated by DUONGND at 15.May.2021 : SPARE ORDER REF WO 576`088


Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D0003014100100 SEAL P0242221 08.Nov.2021 ( Noted by TRANGNH at 16:18 on 09.Aug.2021 )


1.00 đang đợi duyệt đơn hàng
(Request date: 15.May.2021 by DUONGND) (30.Jul.2021) (Ordered by TRANGNH)
1.00 0.00
P0226021 27.Sep.2021
1.00
(16.Jun.2021) (Ordered by TRUNGPB)

07.Dec.2021 ADD B0097338-24:"REF NRC#43 AND ADD B0097338-22" ADD B0097338-24:"PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE
A583/WO 578927 713 FC
PANEL RUBBER SEAL NO.5, NO.6, NO.9 OF FAN CASE REAR ENGINE#2 REAR ENGINE#2 CRACK NEED EXAMINE CRACK AGAIN" IS RAISED,REF
(Iss.Date: 12.May.2021 ) CRACK AMM: 72-32-87-200-010B PARA 4B.2C.DEADLINE: FH64067, FC 19059 OR
(Iss.Station: SGN) 12SEP2021.

07.Dec.2021 B0124605-56 CHANGE BLUE HYD FLUID SYSTEM ADD RAISED REF AMM 12-32-29-281-001-A. DEADLINE 19059 FC, 45916H24`
A583/WO 579424 713 FC
(Iss.Date: 22.May.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

HYJETV HYJET V P0188121 15.Apr.2021 ( Noted by DUNGLV at 7:49 on 13.Jul.2021 )


60.00 429.00 480.00
(Request date: 13.Jul.2021 by DUNGLV) (19.Mar.2021) (Ordered by TRUNGPB)

28.Dec.2021 ADD B0080536-82: ENG 2 REAR FARING MISSING 01 SCREW AT 1 OCLOCK ADD B0080536-82: ENG 2 REAR FARING MISSING 01 SCREW AT 1 OCLOCK
A583/WO 594375 137 Day
REF 72-32-86-300-010A.. TEMPORARY REPAIR REF AMM 72-32-86-200-010A.
(Iss.Date: 01.Jul.2021 )
DEALINE NEXT SHOP VISIT
(Iss.Station: HAN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 12 / 38
ADD B DEFECT LIST 16:36 NHATHC

28.Dec.2021 ADD B80535-81 "ENG #1 REAR FAIRING MISSING 01 SCREW AT 6H OCLOCK" ADD B80535-81 "ENG #1 REAR FAIRING MISSING 01 SCREW AT 6H OCLOCK"
A583/WO 594376 137 Day
REF AMM 72-32-86-300-010A (REV 05/2021) TEMPORARY REPAIRED REF
(Iss.Date: 01.Jul.2021 )
AMM 72-32-86-300-010A (REV 05/2021) DEADLINE NEXT SHOP VISIT
(Iss.Station: HAN)

14.Mar.2022 ADD B0045867-10:"LH NOSE LDG DOOR LEADBONDING DAMAGED" ADD B0045867-10:"LH NOSE LDG DOOR LEADBONDING DAMAGED" IS
A583/WO 349640 213 Day
"LH NOSE LDG DOOR LEADBONDING DAMAGED" RAISED REF AMM:24-92-00-210-024A REV 02FEB. DEADLINE: 24 MONTH OR
(Iss.Date: 14.Mar.2020 )
7500 FH OR 5000FC WHICH EVER COME FIRST
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 28.Mar.2020 by DIEPTQ) (24.May.2021) (Ordered by QUYNHNTD)

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 06.Jun.2020 by HAIPD) (24.May.2021) (Ordered by QUYNHNTD)

20.Sep.2022 ADD B0022799-05: INLET CONE OF ENG 2 MISSING POLYURETHANE LESS ADD B0022799-05: INLET CONE OF ENG 2 MISSING POLYURETHANE LESS
A583/WO 271556 4509:37 FH
THAN 50% THAN 50%. REF AMM 72-38-11-200-010B. REPAIR INTERVAL 6000FH, 4500FC,
(Iss.Date: 07.Jan.2020 )
20 MONTHS
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A1733 INLET CONE R0271021 31.Mar.2021 ( Noted by TRANGNH at 9:43 on 13.Aug.2021 )


1.00 0.00 1.00 EDD: 20 August HAN
(Request date: 20.Jan.2021 by DUNGLV) (26.Jan.2021) (Ordered by DUNGLV)

02.Feb.2023 ADD B0022799-05: INLET CONE OF ENG 2 MISSING POLYURETHANE LESS ADD B0022799-05: INLET CONE OF ENG 2 MISSING POLYURETHANE LESS
A583/WO 271556 3308 FC
THAN 50% THAN 50%. REF AMM 72-38-11-200-010B. REPAIR INTERVAL 6000FH, 4500FC,
(Iss.Date: 07.Jan.2020 )
20 MONTHS
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A1733 INLET CONE R0271021 31.Mar.2021 ( Noted by TRANGNH at 9:43 on 13.Aug.2021 )


1.00 0.00 1.00 EDD: 20 August HAN
(Request date: 20.Jan.2021 by DUNGLV) (26.Jan.2021) (Ordered by DUNGLV)

29.Mar.2023 ADD B0045867-10:"LH NOSE LDG DOOR LEADBONDING DAMAGED" ADD B0045867-10:"LH NOSE LDG DOOR LEADBONDING DAMAGED" IS
A583/WO 349640 6451:28 FH
"LH NOSE LDG DOOR LEADBONDING DAMAGED" RAISED REF AMM:24-92-00-210-024A REV 02FEB. DEADLINE: 24 MONTH OR
(Iss.Date: 14.Mar.2020 )
7500 FH OR 5000FC WHICH EVER COME FIRST
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 28.Mar.2020 by DIEPTQ) (24.May.2021) (Ordered by QUYNHNTD)

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 06.Jun.2020 by HAIPD) (24.May.2021) (Ordered by QUYNHNTD)

30.Jun.2023 ADD B0045867-10:"LH NOSE LDG DOOR LEADBONDING DAMAGED" ADD B0045867-10:"LH NOSE LDG DOOR LEADBONDING DAMAGED" IS
A583/WO 349640 4132 FC
"LH NOSE LDG DOOR LEADBONDING DAMAGED" RAISED REF AMM:24-92-00-210-024A REV 02FEB. DEADLINE: 24 MONTH OR
(Iss.Date: 14.Mar.2020 )
7500 FH OR 5000FC WHICH EVER COME FIRST
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 28.Mar.2020 by DIEPTQ) (24.May.2021) (Ordered by QUYNHNTD)

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 06.Jun.2020 by HAIPD) (24.May.2021) (Ordered by QUYNHNTD)

VN-A584 Open Defects = 20


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 13 / 38
ADD B DEFECT LIST 16:36 NHATHC

02.Aug.2021 ADD B0097721-107: BOTH WEATHER SEALS OF WINDSHIELD DAMAGED ADD B0097721-107: BOTH WEATHER SEALS OF WINDSHIELD DAMAGED.
A584/WO 605501 9 FC
REF AMM 56-10-00-200-005A. DEADLINE 22627FC
(Iss.Date: 28.Jul.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

98D56103003000 SPATULA-WEATHER SEAL ( Noted by DUNGLV at 4:46 on 30.Jul.2021 )


1.00 1.00
(Request date: 30.Jul.2021 by DUNGLV)

08BAA9 NON AQUEOUS CLEANER-GENERAL ( Noted by DUNGLV at 4:46 on 30.Jul.2021 )


1.00 84.00
(Request date: 30.Jul.2021 by DUNGLV)

PR1784B1-2 SEALANT P0237621 22.Jul.2021 ( Noted by DUNGLV at 4:46 on 30.Jul.2021 )


(Request date: 30.Jul.2021 by DUNGLV) (22.Jul.2021)
3.00
(Ordered by TRONGND)

P0172821 28.Feb.2021
(18.Feb.2021)
15.00
(Ordered by TRONGND)
4.00 10.00
P0172521
20.00
(17.Feb.2021) (Ordered by TRONGND)

P0172421 28.Feb.2021
(17.Feb.2021)
25.00
(Ordered by TRONGND)

PR186 PROMOTER FOR NON POLYCARBONATE P0237621 09.Aug.2021 ( Noted by TRANGNH at 14:53 on 30.Jul.2021 )
(Request date: 30.Jul.2021 by DUNGLV) (22.Jul.2021)
12.00 chưa có thông tin
(Ordered by TRONGND)

P0172821 28.Feb.2021
(18.Feb.2021)
300.00
(Ordered by TRONGND)
2.00 0.00
P0172521
(17.Feb.2021)
300.00
(Ordered by TRONGND)

P0172421 28.Feb.2021
300.00
(17.Feb.2021) (Ordered by TRONGND)

07.Aug.2021 MEL 30-42-03A , CAT C ADD B0097718-99: RH WINDSHIELD HEATING INOP ADD B0097718-99: RH WINDSHIELD HEATING INOP. MEL 30-42-03A. CAT C.
A584/WO 605462 -6 Day
DEADLINE 07AUG2021. OPS LIMIT: A/C NOT OPERATE ON KNOWN OR
(Iss.Date: 28.Jul.2021 )
FORCAST ICING CONDITION
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

NSA8207-2 O-RING ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )


1.00 70.00
(Request date: 30.Jul.2021 by DUNGLV)

98F56103000000 R I FRONT WINDOW TOOL P0245121 16.Sep.2021 ( Noted by TRANGNH at 9:46 on 13.Aug.2021 )
1.00 0.00 1.00 đang đợi duyệt đơn hàng
(Request date: 30.Jul.2021 by DUNGLV) (12.Aug.2021) (Ordered by HOANNV)

03FAB1 MINERAL OIL BASE GREASE-- VASELINE O ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )
1.00 4.00
(Request date: 30.Jul.2021 by DUNGLV)

NSA8207-3 O RING ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )


1.00 98.00
(Request date: 30.Jul.2021 by DUNGLV)

PR186 PROMOTER FOR NON POLYCARBONATE P0237621 09.Aug.2021 ( Noted by DUNGLV at 7:4 on 30.Jul.2021 )
12.00
(Request date: 30.Jul.2021 by DUNGLV) (22.Jul.2021) (Ordered by TRONGND)

P0172821 28.Feb.2021
300.00
(18.Feb.2021) (Ordered by TRONGND)
2.00 0.00
P0172521
300.00
(17.Feb.2021) (Ordered by TRONGND)

P0172421 28.Feb.2021
(17.Feb.2021)
300.00
(Ordered by TRONGND)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 14 / 38
ADD B DEFECT LIST 16:36 NHATHC

STA320-2-9-3 RH A320 WINDSHIELD ( Noted by TRANGNH at 9:50 on 13.Aug.2021 )


1.00 0.00 hàng đã về, chưa nhập kho
(Request date: 30.Jul.2021 by DUNGLV)

03GBB1 SYNTHETIC OIL BASE GREASE-GENERAL PU ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )


1.00 3.90
(Request date: 30.Jul.2021 by DUNGLV)

PR1828B1-2 SEALANT P0217421 05.Jun.2021 ( Noted by DUNGLV at 7:4 on 30.Jul.2021 )


10.00 PN: PR-2001 class B & PR 184 or 187 Promoter QTY: 10 SEMKIT OR PN: PR 1826 Class
(Request date: 30.Jul.2021 by DUNGLV) (21.May.2021) (Ordered by TRONGND)
10.00 0.00 B & Primer PR 1826 B QTY: 10 SEMKIT OR PN: DAPCO 72 & DAPCO 1-200 Primer
P0219421 09.Jun.2021 QTY:10 SEMKIT
20.00
(26.May.2021) (Ordered by QUYNHNTD)

06LCG9 NON HARDENING JOINTING PUTTY-MEDIUM ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )


1.00 12.00
(Request date: 30.Jul.2021 by DUNGLV)

98A53003500000 REMOVAL TOOL OF PHILLIPS TORQUE P0176521 26.Feb.2021 ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )
1.00 0.00 1.00
(Request date: 30.Jul.2021 by DUNGLV) (26.Feb.2021) (Ordered by TRONGND)

08BAA9 NON AQUEOUS CLEANER-GENERAL ( Noted by DUNGLV at 4:14 on 30.Jul.2021 )


1.00 84.00
(Request date: 30.Jul.2021 by DUNGLV)

06AEB2 POLYSULFIDE SEALANT-LOW ADHESION FIL ( Noted by TUANNT at 4:51 on 30.Jul.2021 )


2.00 1.00
(Request date: 30.Jul.2021 by TUANNT)

11.Aug.2021 MEL 30-31-02C , CAT C ADD B96244-25: PITOT #3 HEATING INOP ADD B96244-25: PITOT #3 HEATING INOP. MEL 30-31-02C. CAT C. DEADLINE
A584/WO 606255 -2 Day
11AUG2021
(Iss.Date: 01.Aug.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

A3411400020200 SEAL ( Noted by CHINHND at 2:28 on 02.Aug.2021 )


1.00 5.00
(Request date: 02.Aug.2021 by CHINHND)

0851HL PITOT TUBE PR0087821 30.Jun.2021 ( Noted by TRANGNH at 9:55 on 13.Aug.2021 )


(Request date: 02.Aug.2021 by CHINHND) (30.Jun.2021)
2.00 đang đợi thông tin ship
(Ordered by TRONGND)
1.00 0.00
PR0090321 11.Aug.2021
1.00
(11.Aug.2021) (Ordered by TRONGND)

12.Aug.2021 ADD B096231-18 : PAINT PEEL OFF AT LOWER FUSELAGE UNDER LH THS ADD B096231-18 : PAINT PEEL OFF AT LOWER FUSELAGE UNDER LH THS
A584/WO 586182 -1 Day
ADD B096231-18 : PAINT PEEL OFF AT LOWER FUSELAGE UNDER LH THS RAISED IAW SRM 51-11-00 DEADLINE NEXT OPPORTUNITY (BAV069AC)
(Iss.Date: 22.Jun.2021 ) RAISED IAW SRM 51-11-00 DEADLINE NEXT OPPORTUNITY (BAV069AC)
(Iss.Station: SGN)

26.Sep.2021 MEL 31-00-03A , CAT D ADD B124665-02 "DAR ON MAINTENANCE STATUS" ADD B124665-02 "DAR ON MAINTENANCE STATUS" IS RAISED REF MEL
A584/WO 580728 44 Day
31-00-03A. REV 15/03/2021 CAT D, DEADLINE 26/09/2021
(Iss.Date: 29.May.2021 )
(Iss.Station: HAN)

27.Sep.2021 ENG#1 LH FANCOWL DOOR OUTER SKIN DAMAGE ADD B0096241-16 ENG#1 LH FANCOWL DOOR OUTER SKIN DAMAGE ADD B0096241-16
A584/WO 599993 45 Day
RAISED IAW SRM 51-11-00 PARA 2.B.4 REV 01 MAY 21 DUE AT FIRST RAISED IAW SRM 51-11-00 PARA 2.B.4 REV 01 MAY 21 DUE AT FIRST
CONVENIENT OPPOTUNITY SPEED TAPE APPLIED FOR TEMP CONVENIENT OPPOTUNITY SPEED TAPE APPLIED FOR TEMP
(Iss.Date: 29.Jun.2021 ) PROTECTION IAW SRM 51-77-12-911-001 (REV 01 MAY 21) RE-INSPECT PROTECTION IAW SRM 51-77-12-911-001 (REV 01 MAY 21) RE-INSPECT
(Iss.Station: SGN) HI-SPEED TAPE EVERY WEEKLY CHECK HI-SPEED TAPE EVERY WEEKLY CHECK
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

513X384/910X456 PRIMER YELLOW ( Noted by THUTV2 at 9:4 on 07.Jul.2021 )


1.00 1.00
(Request date: 07.Jul.2021 by THUTV2)

020X364 THINNER 020X364 ( Noted by THUTV2 at 9:4 on 07.Jul.2021 )


1.00 0.00
(Request date: 07.Jul.2021 by THUTV2)

77827G20314 TOP COAT(LIGHT BLUE) P0189121 19.Mar.2021 ( Noted by THUTV2 at 9:4 on 07.Jul.2021 )
1.00 0.00 5.00
(Request date: 07.Jul.2021 by THUTV2) (22.Mar.2021) (Ordered by KHUONGNM)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 15 / 38
ADD B DEFECT LIST 16:36 NHATHC

27.Sep.2021 LHS EMPENNAGE FUSELAGE SKIN WITH PAINT PEELED OFF BTW LHS EMPENNAGE FUSELAGE SKIN WITH PAINT PEELED OFF BTW
A584/WO 600020 45 Day
FR76-FR77 REQUIRE PAINT TOUCH-UP ON FUSELAGE SKIN NO SPARE FR76-FR77 REQUIRE PAINT TOUCH-UP ON FUSELAGE SKIN NO SPARE
(Iss.Date: 29.Jun.2021 ) PAINT AVAIL, ADD B0096239-10 RAISED IAW SRM 51-11-00 PARA 2B.3, DUE PAINT AVAIL, ADD B0096239-10 RAISED IAW SRM 51-11-00 PARA 2B.3, DUE
(Iss.Station: HAN) AT NEXT CONVENIENT OPPOTUNITY AT NEXT CONVENIENT OPPOTUNITY

27.Sep.2021 PAINT PEELED-OFF AT PNL 192 FB DUE TO NIL SPARE ADD B0096239-13 PAINT PEELED-OFF AT PNL 192 FB DUE TO NIL SPARE ADD B0096239-13
A584/WO 599992 45 Day
RAISED IAW 51-11-00 PARA 2.B.3 REV 01 MAY 21. DUE NEXT CONVENIENT RAISED IAW 51-11-00 PARA 2.B.3 REV 01 MAY 21.
(Iss.Date: 29.Jun.2021 ) OPPERTUNITY
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

04MDA3 CLEAR COAT POLYURETHANE ( Noted by THUTV2 at 8:39 on 07.Jul.2021 )


1.00 0.00
(Request date: 07.Jul.2021 by THUTV2)

77827G20803 AEROBASE BLUE P0189121 19.Mar.2021 ( Noted by KHUONGNM at 1:45 on 27.Jul.2021 )


1.00 0.00 1.00
(Request date: 07.Jul.2021 by THUTV2) (22.Mar.2021) (Ordered by KHUONGNM) KHUONGNM: EDD 30 Jul

04EAC2 PRIMER POLYURETHANE PAINT ( Noted by THUTV2 at 8:39 on 07.Jul.2021 )


1.00 -0.00
(Request date: 07.Jul.2021 by THUTV2)

27.Sep.2021 ENG#1 RHS EXHAUST - THRUST REVERSER OPENING ACTUATOR ENG#1 RHS EXHAUST - THRUST REVERSER OPENING ACTUATOR LEAKING
A584/WO 599999 45 Day
LEAKING AT LEAT 1 DROP/SECOND NIL SPARE AVAIL, CARRY OUT AT LEAT 1 DROP/SECOND NIL SPARE AVAIL, CARRY OUT REMOVE OF
REMOVE OF DAMAGED RHS ACTUATOR IAW 78-36-51-000-010-A REV 01 DAMAGED RHS ACTUATOR IAW 78-36-51-000-010-A REV 01 MAY 2021 ADD
(Iss.Date: 29.Jun.2021 ) MAY 2021 ADD B0096242-20 RAISED FOR DISPATCH IAW MCLD 78-01 REV B0096242-20 RAISED FOR DISPATCH IAW MCLD 78-01 REV 21 JUN 2021
(Iss.Station: SGN) 21 JUN 2021
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

3282982-3 T/R OPENING ACTUATOR P0186221 17.Mar.2021 ( Noted by THUTV2 at 9:48 on 07.Jul.2021 )
1.00
(Request date: 07.Jul.2021 by THUTV2) (17.Mar.2021) (Ordered by TRONGND)
1.00 0.00
P0187321
(18.Mar.2021)
1.00
(Ordered by TRONGND)

27.Sep.2021 PAINT PEELED-OFF ON PNL 192 AB DUE TO NIL SPARE ADD B0096239-12 PAINT PEELED-OFF ON PNL 192 AB DUE TO NIL SPARE ADD B0096239-12
A584/WO 599986 45 Day
RAISED IAW SRM 51-11-00 PARA 2.B.3 REV 01.MAY.2021 DUE: NEXT RAISED IAW SRM 51-11-00 PARA 2.B.3 REV 01.MAY.2021 DUE: NEXT
(Iss.Date: 29.Jun.2021 ) CONVENIENT OPPOTUNITY CONVENIENT OPPOTUNITY
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

04MDA3 CLEAR COAT POLYURETHANE ( Noted by THUTV2 at 7:32 on 07.Jul.2021 )


1.00 0.00
(Request date: 07.Jul.2021 by THUTV2)

77827G20803 AEROBASE BLUE P0189121 19.Mar.2021 ( Noted by KHUONGNM at 1:45 on 27.Jul.2021 )


1.00 0.00 1.00
(Request date: 07.Jul.2021 by THUTV2) (22.Mar.2021) (Ordered by KHUONGNM) KHUONGNM: EDD 30 Jul

04EAC2 PRIMER POLYURETHANE PAINT ( Noted by THUTV2 at 7:32 on 07.Jul.2021 )


1.00 -0.00
(Request date: 07.Jul.2021 by THUTV2)

27.Sep.2021 PAINT PEELED-OFF ON RIVETS PNL 191 KB DUE TO NIL SPARE ADD PAINT PEELED-OFF ON RIVETS PNL 191 KB DUE TO NIL SPARE ADD
A584/WO 599991 45 Day
B0096239-11 RAISED IAW SRM 51-11-00 PARA 2.B.3 REV 01 MAY 2021 DUE: B0096239-11 RAISED IAW SRM 51-11-00 PARA 2.B.3 REV 01 MAY 2021
(Iss.Date: 29.Jun.2021 ) NEXT CONVENIENT OPPOTUNITY
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

77827G20803 AEROBASE BLUE P0189121 19.Mar.2021 ( Noted by KHUONGNM at 1:45 on 27.Jul.2021 )


1.00 0.00 1.00 KHUONGNM: EDD 30 Jul
(Request date: 07.Jul.2021 by THUTV2) (22.Mar.2021) (Ordered by KHUONGNM)

04MDA3 CLEAR COAT POLYURETHANE ( Noted by THUTV2 at 8:26 on 07.Jul.2021 )


1.00 0.00
(Request date: 07.Jul.2021 by THUTV2)

04EAC2 PRIMER POLYURETHANE PAINT ( Noted by THUTV2 at 8:26 on 07.Jul.2021 )


1.00 -0.00
(Request date: 07.Jul.2021 by THUTV2)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 16 / 38
ADD B DEFECT LIST 16:36 NHATHC

17.Oct.2021 MEL 25-20-06A , CAT D ADD B0096216-12: BAGGAGE BAR AT SEAT 28D, 27C, 23CD, 17C, 12C ADD B0096216-12: BAGGAGE BAR AT SEAT 28D, 27C, 23CD, 17C, 12C
A584/WO 585326 65 Day
DAMAGE DAMAGE. MEL 25-20-06A. CAT D. DEADLINE 17OCT2021
(Iss.Date: 19.Jun.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

139-00-110-00 CORNER BAGGAGE BAR ( Noted by DIEPTQ at 19:21 on 23.Jun.2021 )


3.00 1.00
(Request date: 23.Jun.2021 by DIEPTQ)

139-00-115-00 BAGGAGE BAR ( Noted by DIEPTQ at 19:21 on 23.Jun.2021 )


2.00 12.00
(Request date: 23.Jun.2021 by DIEPTQ)

139-00-112-00 ATTACHMENT BAGGAGE BAR P0242721 16.Oct.2021 ( Noted by TUANPV at 9:20 on 21.Jul.2021 )
3.00 1.00 3.00
(Request date: 21.Jul.2021 by TUANPV) (02.Aug.2021) (Ordered by KHUONGNM)

30.Oct.2021 CDL 23-01 ADD B0096244-26: 01 STATIC DISCHARGER AT LH ELEVATOR TRAILING ADD B0096244-26: 01 STATIC DISCHARGER AT LH ELEVATOR TRAILING
A584/WO 606256 78 Day
EDGE INOP EDGE INOP. REF CDL 23-01. DEADLINE ASAP
(Iss.Date: 01.Aug.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

NSA5407-32-12 RIVET ( Noted by NHATHC at 9:38 on 04.Aug.2021 )


4.00 50.00
(Request date: 04.Aug.2021 by NHATHC)

NSA936221-01 SUPPORT ( Noted by NHATHC at 9:38 on 04.Aug.2021 )


1.00 3.00
(Request date: 04.Aug.2021 by NHATHC)

D5528122820000 SHIM ( Noted by NHATHC at 9:38 on 04.Aug.2021 )


1.00 0.00
(Request date: 04.Aug.2021 by NHATHC)

NSA5407-32-15 RIVET ( Noted by NHATHC at 9:38 on 04.Aug.2021 )


4.00 4.00
(Request date: 04.Aug.2021 by NHATHC)

02.Mar.2022 ADD B0064928-08:ENG 1 RUBBER SEAL AT 7 OCLOCK CRACK ADD B0064928-08:ENG 1 RUBBER SEAL AT 7 OCLOCK CRACK IS RAISED REF
A584/WO 542963 201 Day
ADD B0064928-08:ENG 1 RUBBER SEAL AT 7 OCLOCK CRACK AMM 72-32-87-200-010 DEADLINE : NEXT SHOP VISIT. OPM RAISE 750FH 750
(Iss.Date: 02.Mar.2021 )
FC 4 MONTHS RAISED BY 069AC
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A0829 SEAL ( Noted by at on )


1.00 0.00
(Request date: 08.Mar.2021 by DATMD)

02.Mar.2022 ADD B0064928-07:ENG 1 RUBBER SEAL AT 12 OCLOCK CRACK ADD B0064928-07:ENG 1 RUBBER SEAL AT 12 OCLOCK CRACK IS RAISED REF
A584/WO 542961 201 Day
ADD B0064928-07:ENG 1 RUBBER SEAL AT 12 OCLOCK CRACK AMM 72-32-87-200-010 DEADLINE : NEXT SHOP VISIT. OPM RAISE 750FH 750
(Iss.Date: 02.Mar.2021 )
FC 4 MONTHS
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A1601 SEAL ( Noted by at on )


1.00 0.00
(Request date: 08.Mar.2021 by DATMD)

23.Dec.2022 ENG#1 FANCOWL HINGE FITTING #3 WITH CHAFFED DAMAGED / GOUGE ENG#1 FANCOWL HINGE FITTING #3 WITH CHAFFED DAMAGED / GOUGE
A584/WO 599994 2999 FC
PERFORM CLEAR DAMAGE REF SRM 54-20-00 REPAIR 54 (VRS 7510) REV 01 PERFORM CLEAR DAMAGE REF SRM 54-20-00 REPAIR 54 (VRS 7510) REV 01
(Iss.Date: 26.Jun.2021 ) MAY 2021 ADD B009242-19 RAISED FOR RE-INSPECTION FOR EVERY 3000FC MAY 2021 ADD B009242-19 RAISED FOR RE-INSPECTION FOR EVERY 3000FC
(Iss.Station: SGN)

01.Mar.2023 B0064918-11: LEAD BONDING OF LH MLG DOOR DAMAGED B0064918-11: LEAD BONDING OF LH MLG DOOR DAMAGED ; AMM
A584/WO 542743 565 Day
24-92-00-210-024A EXP 24 MONTHS OR 7500 FH OR 5000 FC (WHATEVER
(Iss.Date: 01.Mar.2021 )
COME FIRST)
(Iss.Station: HAN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 17 / 38
ADD B DEFECT LIST 16:36 NHATHC

12.May.2023 B0064918-11: LEAD BONDING OF LH MLG DOOR DAMAGED B0064918-11: LEAD BONDING OF LH MLG DOOR DAMAGED ; AMM
A584/WO 542743 6925:1 FH
24-92-00-210-024A EXP 24 MONTHS OR 7500 FH OR 5000 FC (WHATEVER
(Iss.Date: 01.Mar.2021 )
COME FIRST)
(Iss.Station: HAN)

04.Sep.2023 B0064918-11: LEAD BONDING OF LH MLG DOOR DAMAGED B0064918-11: LEAD BONDING OF LH MLG DOOR DAMAGED ; AMM
A584/WO 542743 4529 FC
24-92-00-210-024A EXP 24 MONTHS OR 7500 FH OR 5000 FC (WHATEVER
(Iss.Date: 01.Mar.2021 )
COME FIRST)
(Iss.Station: HAN)

26.Dec.2048 B0096240-14 WAS RAISED: 01 EA DENT AT FUSELAGE SKIN BTW FRAME B0096240-14 WAS RAISED: 01 EA DENT AT FUSELAGE SKIN BTW FRAME
A584/WO 599907 59999 FC
74-75 STRINGER 30 LH 74-75 STRINGER 30 LH
(Iss.Date: 23.Jun.2021 )
(Iss.Station: SGN)

VN-A585 Open Defects = 9


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

15.Aug.2021 B0055725-11/NRC#14/WO 548052/ WP 441833: VERTICAL LEADING EDGE B0055725-11/NRC#14/WO 548052/ WP 441833: VERTICAL LEADING EDGE
A585/WO 548694 2 Day
WITH PAINT PEELED OFF; EROSION PROTECTIVE TAPE APPLIED WITH PAINT PEELED OFF; EROSION PROTECTIVE TAPE APPLIED; SRM
(Iss.Date: 29.Mar.2021 )
51-11-00PAR.2B4 EXP: NEXT CONVENIENT OPPOTUNITY
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

77827G50342 TOPCOAT(GREEN) P0189121 19.Mar.2021 ( Noted by TRANGNH at 9:57 on 13.Aug.2021 )


1.00 0.00 5.00
(Request date: 05.Apr.2021 by TINHCX) (22.Mar.2021) (Ordered by KHUONGNM) hàng đã về HAN

27.Aug.2021 ADD B0043976-07:"WINDSHIELD HAS SOME BUBBLES AND VISIBILITY NOT ADD B0043976-07:"WINDSHIELD HAS SOME BUBBLES AND VISIBILITY NOT
A585/WO 372319 14 Day
IMPAID IMPAIDED" IS RAISED REF AMM : 56-11-11-200-001-A.DEADLINE: ASAP
(Iss.Date: 08.May.2020 ) "WINDSHIELD HAS SOME BUBBLES AND VISIBILITY NOT IMPAIDED"
(Iss.Station: SGN)

06.Oct.2021 MEL 31-00-03A , CAT D ADD B0124375-05:"DAR ON MAINT STS" ADD B0124375-05:"DAR ON MAINT STS" IS RAISED,REF MEL: 31-00-03A.CAT
A585/WO 582839 54 Day
"DAR ON MAINT STS" D.DEADLINE: 06/10/21
(Iss.Date: 08.Jun.2021 )
(Iss.Station: HAN)

27.Nov.2021 ADD B 0041876-01: FO WINDSHIELD AT DELAMINATION AT UPPER EDGE ADD B 0041876-01: FO WINDSHIELD AT DELAMINATION AT UPPER EDGE
A585/WO 454819 106 Day
X=40MM X=40MM IS RAISED REF AMM 56-11-11-200-001 DEADLINE : ASAP RAISED
(Iss.Date: 07.Sep.2020 ) ADD B 0041876-01: FO WINDSHIELD AT DELAMINATION AT UPPER EDGE BY 069AC
(Iss.Station: SGN) X=40MM

23.Oct.2022 B35350-5:DENT AT SLAT #2 RH WING B35350-5:DENT AT SLAT #2 RH WING (CHEKC HST BEFORE EACH FLIGHT)
A585/WO 462790 436 Day
EXP: FC: 17123 OR FH: 39603 OR 23/10/22
(Iss.Date: 23.Oct.2020 )
(Iss.Station: HAN)
WorkOrder Remarks

Updated by DUNGLV at 18.Mar.2021 : OPM0041: 1. PERFORM CHECK HI-SPEED TAPE AT NOSE PART OF TOP SKIN
Updated by DUNGLV at 18.Mar.2021 : SLAT 2 RH WING REF SDR/BAV/20/0019 (EACH FLIGHT)
Updated by DUNGLV at 18.Mar.2021 : SLAT 2 RH WING PERMANENT REPAIR BY EO A321-57-0008 AT C CHECK
12.Jan.2023 ADD B0041417-05: A HOLE ON OGV OF ENG 2 WITH D=0.001IN REF AMM ADD B0041417-05: A HOLE ON OGV OF ENG 2 WITH D=0.001IN REF AMM
A585/WO 362776 517 Day
72-23-00-210-003C DAMAGE IN LIMIT. DEADLINE ASAP 72-23-00-210-003C DAMAGE IN LIMIT. DEADLINE ASAP
(Iss.Date: 17.Apr.2020 )
(Iss.Station: HAN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 18 / 38
ADD B DEFECT LIST 16:36 NHATHC

12.Jan.2023 ADD B41418-06: ENG 2 FINGER SEAL DAMAGE (A PART MISSING) ADD B41418-06: ENG 2 FINGER SEAL DAMAGE (APART MISSING) REF AMM
A585/WO 362777 517 Day
78-11-11-210-043B. EXPIRE: NEXT SHOP VISIT
(Iss.Date: 17.Apr.2020 )
(Iss.Station: HAN)

31.May.2023 B35350-5:DENT AT SLAT #2 RH WING B35350-5:DENT AT SLAT #2 RH WING (CHEKC HST BEFORE EACH FLIGHT)
A585/WO 462790 3953 FC
EXP: FC: 17123 OR FH: 39603 OR 23/10/22
(Iss.Date: 23.Oct.2020 )
(Iss.Station: HAN)
WorkOrder Remarks

Updated by DUNGLV at 18.Mar.2021 : OPM0041: 1. PERFORM CHECK HI-SPEED TAPE AT NOSE PART OF TOP SKIN
Updated by DUNGLV at 18.Mar.2021 : SLAT 2 RH WING REF SDR/BAV/20/0019 (EACH FLIGHT)
Updated by DUNGLV at 18.Mar.2021 : SLAT 2 RH WING PERMANENT REPAIR BY EO A321-57-0008 AT C CHECK
08.Oct.2023 B35350-5:DENT AT SLAT #2 RH WING B35350-5:DENT AT SLAT #2 RH WING (CHEKC HST BEFORE EACH FLIGHT)
A585/WO 462790 8542:0 FH
EXP: FC: 17123 OR FH: 39603 OR 23/10/22
(Iss.Date: 23.Oct.2020 )
(Iss.Station: HAN)

WorkOrder Remarks

Updated by DUNGLV at 18.Mar.2021 : OPM0041: 1. PERFORM CHECK HI-SPEED TAPE AT NOSE PART OF TOP SKIN
Updated by DUNGLV at 18.Mar.2021 : SLAT 2 RH WING REF SDR/BAV/20/0019 (EACH FLIGHT)
Updated by DUNGLV at 18.Mar.2021 : SLAT 2 RH WING PERMANENT REPAIR BY EO A321-57-0008 AT C CHECK

VN-A586 Open Defects = 25


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

02.Jul.2021 ADD B124029-43: 02 CRACK AT 02 LINER PANEL POSITION 5H IAW AMM ADD B124029-43: 02 CRACK AT 02 LINER PANEL POSITION 5H IAW AMM
A586/WO 600282 25 FC
72-32-87-200-010-13 REV 01MAY2021. WITHIN 125FH OR 25FC WHICHEVER 72-32-87-200-010-13 REV 01MAY2021. WITHIN 125FH OR 25FC WHICHEVER
(Iss.Date: 08.Jul.2021 ) OCCURS FIRST. DEADLINE 43916.24FH, OR 24840FC. OCCURS FIRST. DEADLINE 43916.24FH, OR 24840FC
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A0807 PANEL FRONT LINER ( Noted by TRANGNH at 14:38 on 30.Jul.2021 )


2.00 0.00 ALT PN: 5A1615, P0237121 chờ thanh toán trả nợ mới giao hàng
(Request date: 08.Jul.2021 by DIEPTQ)

10.Jul.2021 ADD B124029-43: 02 CRACK AT 02 LINER PANEL POSITION 5H IAW AMM ADD B124029-43: 02 CRACK AT 02 LINER PANEL POSITION 5H IAW AMM
A586/WO 600282 125:0 FH
72-32-87-200-010-13 REV 01MAY2021. WITHIN 125FH OR 25FC WHICHEVER 72-32-87-200-010-13 REV 01MAY2021. WITHIN 125FH OR 25FC WHICHEVER
(Iss.Date: 08.Jul.2021 ) OCCURS FIRST. DEADLINE 43916.24FH, OR 24840FC. OCCURS FIRST. DEADLINE 43916.24FH, OR 24840FC
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A0807 PANEL FRONT LINER ( Noted by TRANGNH at 14:38 on 30.Jul.2021 )


2.00 0.00 ALT PN: 5A1615, P0237121 chờ thanh toán trả nợ mới giao hàng
(Request date: 08.Jul.2021 by DIEPTQ)

30.Jul.2021 MEL 32-07-07 , CAT D B0055024-04 MW #2 NO TPIS C/O REMOVED PRESS TRANSDUCER. ADD RAISED FOR MW #2 TIRE PRESS
A586/WO 549949 -14 Day
INDICATION INOP REF MEL 32-07-07, CAT D, EX DATE: 30 JUL 2021
(Iss.Date: 01.Apr.2021 )
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

4133801030 PRESSURE TRANSDUCER ( Noted by CHINHND at 2:56 on 19.Jul.2021 )


1.00 5.00
(Request date: 19.Jul.2021 by CHINHND)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 19 / 38
ADD B DEFECT LIST 16:36 NHATHC

MS24665-134 PIN-COTTER ( Noted by CHINHND at 2:56 on 19.Jul.2021 )


1.00 3'649.00
(Request date: 19.Jul.2021 by CHINHND)

4611375003 WASHER ( Noted by CHINHND at 2:56 on 19.Jul.2021 )


4.00 454.00
(Request date: 19.Jul.2021 by CHINHND)

31.Jul.2021 ADD B124019-14: ENG 2 HOIST POINT PLACARD ON 461AL DAMAGE ADD B124019-14: ENG 2 HOIST POINT PLACARD ON 461AL DAMAGE. REF
A586/WO 594373 -13 Day
LMM 2.5.8 DEADLINE 31JULY2021
(Iss.Date: 01.Jul.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

740-0394-251 PLACARD P0242521 15.Aug.2021 ( Noted by TRANGNH at 10:27 on 31.Jul.2021 )


1.00 0.00 10.00 dự kiến 20/8 hàng về
(Request date: 06.Jul.2021 by QUANGTN) (30.Jul.2021) (Ordered by BATD)

03.Sep.2021 CDL 27-10 ADD B64835-05: SEAL AT LH OUTBOARD SLAT 1 DAMAGE ADD B64835-05: SEAL AT LH OUTBOARD SLAT 1 DAMAGE. REF CDL 27-10.
A586/WO 544047 21 Day
DEADLINE 03/09/2021
(Iss.Date: 07.Mar.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

MS21059L06 NUT-PLATE ( Noted by at on )


50.00 5.00
(Request date: 07.Mar.2021 by DIEPTQ)

EF2004S06-2 NUT-PLATE P0221021 03.Sep.2021 ( Noted by TRANGNH at 16:19 on 09.Aug.2021 )


20.00 0.00 20.00 đã đặt hàng FL Technics, đang đợi thanh toán (hồ sơ trả trước)
(Request date: 07.Mar.2021 by DIEPTQ) (01.Jun.2021) (Ordered by TRANGNH)

D5746019420600 SEAL, SLAT 1 ( Noted by at on )


1.00 0.00
(Request date: 07.Mar.2021 by DIEPTQ)

11.Sep.2021 CDL 78-01 ADD B0124035-63: REMOVE ACTUATOR PISTON ROD ON RH T/R OPENNING ADD B0124035-63: REMOVE ACTUATOR PISTON ROD ON RH T/R OPENNING
A586/WO 601339 29 Day
OF ENG#2 DUE TO LEAK OF ENG#2 DUE TO LEAK IS RAISED REF CDL 78-01 DEADLINE : ASAP
(Iss.Date: 12.Jul.2021 )
RAISED BY 016AC
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

3282982-3 T/R OPENING ACTUATOR P0186221 17.Mar.2021 ( Noted by NHATHC at 15:51 on 12.Jul.2021 )
1.00
(Request date: 12.Jul.2021 by NHATHC) (17.Mar.2021) (Ordered by TRONGND)
1.00 0.00
P0187321
1.00
(18.Mar.2021) (Ordered by TRONGND)

12.Sep.2021 MEL 32-09-02A , CAT D B111471-09 LH NW TPIS INOP DUE TO PRESS TRANSDUCER REMOVED ADD RAISED REF MEL 32-09-02A, CAT D, EXP DATE: 12 SEP 2021
A586/WO 578040 30 Day
(Iss.Date: 15.May.2021 )
(Iss.Station: SGN)

20.Sep.2021 ADD B0124002-15: RESTORE NEW PAINT AT RH TR OUTER SKIN AT ENG 2 ADD B0124002-15 RAISED FOR RESTORE NEW PAINT AT RH TR OUTER SKIN
A586/WO 586221 38 Day
AT ENG 2 REF SRM 51-11-00. DEADLINE: FIRST CONVIENIENT
(Iss.Date: 22.Jun.2021 )
OPPORTUNITY
(Iss.Station: SGN)

28.Sep.2021 MEL 35-30-03A , CAT D B050593-12: 01 PBE AT RH AFT CABIN UN-SERVICED (DUE TO STAMP LOCK ADD RAISED REF MEL 35-30-03A, CAT D, DUE DATE: 28 SEP 2021
A586/WO 581364 46 Day
BROKEN)
(Iss.Date: 31.May.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

B2007C041 LATCH, SEAL ( Noted by CHINHND at 3:9 on 09.Jul.2021 )


1.00 21.00
(Request date: 09.Jul.2021 by CHINHND)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 20 / 38
ADD B DEFECT LIST 16:36 NHATHC

15-40F-80 PROTECT. BREATHING EQPT (PBE) P0234621 28.Sep.2021 ( Noted by TRANGNH at 16:20 on 09.Aug.2021 )
(Request date: 01.Jun.2021 by TUNGVNA) (13.Jul.2021)
1.00 đã đặt hàng P0234621, đang đợi thanh toán trả trước
(Ordered by TRANGNH)
1.00 0.00
P0219721 30.Sep.2021
(28.May.2021)
1.00
(Ordered by KHUONGNM)

01.Oct.2021 MEL 25-50-01A , CAT D ADD B0080306-15. SURFACE OF MAT BALL 132NF CORROSION ON SOME ADD B0080306-15. SURFACE OF MAT BALL 132NF CORROSION ON SOME
A586/WO 582094 49 Day
BALL UNIT ATTACH NEAR FWD EDGE 132MF MANY CORROSION ON BALL BALL UNIT ATTACH NEAR FWD EDGE 132MF MANY CORROSION ON BALL
UNIT ATTACH NEAR FWD AND LH EDGE. UNIT ATTACH NEAR FWD AND LH EDGE. MEL 25-50-01A. CAT D.
(Iss.Date: 03.Jun.2021 ) DEADLINE 01OCT2021. OPS LIMIT: REF WEIGHT AND BALANCE MANUAL:
(Iss.Station: HAN) CTL-LIM-FWD-ULD-CMF, CTL-LIM-AFT-ULD-CMF
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D2557215702000 MAT ASSY-BALL ( Noted by at on )


1.00 0.00
(Request date: 06.Jun.2021 by HAIPD)

D2557215902000 MAT ASSY-BALL ( Noted by at on )


1.00 0.00
(Request date: 06.Jun.2021 by HAIPD)

06.Oct.2021 B050596-19 SOME POINT PAINT PEEL OFF BTW FR 21- FR 21 AND STG 41LH - ADD RAISED IAW SRM 51-11-00. DUE DATE: FIRST OPPORTUNITY
A586/WO 581367 54 Day
STG 41RH
(Iss.Date: 31.May.2021 )
(Iss.Station: HAN)

27.Nov.2021 B0036817-02 CAPT WINDSHIELD DELAMINATION AT UPPER AND FWD REF AMM 56-11-11-800-001A. CHECK FOUND IN LIMIT. ADD RAISED. EXP
A586/WO 459555 106 Day
EDGE (MAX DEPTH = 15MM) DATE: ASAP
(Iss.Date: 01.Oct.2020 )
(Iss.Station: SGN)

27.Nov.2021 B72116-3: 01 EA STATIC DISCHARGER AT TOP RUDDER INOP RAISED IAW B72116-3: 01 EA STATIC DISCHARGER AT TOP RUDDER INOP RAISED IAW
A586/WO 471509 106 Day
CDL 23-01 EXP: ASAP CDL 23-01 EXP: ASAP
(Iss.Date: 10.Dec.2020 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

2-14SC1 STATIC DISCHARGER ( Noted by at on )


1.00 7.00
(Request date: 11.Dec.2020 by DUNGLV)

23.Jul.2022 ADD B0068747-11: LEADING BONDING AT LH NOSE LANDING GEAR DOOR ADD B0068747-11: LEADING BONDING AT LH NOSE LANDING GEAR DOOR
A586/WO 468863 344 Day
DAMAGED DAMAGED. REF AMM 24-12-00-210-024A REV 01NOV2020. INTERVAL 24
(Iss.Date: 23.Nov.2020 )
MONTH OR 7500FH OR 5000FC
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 25.Nov.2020 by DUNGLV) (24.May.2021) (Ordered by QUYNHNTD)

30.Oct.2022 ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX
A586/WO 464257 443 Day
HINGER HINGER IS RAISED REF AMM 24-92-00-210-024A DEADLINE : 24 MONTHS
(Iss.Date: 30.Oct.2020 ) ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX 7500FH 5000FC CURRENT 23825 FC 4262652 IN TLP
(Iss.Station: SGN) HINGGER ARM NO4

30.Oct.2022 ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER ARM
A586/WO 464254 443 Day
ARM NO4 NO4 IS RAISED REF AMM 24-92-00-210-024A DEADLINE : 24 MONTHS 7500FH
(Iss.Date: 30.Oct.2020 ) ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER 5000FC CURRENT 23825 FC 4262652 IN TLP
(Iss.Station: SGN) ARM NO4

25.Dec.2022 ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER ARM
A586/WO 464254 4010 FC
ARM NO4 NO4 IS RAISED REF AMM 24-92-00-210-024A DEADLINE : 24 MONTHS 7500FH
(Iss.Date: 30.Oct.2020 ) ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER 5000FC CURRENT 23825 FC 4262652 IN TLP
(Iss.Station: SGN) ARM NO4

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 21 / 38
ADD B DEFECT LIST 16:36 NHATHC

25.Dec.2022 ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX
A586/WO 464257 4010 FC
HINGER HINGER IS RAISED REF AMM 24-92-00-210-024A DEADLINE : 24 MONTHS
(Iss.Date: 30.Oct.2020 ) ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX 7500FH 5000FC CURRENT 23825 FC 4262652 IN TLP
(Iss.Station: SGN) HINGGER ARM NO4

02.Jan.2023 ADD B0068747-11: LEADING BONDING AT LH NOSE LANDING GEAR DOOR ADD B0068747-11: LEADING BONDING AT LH NOSE LANDING GEAR DOOR
A586/WO 468863 4079 FC
DAMAGED DAMAGED. REF AMM 24-12-00-210-024A REV 01NOV2020. INTERVAL 24
(Iss.Date: 23.Nov.2020 )
MONTH OR 7500FH OR 5000FC
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 25.Nov.2020 by DUNGLV) (24.May.2021) (Ordered by QUYNHNTD)

10.Mar.2023 ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX
A586/WO 464257 6247:55 FH
HINGER HINGER IS RAISED REF AMM 24-92-00-210-024A DEADLINE : 24 MONTHS
(Iss.Date: 30.Oct.2020 ) ADD B00914-18: BONDING LEAD BROKEN AT LH ELEVATOR SPARE BOX 7500FH 5000FC CURRENT 23825 FC 4262652 IN TLP
(Iss.Station: SGN) HINGGER ARM NO4

10.Mar.2023 ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER ARM
A586/WO 464254 6247:55 FH
ARM NO4 NO4 IS RAISED REF AMM 24-92-00-210-024A DEADLINE : 24 MONTHS 7500FH
(Iss.Date: 30.Oct.2020 ) ADD B00913-17: BONDING LEAD BROKEN AT RH ELEVATOR HINGGER 5000FC CURRENT 23825 FC 4262652 IN TLP
(Iss.Station: SGN) ARM NO4

20.Mar.2023 ADD B0068747-11: LEADING BONDING AT LH NOSE LANDING GEAR DOOR ADD B0068747-11: LEADING BONDING AT LH NOSE LANDING GEAR DOOR
A586/WO 468863 6349:19 FH
DAMAGED DAMAGED. REF AMM 24-12-00-210-024A REV 01NOV2020. INTERVAL 24
(Iss.Date: 23.Nov.2020 )
MONTH OR 7500FH OR 5000FC
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-160NN LEAD BONDING P0217921 16.Jun.2021 ( Noted by at on )


1.00 0.00 50.00
(Request date: 25.Nov.2020 by DUNGLV) (24.May.2021) (Ordered by QUYNHNTD)

22.Apr.2023 ADD B0080303-06: LEADING BONDING AT RH MOVEABLE AFT FAIRING ADD B0080303-06: LEADING BONDING AT RH MOVEABLE AFT FAIRING
A586/WO 582088 4956 FC
ENG 2 DAMAGE. ENG 2 DAMAGE. REF AMM 24-92-00-210-024A. REV 01MAY2021. DEADLINE
(Iss.Date: 03.Jun.2021 )
03/06/2023 OR 51325:21 FH OR 29771 FC WHICHEVER COMES FIRST
(Iss.Station: HAN)

03.Jun.2023 ADD B0080303-06: LEADING BONDING AT RH MOVEABLE AFT FAIRING ADD B0080303-06: LEADING BONDING AT RH MOVEABLE AFT FAIRING
A586/WO 582088 659 Day
ENG 2 DAMAGE. ENG 2 DAMAGE. REF AMM 24-92-00-210-024A. REV 01MAY2021. DEADLINE
(Iss.Date: 03.Jun.2021 )
03/06/2023 OR 51325:21 FH OR 29771 FC WHICHEVER COMES FIRST
(Iss.Station: HAN)

29.Jun.2023 ADD B0080303-06: LEADING BONDING AT RH MOVEABLE AFT FAIRING ADD B0080303-06: LEADING BONDING AT RH MOVEABLE AFT FAIRING
A586/WO 582088 7444:26 FH
ENG 2 DAMAGE. ENG 2 DAMAGE. REF AMM 24-92-00-210-024A. REV 01MAY2021. DEADLINE
(Iss.Date: 03.Jun.2021 )
03/06/2023 OR 51325:21 FH OR 29771 FC WHICHEVER COMES FIRST
(Iss.Station: HAN)

VN-A587 Open Defects = 21


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

10.Aug.2021 MEL 23-72-01A , CAT D ADD B37694-01: COCKPIT DOOR VIDEO P/B INOP ADD B37694-01: COCKPIT DOOR VIDEO P/B INOP. MEL 23-72-01A. CAT D.
A587/WO 562374 -3 Day
DEADLINE 10/08/2021. MEL REV MAR2021
(Iss.Date: 12.Apr.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0239D5A TOGGLE SWITCH P0214621 10.Aug.2021 ( Noted by TRUNGPB at 11:30 on 09.Aug.2021 )


1.00 0.00 1.00 ALT PN: 360PS01D5A - P0214621 hàng đã về HAN, đợi Bee clear công nợ và giao hàng
(Request date: 13.Apr.2021 by TUANPV) (13.May.2021) (Ordered by TRANGNH)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 22 / 38
ADD B DEFECT LIST 16:36 NHATHC

26.Aug.2021 CDL 57-02 ADD B60729-06: LH SLIDE PANEL DAMAGED ADD B60729-06: LH SLIDE PANEL DAMAGED. REF CDL 57-02. DEADLINE
A587/WO 542439 13 Day
26AUG2021
(Iss.Date: 27.Feb.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D5337540900000 SLIDING PANEL ( Noted by TRANGNH at 4:10 on 12.Aug.2021 )


1.00 0.00 đã đặt ALT P/N: E5337150500000 (P0198521), đang đợi thông tin release hàng
(Request date: 28.Feb.2021 by DATMD)

27.Aug.2021 ADD B60730-07: LEAD BONDING AT FWD RH MLG DOOR DAMAGE ADD B60730-07: LEAD BONDING AT FWD RH MLG DOOR DAMAGE. REF
A587/WO 542440 14 Day
AMM 20-28-00-200-001. DEADLINE NEXT MAINT CHECK/ 6 MONTH/ 1000FC/
(Iss.Date: 27.Feb.2021 )
1000FH
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

ABS03946210 STRAP-BONDING ( Noted by TRANGNH at 4:11 on 12.Aug.2021 )


1.00 0.00 đã đặt P/N: ABS0394G210, đã nhập kho 23/5
(Request date: 05.Mar.2021 by TUNGVNA)

03.Sep.2021 MEL 33-40-07A , CAT D ADD B0052067-02: LH LOGO LIGHT INOP ADD B0052067-02: LH LOGO LIGHT INOP. MEL 33-40-07A. CAT D. DEADLINE
A587/WO 569094 21 Day
03SEP2021
(Iss.Date: 06.May.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

9GD400759-00 SEAL P0221121 03.Sep.2021 ( Noted by TRANGNH at 16:22 on 09.Aug.2021 )


5.00 0.00 5.00 đã đặt hàng SATAIR, thanh toán trả nợ mới giao hàng
(Request date: 13.May.2021 by HAIPD) (01.Jun.2021) (Ordered by TRANGNH)

05.Sep.2021 ADD B60730-07: LEAD BONDING AT FWD RH MLG DOOR DAMAGE ADD B60730-07: LEAD BONDING AT FWD RH MLG DOOR DAMAGE. REF
A587/WO 542440 434:34 FH
AMM 20-28-00-200-001. DEADLINE NEXT MAINT CHECK/ 6 MONTH/ 1000FC/
(Iss.Date: 27.Feb.2021 )
1000FH
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

ABS03946210 STRAP-BONDING ( Noted by TRANGNH at 4:11 on 12.Aug.2021 )


1.00 0.00 đã đặt P/N: ABS0394G210, đã nhập kho 23/5
(Request date: 05.Mar.2021 by TUNGVNA)

10.Sep.2021 MEL 52-51-06A , CAT D ADD B094353-2 TOP LATCH OF CDLS STUCKED AT OPEN POSITION ADD B094353-2 TOP LATCH OF CDLS STUCKED AT OPEN POSITION IAW
A587/WO 577643 28 Day
ADD B094353-2 TOP LATCH OF CDLS STUCKED AT OPEN POSITION IAW MEL 52-51-06A.CAT D.DEADLINE 10 SEP 2021 (BAV062AC)
(Iss.Date: 13.May.2021 ) MEL 52-51-06A.CAT D.DEADLINE 10 SEP 2021 (BAV062AC)
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

72878-2 COVER ROD DBS ( Noted by at on )


1.00 8.00
(Request date: 14.May.2021 by DIEPTQ)

AR4755-6 LATCH P0221821 10.Sep.2021 ( Noted by TRANGNH at 16:22 on 09.Aug.2021 )


1.00 0.00 5.00 đã đặt hàng P0221821, đang đợi thanh toán trả trước
(Request date: 14.May.2021 by DIEPTQ) (02.Jun.2021) (Ordered by TRANGNH)

20021-306 SCREW ( Noted by at on )


2.00 8.00
(Request date: 14.May.2021 by DIEPTQ)

32595-1 WASHER ( Noted by at on )


5.00 6.00
(Request date: 14.May.2021 by DIEPTQ)

20021-304 SCREW P0221021 10.Sep.2021 ( Noted by TRANGNH at 16:24 on 09.Aug.2021 )


3.00 0.00 20.00 đã đặt hàng FL Technics, đang đợi thanh toán (hồ sơ trả trước)
(Request date: 14.May.2021 by DIEPTQ) (01.Jun.2021) (Ordered by TRANGNH)

32594-1 CAP P0221721 10.Sep.2021 ( Noted by TRANGNH at 16:24 on 09.Aug.2021 )


5.00 4.00 10.00 đã đặt hàng P0221721, đang đợi thanh toán trả trước
(Request date: 14.May.2021 by DIEPTQ) (02.Jun.2021) (Ordered by TRANGNH)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 23 / 38
ADD B DEFECT LIST 16:36 NHATHC

22.Oct.2021 ADD B60730-07: LEAD BONDING AT FWD RH MLG DOOR DAMAGE ADD B60730-07: LEAD BONDING AT FWD RH MLG DOOR DAMAGE. REF
A587/WO 542440 523 FC
AMM 20-28-00-200-001. DEADLINE NEXT MAINT CHECK/ 6 MONTH/ 1000FC/
(Iss.Date: 27.Feb.2021 )
1000FH
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

ABS03946210 STRAP-BONDING ( Noted by TRANGNH at 4:11 on 12.Aug.2021 )


1.00 0.00 đã đặt P/N: ABS0394G210, đã nhập kho 23/5
(Request date: 05.Mar.2021 by TUNGVNA)

10.Nov.2021 ADD B073706-33:"RUBBING STRIP OF COVER PLATE DOOR 1RH MISSING" ADD B073706-33:"RUBBING STRIP OF COVER PLATE DOOR 1RH MISSING" IS
A587/WO 606398 550 FC
"RUBBING STRIP OF COVER PLATE DOOR 1RH MISSING" RAISED, REF AMM 52-12-13-300-002A.DEADLINE: 550FC OPM CHECK
(Iss.Date: 03.Aug.2021 )
INTERVAL EVERY 50FC IS RAISED FC ON TECHLOG: 22613FC
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

RUBBER & PLASTIC BONDING


3M-SCOTCH-WELD 1300L P0189821 31.May.2021 ( Noted by QUANGTN at 2:59 on 10.Aug.2021 )
1.00 1.00 3.00
(Request date: 10.Aug.2021 by QUANGTN) (23.Mar.2021) (Ordered by QUYNHNTD)

ASNA35807015 STRIP (RAW MATERIAL) ( Noted by QUANGTN at 2:58 on 10.Aug.2021 )


1.00 0.00
(Request date: 10.Aug.2021 by QUANGTN)

03.Mar.2022 ADD B61302-03: ENG 2 RUBBER SEAL DAMAGE AT 6 CLOCL LAF ADD B61302-03: ENG 2 RUBBER SEAL DAMAGE AT 6 CLOCL LAF REF AMM
A587/WO 543348 202 Day
72-32-87-200-010B. REV 01FEB2021. INTERVAL DEADLINE 750FC OR 750 FH
(Iss.Date: 03.Mar.2021 )
OR 04 MONTHS
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

5A0828 RUBBER SEAL PANEL P0175821 02.Mar.2021 ( Noted by at on )


(Request date: 06.Mar.2021 by HAIPD) (25.Feb.2021)
1.00
(Ordered by QUYNHNTD)
1.00 0.00
P0203821 15.Aug.2021
2.00
(19.Apr.2021) (Ordered by TRANGNH)

06.Apr.2022 B0037654-08: ANALYSIS OF HYD FLUID B0037654-08: ANALYSIS OF HYD FLUID (MPD CHECK OR 12MONTHS, THE
A587/WO 561887 236 Day
ONE OCCUR FIRST)
(Iss.Date: 06.Apr.2021 )
(Iss.Station: SGN)

26.Dec.2022 ADD B0053961-04: 01 BONDING LEAD AT FAIRING ASSY MOVABLE AFT ADD B0053961-04 IS RAISED FOR 01 BONDING LEAD AT FAIRING ASSY
A587/WO 514691 500 Day
ENG #1 (BAV040AC) MOVABLE AFT ENG #1, REF AMM 24-92-00-210-024A REV11/20, DEADLINE 26
(Iss.Date: 26.Dec.2020 )
DEC 2020 OR 57660FH OR 26848FC
(Iss.Station: SGN)

09.Apr.2023 ADD B0053961-04: 01 BONDING LEAD AT FAIRING ASSY MOVABLE AFT ADD B0053961-04 IS RAISED FOR 01 BONDING LEAD AT FAIRING ASSY
A587/WO 514691 6569:25 FH
ENG #1 (BAV040AC) MOVABLE AFT ENG #1, REF AMM 24-92-00-210-024A REV11/20, DEADLINE 26
(Iss.Date: 26.Dec.2020 )
DEC 2020 OR 57660FH OR 26848FC
(Iss.Station: SGN)

18.Jul.2023 ADD B0053961-04: 01 BONDING LEAD AT FAIRING ASSY MOVABLE AFT ADD B0053961-04 IS RAISED FOR 01 BONDING LEAD AT FAIRING ASSY
A587/WO 514691 4241 FC
ENG #1 (BAV040AC) MOVABLE AFT ENG #1, REF AMM 24-92-00-210-024A REV11/20, DEADLINE 26
(Iss.Date: 26.Dec.2020 )
DEC 2020 OR 57660FH OR 26848FC
(Iss.Station: SGN)

18.Jul.2026 B0054554-15 DENT ON SKIN BTW FR 64 - FR 65. STR6 25L-26L ADD RAISED. RE-INSPECTION REQUIRED AT NEX 60000FC/ 120000FH
A587/WO 547361 19522:10 FH
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

02.Jun.2031 B0054554-14 CORROSION ON SKIN BTW FR 73- FR74 STR 33L-33R ADD RAISED. RE-INSPECTION REQUIRED AT NEXT 21900 FC/ 43800 FH
A587/WO 547360 21494 FC
INTERVAL OF 5000 FC/ 10000 FH
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 24 / 38
ADD B DEFECT LIST 16:36 NHATHC

22.Jul.2032 B0054554-14 CORROSION ON SKIN BTW FR 73- FR74 STR 33L-33R ADD RAISED. RE-INSPECTION REQUIRED AT NEXT 21900 FC/ 43800 FH
A587/WO 547360 43322:10 FH
INTERVAL OF 5000 FC/ 10000 FH
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

20.Oct.2048 B0054555-16: 01 DENT ON LH AFT FUSELAGE AT AROUND FR 61-FR 70 BTW ADD RAISED. RE-INSPECTION REQUIRED AT NEXT 60000FC/ 120000 FH
A587/WO 547362 59594 FC
19-20 LH STR6
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

20.Oct.2048 B0054555-17 CORROSION ON SKIN BTW FR 76- FR77 STR6 31R-33R ADD RAISED. RE-INSPECTION AT NEXT 60000 FC/ 120000 FH
A587/WO 547363 59594 FC
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

20.Oct.2048 B0054554-15 DENT ON SKIN BTW FR 64 - FR 65. STR6 25L-26L ADD RAISED. RE-INSPECTION REQUIRED AT NEX 60000FC/ 120000FH
A587/WO 547361 59594 FC
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

25.Oct.2051 B0054555-17 CORROSION ON SKIN BTW FR 76- FR77 STR6 31R-33R ADD RAISED. RE-INSPECTION AT NEXT 60000 FC/ 120000 FH
A587/WO 547363 119522:10 FH
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

25.Oct.2051 B0054555-16: 01 DENT ON LH AFT FUSELAGE AT AROUND FR 61-FR 70 BTW ADD RAISED. RE-INSPECTION REQUIRED AT NEXT 60000FC/ 120000 FH
A587/WO 547362 119522:10 FH
19-20 LH STR6
(Iss.Date: 22.Mar.2021 )
(Iss.Station: SGN)

VN-A588 Open Defects = 13


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

04.Aug.2021 B0097600-10: 02 PLACARD AT ACCESS DOOR ON ENG 1 TR DAMAGED B0097600-10: 02 PLACARD AT ACCESS DOOR ON ENG 1 TR DAMAGED; LMM
A588/WO 582370 -9 Day
(Concession) 2.5.8B TYPE 2 EXP 05/07/21
(Iss.Date: 05.Jun.2021 )
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

BDL5523-01-0 PLACARD P0232221 20.Jul.2021 ( Noted by HOANNV at 1:41 on 09.Aug.2021 )


1.00 0.00 10.00 CHỜ THANH TOÁN BEE
(Request date: 07.Jun.2021 by DIEPTQ) (07.Jul.2021) (Ordered by BATD)

BDL5522-01-0 PLACARD P0232221 20.Jul.2021 ( Noted by HOANNV at 1:42 on 09.Aug.2021 )


1.00 0.00 10.00 CHỜ THANH TOÁN BEE
(Request date: 07.Jun.2021 by DIEPTQ) (07.Jul.2021) (Ordered by BATD)

BDL5524-01-0 PLACARD P0232221 20.Jul.2021 ( Noted by DATMD at 10:59 on 05.Jul.2021 )


1.00 9.00 10.00
(Request date: 07.Jun.2021 by DIEPTQ) (07.Jul.2021) (Ordered by BATD)

08.Aug.2021 ADD B080760-11:"BOTH FRONT SPINNER MISSING BLACK PAINT" ADD B080760-11:"BOTH FRONT SPINNER MISSING BLACK PAINT AND
A588/WO 583278 -5 Day
"BOTH FRONT SPINNER MISSING BLACK PAINT AND WHITE SPIRAL WHITE SPIRAL SHAPED MARK A BIT" IS RAISED REF AMM:
(Iss.Date: 09.Jun.2021 ) SHAPED MARK A BIT" 72-21-40-210-801A.DEADLINE ASAP
(Iss.Station: HAN)

08.Aug.2021 ADD B080759-09:"MISSING PAINT AT SOME OGV BOTH ENGS" ADD B080759-09:"MISSING PAINT AT SOME OGV BOTH ENGS" IS
A588/WO 583274 -5 Day
"MISSING PAINT AT SOME OGV BOTH ENGS" RAISED,REF AMM: 72-24-20-210-801A.DEADLINE: ASAP. (LESS THAN 25% OF
(Iss.Date: 09.Jun.2021 ) AIR FOIL SURFACE AND THERE IS NO CORROSION AND BASE METAL IS
(Iss.Station: HAN) NOT AFFECTED) OPM RAISED

12.Aug.2021 B0097599-09: BLACK PAINT COATING OF FAN BLADES AT BOTH ENG ARE B0097599-09: BLACK PAINT COATING OF FAN BLADES AT BOTH ENG ARE
A588/WO 582376 -1 Day
MISSING MISSING; AMM 72-21-20-210-802-A EXP ASAP
(Iss.Date: 05.Jun.2021 )
(Iss.Station: SGN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 25 / 38
ADD B DEFECT LIST 16:36 NHATHC

07.Oct.2021 B0080822-08: PERMANENT REPAIR OF FLOOR PANEL 151PF TERM CHECK B0080822-08: PERMANENT REPAIR OF FLOOR PANEL 151PF TERM CHECK
A588/WO 602359 346 FC
FOUND CRACK ON FLOOR PANEL AFT CATGO 151PF WITH D/W: FOUND CRACK ON FLOOR PANEL AFT CATGO 151PF WITH D/W:
15MM/15MM 15MM/15MM DAMAGE IS ALLOWABLE DAMAGE REF SRM 53-02-00-283-001
FLOOR PANEL ZONE C TABLE 4 C/O TEMPO REPAIR CRACK REF SRM
(Iss.Date: 19.Jul.2021 ) 51-77-13-911-009 WITH HSP ADD RAISED REF SRM 53-02-00-283-001 CAT 350
(Iss.Station: HAN) FC EXP 3677 FC

07.Oct.2021 B0080823-11: PERMANENT REPAIR OF FLOOR PANEL 151LF TERM CHECK B0080823-11: PERMANENT REPAIR OF FLOOR PANEL 151LF TERM CHECK
A588/WO 602358 346 FC
FOUND CRACK ON FLOOR PANEL AFT CATGO 151LF WITH D/W: FOUND CRACK ON FLOOR PANEL AFT CATGO 151LF WITH D/W:
20MM/20MM 20MM/20MM DAMAGE IS ALLOWABLE DAMAGE REF SRM 53-02-00-283-001
FLOOR PANEL ZONE C TABLE 4 C/O TEMPO REPAIR CRACK REF SRM
(Iss.Date: 19.Jul.2021 ) 51-77-13-911-009 WITH HSP ADD RAISED REF SRM 53-02-00-283-001 CAT 350
(Iss.Station: HAN) FC EXP 3677 FC

08.Oct.2021 MEL 31-30-07A , CAT D ADD B80763-19: PRINTER INOP DUE TO PRINT CONTINOUSLY ADD B80763-19: PRINTER INOP DUE TO PRINT CONTINOUSLY. MEL
A588/WO 583744 56 Day
31-30-07A. CAT D. DEADLINE 08OCT2021
(Iss.Date: 10.Jun.2021 )
(Iss.Station: HAN)

03.Feb.2023 ADD B97595-11: 02 LEAD BONDING AT LH AND RH NLG DOOR DAMAGE ADD B97595-11: 02 LEAD BONDING AT LH AND RH NLG DOOR DAMAGE
A588/WO 582102 539 Day
LESS THAN 25% LESS THAN 25%. REF AMM 24-92-00-220-002-A REV01MAY2021. DEADLINE
(Iss.Date: 03.Jun.2021 )
20 MONTHS, OR 5000FC, OR 7500FH WHICHEVER COMES FIRST
(Iss.Station: HAN)

06.Jun.2023 B97598-06 CHECK FOUND BONDING STRAP OF REFUEL PANEL TEAR ADD RAISED REF AMM 24-92-0-210-024A. DEADLINE 04 JUN 2023 OR 12986
A588/WO 582275 662 Day
FH OR 8327 FC
(Iss.Date: 04.Jun.2021 )
(Iss.Station: SGN)

24.Jun.2023 ADD B97595-11: 02 LEAD BONDING AT LH AND RH NLG DOOR DAMAGE ADD B97595-11: 02 LEAD BONDING AT LH AND RH NLG DOOR DAMAGE
A588/WO 582102 7389:55 FH
LESS THAN 25% LESS THAN 25%. REF AMM 24-92-00-220-002-A REV01MAY2021. DEADLINE
(Iss.Date: 03.Jun.2021 )
20 MONTHS, OR 5000FC, OR 7500FH WHICHEVER COMES FIRST
(Iss.Station: HAN)

24.Jun.2023 B97598-06 CHECK FOUND BONDING STRAP OF REFUEL PANEL TEAR ADD RAISED REF AMM 24-92-0-210-024A. DEADLINE 04 JUN 2023 OR 12986
A588/WO 582275 7391:36 FH
FH OR 8327 FC
(Iss.Date: 04.Jun.2021 )
(Iss.Station: SGN)

11.Nov.2023 B97598-06 CHECK FOUND BONDING STRAP OF REFUEL PANEL TEAR ADD RAISED REF AMM 24-92-0-210-024A. DEADLINE 04 JUN 2023 OR 12986
A588/WO 582275 4934 FC
FH OR 8327 FC
(Iss.Date: 04.Jun.2021 )
(Iss.Station: SGN)

11.Nov.2023 ADD B97595-11: 02 LEAD BONDING AT LH AND RH NLG DOOR DAMAGE ADD B97595-11: 02 LEAD BONDING AT LH AND RH NLG DOOR DAMAGE
A588/WO 582102 4933 FC
LESS THAN 25% LESS THAN 25%. REF AMM 24-92-00-220-002-A REV01MAY2021. DEADLINE
(Iss.Date: 03.Jun.2021 )
20 MONTHS, OR 5000FC, OR 7500FH WHICHEVER COMES FIRST
(Iss.Station: HAN)

VN-A589 Open Defects = 7


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

19.Aug.2021 ADD B081582-24 : ENG#1 OGV PLATFORM #3 AND #4 BROKEN AND ADD B081582-24 : ENG#1OGV PLATFORM #3 AND #4 BROKEN AND
A589/WO 602459 6 Day
REMOVED REMOVED RAISED IAW AMM 72-24-11-210-801.DEADLINE ASAP OGV
ADD B081582-24 : ENG#1OGV PLATFORM #3 AND #4 BROKEN AND PLATFORM #3 AND #4 OF ENG#1REMOVED IAW AMM 72-24-11-00-801A
REMOVED RAISED IAW AMM 72-24-11-210-801.DEADLINE ASAP OGV (BAV016AC)
(Iss.Date: 20.Jul.2021 ) PLATFORM #3 AND #4 OF ENG#1REMOVED IAW AMM 72-24-11-00-801A
(Iss.Station: HAN) (BAV016AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 26 / 38
ADD B DEFECT LIST 16:36 NHATHC

NAS1102E4-26 SCREW P0242321 19.Aug.2021 ( Noted by HAIPD at 19:46 on 20.Jul.2021 )


4.00 0.00 100.00
(Request date: 20.Jul.2021 by HAIPD) (30.Jul.2021) (Ordered by QUYNHNTD)

362-053-707-0 PLATFORM OUT OGV ( Noted by HAIPD at 19:46 on 20.Jul.2021 )


2.00 2.00
(Request date: 20.Jul.2021 by HAIPD)

06.Sep.2021 MEL 52-30-07A , CAT D ADD B56336-6 AFT CARGO DOOR OPEN/LOCK LT INOP ADD B56336-6 AFT CARGO DOOR OPEN/LOCK LT INOP IAW MEL
A589/WO 576114 24 Day
ADD B56336-6 AFT CARGO DOOR OPEN/LOCK LT INOP IAW MEL 52-30-07A.CAT D.DEADLINE 06-09-21 (BAV069AC)
(Iss.Date: 09.May.2021 ) 52-30-07A.CAT D.DEADLINE 06-09-21 (BAV069AC)
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

A9239559320400 SEALING P0212121 30.May.2021 ( Noted by at on )


(Request date: 10.May.2021 by DIEPTQ) (10.May.2021)
2.00
(Ordered by QUYNHNTD)
1.00 10.00
P0124020 10.Oct.2020
(29.Sep.2020)
3.00
(Ordered by HOANNV)

E0718-02 TUBING-HEAT-SHRINKABLE P0124020 10.Oct.2020 ( Noted by at on )


1.00 0.00 10.00
(Request date: 10.May.2021 by DIEPTQ) (29.Sep.2020) (Ordered by HOANNV)

E0070B1-07 LIGHT P0204021 09.Aug.2021 ( Noted by at on )


1.00
(Request date: 10.May.2021 by DIEPTQ) (19.Apr.2021) (Ordered by KHUONGNM)

P0198321 08.Apr.2021
5.00
(08.Apr.2021) (Ordered by TRONGND)
1.00 1.00
P0212221 30.May.2021
10.00
(10.May.2021) (Ordered by QUYNHNTD)

P0219621 01.Jun.2021
20.00
(27.May.2021) (Ordered by QUYNHNTD)

18.Sep.2021 ADD B081583-27 : TIP RUB AND MISING FIBER AT BLADE #8 (AREA H) ENG 1 ADD B081583-27 : TIP RUB AND MISING FIBER AT BLADE #8 - AREA H - (
A589/WO 602462 36 Day
ADD B081583-27 : TIP RUB AND MISING FIBER AT BLADE #8 - AREA H- ( L=1MM D =2MM) ENG 1 RAISED IAW AMM 72-21-20-210-802A.DEADLINE
L=1MM D =2MM) ENG 1 RAISED IAW AMM 72-21-20-210-802A.DEADLINE ASAP (BAV016AC)
(Iss.Date: 20.Jul.2021 ) ASAP (BAV016AC)
(Iss.Station: HAN)

05.Nov.2021 ADD B0056315-07: RUBBER SEAL UNDER SLAT 1 RH DAMAGE ADD B0056315-07: RUBBER SEAL UNDER SLAT 1 RH DAMAGE. REF CDL
A589/WO 566734 84 Day
27-07. REV 20/04/2021. DEADLINE ASAP. C/O MAINT PRO REF AMM
(Iss.Date: 02.May.2021 )
57-40-00-040-001 REV01MAY2021
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D5746059320000 ELBOW P0240221 31.Jul.2021 ( Noted by DIEPTQ at 16:41 on 28.Jul.2021 )


2.00 0.00 2.00
(Request date: 03.May.2021 by QUANGTN) (27.Jul.2021) (Ordered by TRONGND)

D5746019628251 RUBBER SEAL P0240221 31.Jul.2021 ( Noted by DIEPTQ at 16:41 on 28.Jul.2021 )


1.00 0.00 1.00
(Request date: 03.May.2021 by QUANGTN) (27.Jul.2021) (Ordered by TRONGND)

20.Nov.2021 MEL 31-30-07A , CAT D ADD B0081586-38 : PRINTER INOP DUE TO CONTINOUSLLY PRINT ADD B0081586-38 : PRINTER INOP DUE TO CONTINOUSLLY PRINT IS
A589/WO 604559 99 Day
RAISED REF MEL 31-30-07A CAT D DEADLINE : 20/11/2021 RAISED BY 009AC
(Iss.Date: 23.Jul.2021 )
(Iss.Station: HAN)

27.Nov.2021 B0004060-03 BLACK PAINT ON AFT SIDE OF MANY FAN BLADES OF BOTH B0004060-03 BLACK PAINT ON AFT SIDE OF MANY FAN BLADES OF BOTH
A589/WO 161418 106 Day
ENGINE MISSING ENGINE MISSING REFER AMM 72-21-00-210-802A. DEADLINE ASAP.
(Iss.Date: 25.Oct.2019 )
(Iss.Station: SGN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 27 / 38
ADD B DEFECT LIST 16:36 NHATHC

27.Nov.2021 ADD B063320-04:"FRONT SPINNER OF ENG#2 MISSING WHITE SPIAL ADD B063320-04:"FRONT SPINNER OF ENG#2 MISSING WHITE SPIAL
A589/WO 537526 106 Day
SHAPED MARK SHAPED MARK IS RAISED, REF AMM 72-21-40-210-801A.DEADLINE:ASAP
(Iss.Date: 08.Feb.2021 ) "FRONT SPINNER OF ENG#2 MISSING WHITE SPIAL SHAPED MARK"
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

649-781-845-0 SCREW P0178321 15.Mar.2021 ( Noted by at on )


9.00 0.00 9.00
(Request date: 09.Feb.2021 by DUNGLV) (03.Mar.2021) (Ordered by BATD)

362-039-010-0 SPINNER, FRONT P0178321 15.Mar.2021 ( Noted by BATD at 2:52 on 03.Mar.2021 )


1.00 0.00 1.00 Leadtime 30 days
(Request date: 09.Feb.2021 by DUNGLV) (03.Mar.2021) (Ordered by BATD)

VN-A590 Open Defects = 2


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

10.Aug.2021 MEL 52-30-07A , CAT D ADD B057127-06: AFT CARGO DOOR FULLY OPEN AND LOCK INDICATOR ADD B057127-06: AFT CARGO DOOR FULLY OPEN AND LOCK INDICATOR
A590/WO 562375 -3 Day
LIGHT INOP LIGHT INOP. MEL 52-30-07A. CAT D. DEADLINE 10/08/2021
(Iss.Date: 12.Apr.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

FT84-799-061 PROXIMITY SWITCH P0229721 06.Aug.2021 ( Noted by HOANNV at 8:45 on 24.Jul.2021 )


1.00 0.00 1.00 ALT: E3-6000771 IN STOCK
(Request date: 23.Apr.2021 by HAIPD) (29.Jun.2021) (Ordered by TRUNGPB)

NAS1611-010 PACKING ( Noted by TUANPV at 12:39 on 02.Aug.2021 )


1.00 45.00
(Request date: 02.Aug.2021 by TUANPV)

E20000Z3-1 SENSOR KEY TOOL ( Noted by TRANGNH at 10:16 on 13.Aug.2021 )


1.00 0.00 đang xử lý
(Request date: 09.Aug.2021 by TUANPV)

701C0MS954T SEAL ASSY RING ( Noted by HOANNV at 3:17 on 04.Jun.2021 )


1.00 1.00 REQ 27/05
(Request date: 23.Apr.2021 by HAIPD)

E0070B1-07 LIGHT P0204021 09.Aug.2021 ( Noted by HOANNV at 3:17 on 04.Jun.2021 )


1.00
(Request date: 12.Apr.2021 by DIEPTQ) (19.Apr.2021) (Ordered by KHUONGNM) REQ 27/05

P0198321 08.Apr.2021
5.00
(08.Apr.2021) (Ordered by TRONGND)
1.00 1.00
P0212221 30.May.2021
10.00
(10.May.2021) (Ordered by QUYNHNTD)

P0219621 01.Jun.2021
20.00
(27.May.2021) (Ordered by QUYNHNTD)

20.Nov.2021 MEL 31-30-07A , CAT D ADD B0081256-58 : PRINTER INOP DUE TO CONTINOUSLLY PRINT ADD B0081256-58 : PRINTER INOP DUE TO CONTINOUSLLY PRINT IS
A590/WO 604557 99 Day
RAISED REF MEL 31-30-07A CAT D DEADLINE : 20/11/2021 RAISED BY 009AC
(Iss.Date: 23.Jul.2021 )
(Iss.Station: HAN)

VN-A591 Open Defects = 6


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

29.Aug.2021 MEL 25-20-07A , CAT D ADD B72769-02 "SEAT 24C TABLE BROKEN AND REMOVED" ADD B72769-02 "SEAT 24C TABLE BROKEN AND REMOVED" IS RAISED REF
A591/WO 566601 16 Day
MEL 25-20-07A. CAT D. EXP 29/08/2021 (REV 15/03/2021)
(Iss.Date: 01.May.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 28 / 38
ADD B DEFECT LIST 16:36 NHATHC

16610-0 SLIDER STOP ( Noted by at on )


1.00 11.00
(Request date: 02.May.2021 by DIEPTQ)

P1206 SCREW 8-32X1/4 ( Noted by at on )


1.00 138.00
(Request date: 02.May.2021 by DIEPTQ)

P1183 SCREW 4-40X3/16 ( Noted by at on )


2.00 363.00
(Request date: 02.May.2021 by DIEPTQ)

P9216 GUIDE P0236621 29.Aug.2021 ( Noted by TRANGNH at 16:26 on 09.Aug.2021 )


1.00 0.00 20.00 đang đợi duyệt đơn hàng
(Request date: 02.May.2021 by DIEPTQ) (19.Jul.2021) (Ordered by TRANGNH)

P9124 LOCITE 243 ( Noted by TRANGNH at 16:27 on 09.Aug.2021 )


1.00 0.00 không cần đặt hàng theo yêu cầu của MCC
(Request date: 02.May.2021 by DIEPTQ)

04.Sep.2021 ADD B0018799 BLACK PAINT ON FAN BLADE OF BOTH ENGINE MISSING ADD B0018799 BLACK PAINT ON FAN BLADE OF BOTH ENGINE MISSING
A591/WO 129558 22 Day
ADD B0018799 BLACK PAINT ON FAN BLADE OF BOTH ENGINE MISSING REFER AMM 72-21-00-210-802A. DEADLINE ASAP.
(Iss.Date: 05.Sep.2019 ) REFER AMM 72-21-00-210-802A. DEADLINE ASAP.
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

7777 SCOTCH-BRITE HAND PAD ( Noted by HOANNV at 6:58 on 17.Jul.2020 )


1.00 0.00 CHIDT
(Request date: 12.Sep.2019 by DIEPTQ)

501E-24MM112958 SCOTCH HIGH TEM MASKING TAPE ( Noted by HOANNV at 6:58 on 17.Jul.2020 )
5.00 0.00 CHIDT
(Request date: 12.Sep.2019 by DIEPTQ)

LBYH203NOIRMAT POLYURETHANE COATING. ( Noted by HOANNV at 6:58 on 17.Jul.2020 )


1.00 0.00 CHIDT
(Request date: 12.Sep.2019 by DIEPTQ)

20.Nov.2021 MEL 31-30-07A , CAT D ADD B0124119-43 : PRINTER INOP DUE TO CONTINOUSLLY PRINT ADD B0124119-43 : PRINTER INOP DUE TO CONTINOUSLLY PRINT IS
A591/WO 604558 99 Day
RAISED REF MEL 31-30-07A CAT D DEADLINE : 20/11/2021 RAISED BY 009AC
(Iss.Date: 23.Jul.2021 )
(Iss.Station: HAN)

11.Jan.2023 ADD B0059045-03: 01 LEAD BONDING AT LH + RH NOSE LANDING GEAR ADD B0059045-03 IS RAISED FOR 01 LEAD BONDING AT LH + RH NOSE
A591/WO 517866 516 Day
DOOR DAMAGED (BAV048AC) LANDING GEAR DOOR DAMAGED, REF AMM 24-92-00-210-024, DEADLINE
(Iss.Date: 11.Jan.2021 )
24 MONTH/ 7500FH/ 500FC
(Iss.Station: HAN)

18.Apr.2023 ADD B0059045-03: 01 LEAD BONDING AT LH + RH NOSE LANDING GEAR ADD B0059045-03 IS RAISED FOR 01 LEAD BONDING AT LH + RH NOSE
A591/WO 517866 6670:40 FH
DOOR DAMAGED (BAV048AC) LANDING GEAR DOOR DAMAGED, REF AMM 24-92-00-210-024, DEADLINE
(Iss.Date: 11.Jan.2021 )
24 MONTH/ 7500FH/ 500FC
(Iss.Station: HAN)

08.Aug.2023 ADD B0059045-03: 01 LEAD BONDING AT LH + RH NOSE LANDING GEAR ADD B0059045-03 IS RAISED FOR 01 LEAD BONDING AT LH + RH NOSE
A591/WO 517866 4365 FC
DOOR DAMAGED (BAV048AC) LANDING GEAR DOOR DAMAGED, REF AMM 24-92-00-210-024, DEADLINE
(Iss.Date: 11.Jan.2021 )
24 MONTH/ 7500FH/ 500FC
(Iss.Station: HAN)

VN-A592 Open Defects = 1


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

08.Dec.2021 ADD B053605-04: BLACK PAINT COAT DISBONDING (SOME POINT) ON FAN ADD B053605-04: BLACK PAINT COAT DISBONDING (SOME POINT) ON FAN
A592/WO 583957 117 Day
BLADE 13 ENG 1 BLADE 13 ENG 1. DEADLINE ASAP
(Iss.Date: 11.Jun.2021 )
(Iss.Station: HAN)

VN-A593 Open Defects = 11


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 29 / 38
ADD B DEFECT LIST 16:36 NHATHC

31.Aug.2021 ADD B52113-11 PAINT PEEL OFF ENG#1 LATCH OF FANCOWL ADD B52113-11 PAINT PEEL OFF ENG#1 LATCH OF FANCOWL IAW SRM
A593/WO 568915 18 Day
ADD B52113-11 PAINT PEEL OFF ENG#1 LATCH OF FANCOWL IAW SRM 51-11-00.CAT A.DEADLINE FIRST OPPOTURNITY. (BAV069AC)
(Iss.Date: 05.May.2021 ) 51-11-00.CAT A.DEADLINE FIRST OPPOTURNITY. (BAV069AC)
(Iss.Station: SGN)

31.Aug.2021 ADD B52113-12 PAINT PEEL OFF ENG#2 LATCH OF FANCOWL ADD B52113-12 PAINT PEEL OFF ENG#2 LATCH OF FANCOWL IAW SRM
A593/WO 568911 18 Day
ADD B52113-12 PAINT PEEL OFF ENG#2 LATCH OF FANCOWL IAW SRM 51-11-00.CAT A.DEADLINE FIRST OPPOTURNITY. (BAV069AC)
(Iss.Date: 05.May.2021 ) 51-11-00.CAT A.DEADLINE FIRST OPPOTURNITY. (BAV069AC)
(Iss.Station: SGN)

01.Oct.2021 MEL 25-20-02A , CAT D ADD B124160-04: SEAT 10C RECLINE FUNCTION INOP ADD B124160-04: SEAT 10C RECLINE FUNCTION INOP. MEL 25-20-02A. CAT
A593/WO 582097 49 Day
D.DEADLINE 02OCT2021. SEAT SECURED IN UPRIGHT POSITION
(Iss.Date: 03.Jun.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

888382-402 BEZEL ( Noted by DUONGND at 16:34 on 25.Jun.2021 )


1.00 0.00
(Request date: 05.Jun.2021 by DUONGND)

13.Oct.2021 MEL 23-51-02A , CAT D B0111584-02 TX FOUND THIRD OCCUPANT BOOMSET INOP ADD RAISED RAISED REF MEL 23-51-02A, CAT D, DEADLINE: 13 OCT 2021
A593/WO 584503 61 Day
(Iss.Date: 15.Jun.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

1046GT2102AY BOOMSET ( Noted by TUNGVNA at 21:1 on 17.Jun.2021 )


1.00 0.00
(Request date: 17.Jun.2021 by TUNGVNA)

15.Oct.2021 MEL 25-20-02A , CAT D ADD B111591-04:"SEAT 10A RECLINE INOP" ADD B111591-04:"SEAT 10A RECLINE INOP" IS RAISED,REF MEL:
A593/WO 584925 63 Day
"SEAT 10A RECLINE INOP" 25-20-02A.CAT D.DEADLINE: 15/10/2021 M: SEAT SECURE IN THE UPRIGHT
(Iss.Date: 17.Jun.2021 )
POSITION,
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

888382-401 BENZEL P0230121 14.Oct.2021 ( Noted by KHUONGNM at 7:56 on 07.Jul.2021 )


1.00 0.00 10.00
(Request date: 21.Jun.2021 by TUNGVNA) (30.Jun.2021) (Ordered by KHUONGNM) KHUONGNM: Chờ TTTT; LT: STK sau TT

17.Oct.2021 ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL
A593/WO 568916 735:54 FH
ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL IAW AMM 20-28-00-200-001.CAT A.DEADLINE NEXT CHECK OR 05/11/2021
(Iss.Date: 05.May.2021 ) IAW AMM 20-28-00-200-001.CAT A.DEADLINE NEXT CHECK OR 05/11/2021 OR 4027FH OR 3180FC WHICHEVER COMES FIRST (BAV069AC)
(Iss.Station: SGN) OR 4027FH OR 3180FC WHICHEVER COMES FIRST (BAV069AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D5348027700200 LEAD BONDING ( Noted by at on )


1.00 0.00
(Request date: 12.May.2021 by TUNGVNA)

05.Nov.2021 ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL
A593/WO 568916 84 Day
ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL IAW AMM 20-28-00-200-001.CAT A.DEADLINE NEXT CHECK OR 05/11/2021
(Iss.Date: 05.May.2021 ) IAW AMM 20-28-00-200-001.CAT A.DEADLINE NEXT CHECK OR 05/11/2021 OR 4027FH OR 3180FC WHICHEVER COMES FIRST (BAV069AC)
(Iss.Station: SGN) OR 4027FH OR 3180FC WHICHEVER COMES FIRST (BAV069AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D5348027700200 LEAD BONDING ( Noted by at on )


1.00 0.00
(Request date: 12.May.2021 by TUNGVNA)

06.Nov.2021 B52118-03 TERM CHECK FOUND LEAD BONDING OF PANEL 192MB REFUEL ADD RAISED REF AMM 20-28-00-200-001. DEADLINE NEXT CHECK OR
A593/WO 569071 85 Day
PANEL DAMAGED 06/11/21 OR 4031 FH OR 3184FC
(Iss.Date: 06.May.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 30 / 38
ADD B DEFECT LIST 16:36 NHATHC

E0092-10-200NN LEAD BONDING ( Noted by QUANGTN at 10:36 on 10.Aug.2021 )


1.00 1.00
(Request date: 12.May.2021 by TUNGVNA)

21.Dec.2021 ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL
A593/WO 568916 793 FC
ADD B52113-01 LEADING BONDING BROKEN AT WATER SERVICE PANEL IAW AMM 20-28-00-200-001.CAT A.DEADLINE NEXT CHECK OR 05/11/2021
(Iss.Date: 05.May.2021 ) IAW AMM 20-28-00-200-001.CAT A.DEADLINE NEXT CHECK OR 05/11/2021 OR 4027FH OR 3180FC WHICHEVER COMES FIRST (BAV069AC)
(Iss.Station: SGN) OR 4027FH OR 3180FC WHICHEVER COMES FIRST (BAV069AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D5348027700200 LEAD BONDING ( Noted by at on )


1.00 0.00
(Request date: 12.May.2021 by TUNGVNA)

25.Jul.2022 B52118-03 TERM CHECK FOUND LEAD BONDING OF PANEL 192MB REFUEL ADD RAISED REF AMM 20-28-00-200-001. DEADLINE NEXT CHECK OR
A593/WO 569071 3770:48 FH
PANEL DAMAGED 06/11/21 OR 4031 FH OR 3184FC
(Iss.Date: 06.May.2021 )
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-200NN LEAD BONDING ( Noted by QUANGTN at 10:36 on 10.Aug.2021 )


1.00 1.00
(Request date: 12.May.2021 by TUNGVNA)

20.Dec.2022 B52118-03 TERM CHECK FOUND LEAD BONDING OF PANEL 192MB REFUEL ADD RAISED REF AMM 20-28-00-200-001. DEADLINE NEXT CHECK OR
A593/WO 569071 2981 FC
PANEL DAMAGED 06/11/21 OR 4031 FH OR 3184FC
(Iss.Date: 06.May.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E0092-10-200NN LEAD BONDING ( Noted by QUANGTN at 10:36 on 10.Aug.2021 )


1.00 1.00
(Request date: 12.May.2021 by TUNGVNA)

VN-A594 Open Defects = 11


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

12.Aug.2021 ADD B117725-10:ENG#1 DOOR OPENNING ACTUATOR FLEXIBLE COOLING ADD B117725-10:ENG#1 DOOR OPENNING ACTUATOR FLEXIBLE COOLING
A594/WO 580725 -1 Day
HOSE WORN HOSE WORN IS RAISED,REF AMM: 78-51-210-041-A.DEADLINE: ASAP
(Iss.Date: 08.May.2021 ) ENG#1 DOOR OPENNING ACTUATOR FLEXIBLE COOLING HOSE WORN
(Iss.Station: SGN) (NOTE: WO COPY OF WO CLOSED 575`862 WRONGLY)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

ALL488-101-0 HOSE ( Noted by CHINHND at 1:57 on 29.Jun.2021 )


1.00 0.00
(Request date: 28.May.2021 by TUNGVNA)

29.Aug.2021 MEL 25-20-01A , CAT D ADD B117771-02 "SEAT 1C INOP DUE TO RECLINE FUNCTION INOP" ADD B117771-02 "SEAT 1C INOP DUE TO RECLINE FUNCTION INOP" IS
A594/WO 566600 16 Day
RAISED REF MEL 25-20-01A CAT D, EXP 29/8/2021. REV 15/06/2021
(Iss.Date: 01.May.2021 )
(Iss.Station: HAN)

WorkOrder Remarks

Updated by KHUONGTT at 02.May.2021 : SEAT DO NOT OCCUPY


Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

GS2301-2 LOCK ( Noted by TRANGNH at 3:18 on 03.Jun.2021 )


1.00 0.00 đã đặt hàng ALT PN: VE-GS2301-2 theo P0221921
(Request date: 02.May.2021 by DIEPTQ)

08.Oct.2021 B0057634-08 NRC#17 471AR PYLON #1, AERODYNAMIC SEAL DAMAGED ADD RAISED REF MCDL 54-06. DE-ACTIVATE AERODYNAMIC SEAL IAW
A594/WO 563488 56 Day
AMM 54-33-00-04-001A, CHECK HI-SPEED TAPE CONDITION EACH DAILY
(Iss.Date: 11.Apr.2021 )
CHECK P/N REQ: D0003014100000
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 31 / 38
ADD B DEFECT LIST 16:36 NHATHC

D0003014100000 SEAL P0234421 05.Oct.2021 ( Noted by TRANGNH at 16:28 on 09.Aug.2021 )


1.00 0.00 2.00 đang đợi duyệt đơn hàng
(Request date: 24.Apr.2021 by CHINHND) (13.Jul.2021) (Ordered by TRANGNH)

08.Oct.2021 B0057635-10 NRC#15 ENG #1 T/R COWL EXIT HEATSHIELD TRAILING EDGE REF AMM 78-32-11-220-040-B GAP PERMITTED WITH LESS THAN 4MM.
A594/WO 563490 56 Day
GAP/ BULGES MAX OF 3MM AT 11`OCLOCK POS CHECK DAMAGE/ GAP EACH WEEKLY. DUE AT GAP REACH 4MM/ CRACK
(Iss.Date: 11.Apr.2021 )
ON GAP
(Iss.Station: SGN)

08.Oct.2021 B0057635-12 NRC#10 ENG #1 AIR INTAKE COWL OUTER SKIN/ OUTER C/O EVALUATION FOUND PAINT MISSING ON FASTENER ONLY (NO
A594/WO 563492 56 Day
BARREL SKIN L/E WITH PAINT DAMAGED EXPOSING FASTENERS CORROSION). ADD RAISED REF SRM 51-11-00 P.2 B.3
(Iss.Date: 11.Apr.2021 )
(Iss.Station: SGN)

08.Oct.2021 B0057635-11 NRC#13 VERTICAL STAB L/E FOUND PAINT PEELED OFF REF SRM 51-11-00 FOUND COMPOSITE EXPOSED. ADD RAISED REF SRM
A594/WO 563491 56 Day
51-11-00 P.2 B.4. TEMP PROTECTION APPLIED IAW SRM 51-77-12-911-001
(Iss.Date: 11.Apr.2021 )
CHECK TEMP PROTECTION TAPE EACH WEEKLY
(Iss.Station: SGN)

14.Nov.2021 B0057638-19 NRC#29 ENG#2 ANTI ICE DUCT AIR GAP INSULATION C/O TEMP REPAIR IAW EO-A321-30-0002. ADD RAISED FOR REQ INSPECT
A594/WO 563497 571 FC
DAMAGED EACH 750 FC
(Iss.Date: 13.Apr.2021 )
(Iss.Station: SGN)

18.Nov.2021 ADD B117747-44: ENG 2 EXIT HEATSHIELD GAP AT 9 OCLOCK AND 15 ADD B117747-44: ENG 2 EXIT HEATSHIELD GAP AT 9 OCLOCK AND 15
A594/WO 579548 97 Day
OCLOCK MAX 2MM. OCLOCK MAX 2MM. REF AMM 78-32-11-220-040B. DEADLINE ASAP. RE
(Iss.Date: 22.May.2021 )
INSPECT AT EVERY WEEKLY CHECK
(Iss.Station: HAN)

12.Apr.2023 B0057636-15 NRC#09 BONDING LEAD AT RH ELEV SPAR BOX TO HINGE ADD RAISED REF AMM 24-92-00-210-024A P/N REQ: E0092-40-220NN
A594/WO 563495 607 Day
ARM NO.04 DAMAGED
(Iss.Date: 11.Apr.2021 )
(Iss.Station: SGN)

25.Apr.2023 B0057636-15 NRC#09 BONDING LEAD AT RH ELEV SPAR BOX TO HINGE ADD RAISED REF AMM 24-92-00-210-024A P/N REQ: E0092-40-220NN
A594/WO 563495 6739:0 FH
ARM NO.04 DAMAGED
(Iss.Date: 11.Apr.2021 )
(Iss.Station: SGN)

23.Oct.2023 B0057636-15 NRC#09 BONDING LEAD AT RH ELEV SPAR BOX TO HINGE ADD RAISED REF AMM 24-92-00-210-024A P/N REQ: E0092-40-220NN
A594/WO 563495 4821 FC
ARM NO.04 DAMAGED
(Iss.Date: 11.Apr.2021 )
(Iss.Station: SGN)

VN-A595 Open Defects = 8


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

16.Aug.2021 MEL 34-30-04b , CAT C ADD B0080681-83: ILS 2 FAULT ADD B0080681-83 WAS RAISED FOR ILS 2 FAULT
A595/WO 606828 3 Day
(Iss.Date: 06.Aug.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

TLS755-01-0102A MMR - MULTIMODE RECEIVER PR0090221 16.Aug.2021 ( Noted by TRANGNH at 10:30 on 13.Aug.2021 )
1.00 0.00 1.00 dự kiến 17/8
(Request date: 07.Aug.2021 by CHINHND) (09.Aug.2021) (Ordered by TRONGND)

04.Sep.2021 MEL 23-73-04-01A , CAT D B0052020-06: 03 PAX CALL P/B AT 16 ABC 22ABC INOP B0052020-06: 03 PAX CALL P/B AT 16 ABC 22ABC INOP ; MEL 23-73-04-01A
A595/WO 569113 22 Day
CAT D EXP 04/09/21
(Iss.Date: 07.May.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

9MK619321-00 SWITCH-CALL P0221121 04.Sep.2021 ( Noted by at on )


4.00 0.00 4.00
(Request date: 09.May.2021 by HAIPD) (01.Jun.2021) (Ordered by TRANGNH)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 32 / 38
ADD B DEFECT LIST 16:36 NHATHC

05.Oct.2021 CDL 54-06 ADD B0056790-05: ENG 1 AERODYNAMIC SEAL DAMAGE ADD B0056790-05: ENG 1 AERODYNAMIC SEAL DAMAGE. REF CDL 54-06
A595/WO 561363 53 Day
REV30/NOV2021. DEADLINE ASAP. DEACTIVATED SEAL IAW AMM
(Iss.Date: 08.Apr.2021 )
54-53-00-040-001A REV FEB2021. NEW OPM OPEN
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D0003014100000 SEAL P0234421 05.Oct.2021 ( Noted by TRANGNH at 16:29 on 09.Aug.2021 )


1.00 0.00 2.00 đang đợi duyệt đơn hàng
(Request date: 09.Apr.2021 by QUANGTN) (13.Jul.2021) (Ordered by TRANGNH)

05.Oct.2021 ADD B0056790-04: ENG #1 PAINT PEEL OFF AT RH C DUCT AND LH FAN ADD B0056790-04: ENG #1 PAINT PEEL OFF AT RH C DUCT AND LH FAN
A595/WO 561362 53 Day
COWL. COWL. REF SRM 51-11-00 REV01FEB2021. DEADLINE ASAP
(Iss.Date: 08.Apr.2021 )
(Iss.Station: HAN)

03.Dec.2021 MEL 49-10-01C , CAT D ADD B80680-79 : APU AUTO SHUTDOWN ADD B80680-79 : APU AUTO SHUTDOWN IAW MEL 49-10-01C.CAT
A595/WO 606654 112 Day
ADD B80680-79 : APU AUTO SHUTDOWN IAW MEL 49-10-01C.CAT D.DEADLINE 03-11-2021 THIS IS REPETITIVE DEFECT OPS : NEED FULLY
(Iss.Date: 05.Aug.2021 ) D.DEADLINE 03-11-2021 THIS IS REPETITIVE DEFECT OPS : NEED FULLY GROUND CART (GPU,ACU,ASU) (BAV 069AC)
(Iss.Station: SGN) GROUND CART (GPU,ACU,ASU) (BAV 069AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

4500039F PUMP AY FUEL CONTROL ( Noted by DUONGND at 9:40 on 07.Aug.2021 )


1.00 0.00
(Request date: 07.Aug.2021 by DUONGND)

06.Jan.2023 ADD B0065299-07: 01 LEAD BONDING AT LH NOSE LDG DOOR DAMAGED ADD B0065299-07: 01 LEAD BONDING AT LH NOSE LDG DOOR DAMAGED.
A595/WO 516850 511 Day
REF AMM 24-92-00-210-024A. REV 01NOV2020. INTERVAL 24MO; 7500FH,
(Iss.Date: 06.Jan.2021 )
5000FC. DEADLINE 06/01/2023. FH 59120:41; FC 33517
(Iss.Station: HAN)

19.Apr.2023 ADD B0065299-07: 01 LEAD BONDING AT LH NOSE LDG DOOR DAMAGED ADD B0065299-07: 01 LEAD BONDING AT LH NOSE LDG DOOR DAMAGED.
A595/WO 516850 6675:55 FH
REF AMM 24-92-00-210-024A. REV 01NOV2020. INTERVAL 24MO; 7500FH,
(Iss.Date: 06.Jan.2021 )
5000FC. DEADLINE 06/01/2023. FH 59120:41; FC 33517
(Iss.Station: HAN)

31.Jul.2023 ADD B0065299-07: 01 LEAD BONDING AT LH NOSE LDG DOOR DAMAGED ADD B0065299-07: 01 LEAD BONDING AT LH NOSE LDG DOOR DAMAGED.
A595/WO 516850 4316 FC
REF AMM 24-92-00-210-024A. REV 01NOV2020. INTERVAL 24MO; 7500FH,
(Iss.Date: 06.Jan.2021 )
5000FC. DEADLINE 06/01/2023. FH 59120:41; FC 33517
(Iss.Station: HAN)

VN-A596 Open Defects = 8


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

27.Jul.2021 MEL 32-09-02a , CAT D B0064469-10 RAISED FOR M/W#3 TIRE PRESSURE TRANSDUCER REMOVED B0064469-10 RAISED FOR M/W#3 TIRE PRESSURE TRANSDUCER REMOVED
A596/WO 548691 -17 Day
DUE TO M/W #3 REPLACEMENT DUE TO M/W #3 REPLACEMENT, MEL 32-09-02A, CAT D, DEADLINE
(Iss.Date: 29.Mar.2021 )
26/07/2021, "M" PRO APPLIED.
(Iss.Station: HAN)

27.Jul.2021 MEL 32-09-02A , CAT D B0064469-09 RAISED FOR M/W#1 TIRE PRESSURE TRANSDUCER REMOVED B0064469-09 RAISED FOR M/W#1 TIRE PRESSURE TRANSDUCER REMOVED
A596/WO 548685 -17 Day
DUE TO M/W #1 REPLACEMENT DUE TO M/W #1 REPLACEMENT, MEL 32-09-02A, CAT D, DEADLINE
(Iss.Date: 29.Mar.2021 )
26/07/2021, "M" PRO APPLIED.
(Iss.Station: HAN)

29.Jul.2021 MEL 23-40-01A , CAT C ADD B0081436-09: EXTENAL HORN INOP ADD B0081436-09: EXTENAL HORN INOP IS RAISED REF MEL 23-40-01A CAT
A596/WO 601340 -15 Day
(Concession) C DEADLINE : 22/07/2021 RAISED BY 019AC
(Iss.Date: 12.Jul.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

NSA936830-16 SPLICE P0236121 01.Aug.2021 ( Noted by TRANGNH at 10:29 on 13.Aug.2021 )


2.00 0.00 2.00 đã đi thuế, đang đợi giao hàng
(Request date: 12.Jul.2021 by NHATHC) (16.Jul.2021) (Ordered by QUYNHNTD)

EN3155-016M1616 CONTACT ( Noted by DUNGLV at 5:40 on 12.Aug.2021 )


2.00 30.00
(Request date: 12.Aug.2021 by DUNGLV)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 33 / 38
ADD B DEFECT LIST 16:36 NHATHC

D0003004300000 HORN ( Noted by TRUNGPB at 11:7 on 09.Aug.2021 )


1.00 1.00
(Request date: 12.Jul.2021 by NHATHC)

30.Jul.2021 MEL 31-30-07 , CAT D B0055137-02: PRINTER INOP B0055137-02: PRINTER INOP; MEL 31-30-07 CAT D EXP 30/07/21
A596/WO 550083 -14 Day
(Iss.Date: 01.Apr.2021 )
(Iss.Station: SGN)

28.Aug.2021 MEL 32-09-02A , CAT D ADD B097255-09:"TPIS OF MW#4 SHOW XXX" ADD B097255-09:"TPIS OF MW#4 SHOW XXX" IS RAISED,REF MEL:
A596/WO 566520 15 Day
"TPIS OF MW#4 SHOW XXX DUE TO PRESSURE TRANSDUCER REMOVED" 32-09-02A.CAT D.DEADLINE: 28/08/21 (M): THE TIRE PRESSURE ON THE
(Iss.Date: 30.Apr.2021 ) AFFECTED WHEEL IS CHECKED TO BE WITHIN THE LIMITS BEFORE THE
(Iss.Station: SGN) FIRST MEL DISPATCH AND THEN EVERY THREE DAYS.

29.Aug.2021 CDL 78-33 ADD B004845-04: LOWER BEAVER TAIL FAIRING OF ENG 2 RH T/R ADD B004845-04: LOWER BEAVER TAIL FAIRING OF ENG 2 RH T/R
A596/WO 442941 16 Day
REMOVED REMOVED. REF CDL78-33. DEADLINE ASAP
(Iss.Date: 03.Aug.2020 )
(Iss.Station: SGN)
WorkOrder Remarks

Updated by DIEPTQ at 15.Sep.2020 : PERFORMANCE:


Updated by DIEPTQ at 15.Sep.2020 : THE FOLLOWING PERFORMANCE PENALTIES ARE APPLICABLE PER ENGINE
Updated by DIEPTQ at 15.Sep.2020 : - TAKEOFF PERFORMANCE LIMITTING WEIGHT IS REDUCED BY 664KG FOR ONE
Updated by DIEPTQ at 15.Sep.2020 : OR BOTH BEAVER TAIL FAIRING MISSING
Updated by DIEPTQ at 15.Sep.2020 : - APPROACH CLIMB LIMITTING WEIGHT IS REDUCED BY 332 KG FOR ONE OR
Updated by DIEPTQ at 15.Sep.2020 : BOTH BEAVER TAIL FAIRING MISSING
Updated by DIEPTQ at 15.Sep.2020 : - EN ROUTE PERFORMANCE LIMITTING WEIGHT IS REDUCED BY 990 KG ONE OR
Updated by DIEPTQ at 15.Sep.2020 : BOTH BEAVER TAIL FAIRING MISSING
Updated by DIEPTQ at 15.Sep.2020 : - FUEL CONSUMPTION IS INCREASED BY 1.6% FOR ONE OR BOTH BEAVER TAIL
Updated by DIEPTQ at 15.Sep.2020 : FAIRING MISSING
30.Aug.2021 ADD B124321-08:"01 OUTER OGV FLATFORM OF ENG#1 AT 11 O`CLOCK ADD B124321-08:"01 OUTER OGV FLATFORM OF ENG#1 AT 11 O`CLOCK
A596/WO 584918 115 FC
MISSING" MISSING" IS RAISED,REF AMM: 72-24-11-210-801A REV 05/2021.DEADLINE:
(Iss.Date: 17.Jun.2021 ) "01 OUTER OGV FLATFORM OF ENG#1 AT POS #11 O`CLOCK MISSING" 2496 FC, CURRENT FC ON TECHLOG: 2346
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

362-095-707-0 PLATFORM OGV P0231421 12.Jul.2021 ( Noted by DUONGND at 19:28 on 17.Jun.2021 )


1.00
(Request date: 17.Jun.2021 by DUONGND) (05.Jul.2021) (Ordered by QUYNHNTD)
1.00 0.00
P0238021 23.Aug.2021
2.00
(23.Jul.2021) (Ordered by QUYNHNTD)

24.Oct.2021 MEL 35-30-01A , CAT D ADD B81413-04 "REMOVED 02 PROTABLE OXYGEN AT AFT CABIN" ADD B81413-04 "REMOVED 02 PROTABLE OXYGEN AT AFT CABIN" IS
A596/WO 586718 72 Day
RAISED, CAT D, DEADLINE 24/10/2021 REF MEL 35-30-01A REV25JUN2021
(Iss.Date: 26.Jun.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

174097-11 MASK P0245421 27.Sep.2021 ( Noted by DUNGLV at 2:13 on 27.Jun.2021 )


2.00 0.00 2.00
(Request date: 27.Jun.2021 by DUNGLV) (13.Aug.2021) (Ordered by TRUNGPB)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 34 / 38
ADD B DEFECT LIST 16:36 NHATHC

AV2014595-11 PORTABLE OXYGEN CYLINDER ASSY R0390721 20.Aug.2021 ( Noted by DUNGLV at 2:13 on 27.Jun.2021 )
2.00 0.00 1.00
(Request date: 27.Jun.2021 by DUNGLV) (17.Jul.2021) (Ordered by PHUNP)

VN-A597 Open Defects = 10


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

26.Aug.2021 MEL 52-30-07A , CAT D ADD B0072869-03: AFT CARGO DOOR FULLY OPEN INDICATOR LIGHT INOP ADD B0072869-03: AFT CARGO DOOR FULLY OPEN INDICATOR LIGHT
A597/WO 566205 13 Day
INOP. MEL 52-30-07A. CAT D. DEADLINE 28AUG2021
(Iss.Date: 28.Apr.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D9259024320000 SEAL P0221721 26.Aug.2021 ( Noted by TRANGNH at 16:11 on 09.Aug.2021 )


(Request date: 28.Apr.2021 by DIEPTQ) (02.Jun.2021)
1.00 đã đặt hàng P0221721, đang đợi thanh toán trả trước
(Ordered by TRANGNH)

1.00 0.00 P0124020 10.Oct.2020


(29.Sep.2020)
3.00
(Ordered by HOANNV)

P0219621 01.Jun.2021
20.00
(27.May.2021) (Ordered by QUYNHNTD)

06AAA1 POLYSULFIDE SEALANT-GENERAL PURPOSE P0243321 22.Oct.2022 ( Noted by at on )


1.00 0.00 10.00
(Request date: 28.Apr.2021 by DIEPTQ) (02.Aug.2021) (Ordered by KHUONGNM)

A9239559320400 SEALING P0212121 30.May.2021 ( Noted by at on )


2.00
(Request date: 28.Apr.2021 by DIEPTQ) (10.May.2021) (Ordered by QUYNHNTD)
1.00 30.00
P0124020 10.Oct.2020
3.00
(29.Sep.2020) (Ordered by HOANNV)

E0070B1-07 LIGHT P0204021 09.Aug.2021 ( Noted by at on )


1.00
(Request date: 28.Apr.2021 by DIEPTQ) (19.Apr.2021) (Ordered by KHUONGNM)

P0198321 08.Apr.2021
(08.Apr.2021)
5.00
(Ordered by TRONGND)
1.00 1.00
P0212221 30.May.2021
(10.May.2021)
10.00
(Ordered by QUYNHNTD)

P0219621 01.Jun.2021
(27.May.2021)
20.00
(Ordered by QUYNHNTD)

06AAC1 POLYSULFIDE SEALANT ( Noted by at on )


1.00 0.00
(Request date: 28.Apr.2021 by DIEPTQ)

16.Sep.2021 CDL 54-06 B69573-02 AERODYNAMIC SEAL LH DAMAGED AERODYNAMIC SEAL OF THE LH PYLON IS REMOVED AND TEMP CLOSED
A597/WO 546619 34 Day
WITH HSPT IAW AMM 54-53-00-040-001A. ADD RAISED REF CDL 54-06.
(Iss.Date: 20.Mar.2021 )
DEADLINE: ASAP
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

D0003014100000 SEAL P0234421 05.Oct.2021 ( Noted by TRANGNH at 16:30 on 09.Aug.2021 )


1.00 0.00 2.00 đang đợi duyệt đơn hàng
(Request date: 22.Mar.2021 by HAIPD) (13.Jul.2021) (Ordered by TRANGNH)

23.Oct.2021 MEL 35-30-03A , CAT D ADD B124784-2 : FWD CABIN ATTENDANT PBE INOP ADD B124784-2 : FWD CABIN ATTENDANT PBE INOP IAW MEL
A597/WO 586502 71 Day
ADD B124784-2 : FWD CABIN ATTENDANT PBE INOP IAW MEL 35-30-03A.CAT D.DEADLINE 23-10-21 NOTE : PBE REMOVED AND SEND TO
(Iss.Date: 25.Jun.2021 ) 35-30-03A.CAT D.DEADLINE 23-10-21 NOTE : PBE REMOVED AND SEND TO STORE. (BAV034AC)
(Iss.Station: HAN) STORE. (BAV034AC)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

E28180-20-0006 PROTECT. BREATHING EQPT (PBE) ( Noted by KHUONGNM at 8:16 on 22.Jul.2021 )


1.00 0.00 KHUONGNM: LT: 1-2D; chưa thanh toán trả trước (22/7)
(Request date: 25.Jun.2021 by KHUONGTT)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 35 / 38
ADD B DEFECT LIST 16:36 NHATHC

27.Nov.2021 ADD B11717-06:"CAPT SLIDING WINDOW IS MICRO FLAKES" ADD B11717-06:"CAPT SLIDING WINDOW IS MICRO FLAKES" REF
A597/WO 282663 106 Day
"CAPT SLIDING WINDOW IS MICRO FLAKES" AMM:56-12-11-200-001-A.DEADLINE:ASAP NOTE: INTERVAL INSPECT :
(Iss.Date: 22.Jan.2020 )
08DAYS (OPM OPEN)
(Iss.Station: HAN)

27.Nov.2021 B0013673-01 FIRST OFFICER WINDOW HAS MICRO FLAKE B0013673-01 FIRST OFFICER WINDOW HAS MICRO FLAKE . NOTE: INTERVAL
A597/WO 280727 106 Day
B0013673-01 FIRST OFFICER WINDOW HAS MICRO FLAKE INSPECT: 08 DAYS DEADLINE: ASAP
(Iss.Date: 31.Jan.2020 )
(Iss.Station: HAN)

10.Dec.2021 ADD B0056254-07:"AREA AROUND RH FIX WINDOWN NEED TO PAINT" ADD B0056254-07:"AREA AROUND RH FIX WINDOWN NEED TO PAINT" IS
A597/WO 562930 119 Day
"AREA AROUND RH FIX WINDOWN NEED TO PAINT" RAISED,REF SRM:53-11-00.DEADLINE ASAP
(Iss.Date: 14.Apr.2021 )
(Iss.Station: SGN)

24.Feb.2023 ADD B669935-04: 01 LEAD BONDING AT RH AND 01 LEAD BONDING AT LH ADD B669935-04 IS RAISED FOR 01 LEAD BONDING AT RH AND 01 LEAD
A597/WO 541874 560 Day
NLG DOOR DAMAGED (LESS THAN 25%) (BAV052AC) BONDING AT LH NLG DOOR DAMAGED (LESS THAN 25%), AMM
(Iss.Date: 24.Feb.2021 )
24-92-00-210-024, DEADLINE 24MO, 7500FH, 500FC
(Iss.Station: SGN)

26.Apr.2023 ADD B669935-04: 01 LEAD BONDING AT RH AND 01 LEAD BONDING AT LH ADD B669935-04 IS RAISED FOR 01 LEAD BONDING AT RH AND 01 LEAD
A597/WO 541874 6752:1 FH
NLG DOOR DAMAGED (LESS THAN 25%) (BAV052AC) BONDING AT LH NLG DOOR DAMAGED (LESS THAN 25%), AMM
(Iss.Date: 24.Feb.2021 )
24-92-00-210-024, DEADLINE 24MO, 7500FH, 500FC
(Iss.Station: SGN)

29.Aug.2023 ADD B669935-04: 01 LEAD BONDING AT RH AND 01 LEAD BONDING AT LH ADD B669935-04 IS RAISED FOR 01 LEAD BONDING AT RH AND 01 LEAD
A597/WO 541874 4490 FC
NLG DOOR DAMAGED (LESS THAN 25%) (BAV052AC) BONDING AT LH NLG DOOR DAMAGED (LESS THAN 25%), AMM
(Iss.Date: 24.Feb.2021 )
24-92-00-210-024, DEADLINE 24MO, 7500FH, 500FC
(Iss.Station: SGN)

14.Jun.2048 B0038300-14 FOUND NICK ON SKIN BTW STR 19L-20L, FR 69-70 ADD RAISED. INSPECTION GVI INTERVAL 60000 FC REF SRM
A597/WO 462333 58827 FC
53-41-11-205-084
(Iss.Date: 16.Oct.2020 )
(Iss.Station: SGN)

VN-A598 Open Defects = 2


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

03.Nov.2021 MEL 31-30-07A , CAT D B0124235-02: PRINTER INOP (PRINT CONTINOUSLY) B0124235-02: PRINTER INOP (PRINT CONTINOUSLY); MEL 31-30-07A CAT D
A598/WO 599734 82 Day
EXP 03/11/21
(Iss.Date: 06.Jul.2021 )
(Iss.Station: HAN)

14.Nov.2021 ADD B073393-4 : TEMP REPAR OF LIGHTNING STRIKE TR ENG#2 ADD B073393-4 : TEMP REPAR OF LIGHTNING STRIKE DAMAGED ON THE
A598/WO 566422 575 FC
ADD B073393-4 : TEMP REPAR OF LIGHTNING STRIKE DAMAGED ON THE TRANSCOWL AFT EDGE OF THRUST RESERVER ENG#2 REF RDAS
TRANSCOWL AFT EDGE OF THRUST RESERVER ENG#2 REF RDAS DOA-ACL/00272/21/A WITHIN 750FC HI SPEED TAPE APPLIED.CHECK
(Iss.Date: 30.Apr.2021 ) DOA-ACL/00272/21/A WITHIN 750FC HI SPEED TAPE APPLIED.CHECK EVERY 10FC DEADLINE 2653FC.
(Iss.Station: SGN) EVERY 10FC DEADLINE 2653FC.

VN-A599 Open Defects = 5


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

23.Aug.2021 MEL 22-70-02C , CAT A ADD B0124985-73: NAV DATABASE OUT OF DATE ADD B0124985-73: NAV DATABASE OUT OF DATE. MEL 22-70-02C. CAT A.
A599/WO 610730 10 Day
DEADLINE 23AUG2021. OPS PRO REQUIRED
(Iss.Date: 13.Aug.2021 )
(Iss.Station: HAN)

31.Aug.2021 ADD B0081819-02: PAINT PEELING OFF AT AVIONIC DOOR 822 (FR12-14) ADD B0081819-02: PAINT PEELING OFF AT AVIONIC DOOR 822 (FR12-14)
A599/WO 594661 18 Day
LEADING EDLE LEADING EDLE IS RAISED REF SRM 51-11-00 DEADLINE : CONVENIENT
(Iss.Date: 03.Jul.2021 )
OPPORTUNITY
(Iss.Station: HAN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 36 / 38
ADD B DEFECT LIST 16:36 NHATHC

01.Sep.2021 ADD B00124490-05: PLACARD: LATCH L4-2. AT ENG 2 T/R IS TEAR ADD B00124490-05: PLACARD: LATCH L4-2. AT ENG 2 T/R IS TEAR. REF LMM
A599/WO 582075 19 Day
(Concession) 2.5.8 TYPE 2. DEADLINE 03JULY2021
(Iss.Date: 03.Jun.2021 )
(Iss.Station: HAN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

BDL5527-02-0 PLACARD P0243421 15.Aug.2021 ( Noted by TRUNGPB at 12:5 on 09.Aug.2021 )


1.00 0.00 10.00 đối tác chuẩn bị hàng, lead-time: 7 ngày 9 Aug: đợi MCC confirm artwork
(Request date: 05.Jun.2021 by DUONGND) (02.Aug.2021) (Ordered by BATD)

07.Oct.2021 MEL 32-07-07A , CAT D B0081674-07: RH NW PRESS SHOW "XX" ON ECAM B0081674-07: RH NW PRESS SHOW "XX" ON ECAM; MEL 32-07-07A CAT D
A599/WO 583271 55 Day
EXP 07/10/21
(Iss.Date: 09.Jun.2021 )
(Iss.Station: HAN)

08.Oct.2021 MEL 31-30-07A , CAT D ADD B81677-16: PRINTER INOP (DUE TO CONTINUOUSLY PRINTING) ADD B81677-16: PRINTER INOP (DUE TO CONTINUOUSLY PRINTING). MEL
A599/WO 583702 56 Day
31-30-07A. CAT D. DEADLINE 08OCT2021
(Iss.Date: 10.Jun.2021 )
(Iss.Station: HAN)

VN-A818 Open Defects = 4


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

14.Aug.2021 MEL 21-52-12-01 , CAT C ADD B080271-45: RAM FAN L INOP ADD B080271-45: RAM FAN L INOP IS RAISED REF MEL 21-52-12-01 CAT C
A818/WO 606522 1 Day
DEADLINE : 14/08/2021 RAISED BY 102AC
(Iss.Date: 04.Aug.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

7110136H02 FAN ASSY - RAM AIR PR0090421 23.Aug.2021 ( Noted by NHATHC at 5:9 on 04.Aug.2021 )
(Request date: 04.Aug.2021 by NHATHC) (13.Aug.2021)
1.00
(Ordered by BATD)
1.00 0.00
PR0090021 20.Aug.2021
(07.Aug.2021)
1.00
(Ordered by BATD)

08.Sep.2021 ADD B0081056-07: MONITOR TEMPORARY REPAIR FOR 04 DAMAGE ON T/R ADD B0081056-07: MONITOR TEMPORARY REPAIR FOR 04 DAMAGE ON T/R
A818/WO 586807 169 FC
TRANSLATING SLEEVE ACOUSTIC PANEL OF LH ENG DUE TO LIGHTING TRANSLATING SLEEVE ACOUSTIC PANEL OF LH ENG DUE TO LIGHTING
STRIKE. INTERVAL 200FC. DEADLINE 1854FC DAMAGE 1 L W D: 23 20 0.4 STRIKE. INTERVAL 200FC. DEADLINE 1854FC DAMAGE 1 L W D: 23 20 0.4
(Iss.Date: 27.Jun.2021 ) MM DAMAGE 2 L W D: 44 X20 X0.59 MM DAMAGE 3 L W D: 42 20 2.05 MM MM DAMAGE 2 L W D: 44 X20 X0.59 MM DAMAGE 3 L W D: 42 20 2.05 MM
(Iss.Station: HAN) DAMAGE 4 L W D: 35 20 1.3 MM DAMAGE 4 L W D: 35 20 1.3 MM
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note
AVIOX FINISH
AVIOX FINISH 77702-G20423 1LT BLUE BAC 50131 1LT/CAN P0162121 22.Feb.2021 ( Noted by DUNGLV at 3:27 on 01.Jul.2021 )
5.00
(Request date: 01.Jul.2021 by DUNGLV) (18.Jan.2021) (Ordered by HOANNV)
1.00 0.00
P0233321 09.Jul.2021
(09.Jul.2021)
10.00
(Ordered by TRONGND)

MEK NON AQUEOUS CLEANER-GENERAL ( Noted by DUNGLV at 3:27 on 01.Jul.2021 )


1.00 0.00
(Request date: 01.Jul.2021 by DUNGLV)

BMS10-103 TY1 PRIMER BASE + ACTIVATOR ( Noted by DUNGLV at 3:27 on 01.Jul.2021 )


1.00 1.00 PRIMER BASE (512x310)+PRIMER ACTIVATOR (910x533)
(Request date: 01.Jul.2021 by DUNGLV)

11.Dec.2021 MEL 25-64-03-03B , CAT D ADD B0080282-73: FAK AT DOOR 2L OUT OF DATE ADD B0080282-73: FAK AT DOOR 2L OUT OF DATE. MEL 25-64-03-03B. CAT D.
A818/WO 610702 120 Day
DEADLINE 11DEC2021
(Iss.Date: 13.Aug.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

S6-01-0005-312 FAK P0154320 30.Dec.2020 ( Noted by DIEPTQ at 7:19 on 13.Aug.2021 )


1.00 1.00 100.00
(Request date: 13.Aug.2021 by DIEPTQ) (30.Dec.2020) (Ordered by TUANLA)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 37 / 38
ADD B DEFECT LIST 16:36 NHATHC

03.Jun.2023 ADD B0081083-4: MULTI POINT IN LH INLET COWL, LH FAN COWL, LH TR ADD B0081083-4 IS RAISED FOR MULTI POINT IN LH INLET COWL, LH FAN
A818/WO 599759 3969 FC
(36 POINTS) DAMAGED (INSPECTIO HST INTERVAL 400FC) COWL, LH TR (36 POINTS) DAMAGED, REF SRM 54-31-01-02B-661A-A,
(Iss.Date: 06.Jul.2021 )
DEADLINE 5654FC
(Iss.Station: HAN)

VN-A819 Open Defects = 5


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

18.Aug.2021 MEL 35-31-01 , CAT D ADD B56571-03: 01 PORTABLE OXY BOTTLE AND MASK USED ADD B56571-03: 01 PORTABLE OXY BOTTLE AND MASK USED. MEL
A819/WO 564427 5 Day
35-31-01. CAT D. DEADLINE 18AUG2021. MEL REV 01/21
(Iss.Date: 20.Apr.2021 )
(Iss.Station: HAN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

28301-0D OXYGEN MASK ( Noted by at on )


1.00 6.00
(Request date: 28.Apr.2021 by DIEPTQ)

3553AAAYAACXBD PORTABLE OXYGEN CYLINDER, 11.0 CU FT ( Noted by at on )


1.00 0.00
(Request date: 28.Apr.2021 by DIEPTQ)

19.Aug.2021 MEL 21-52-12-01 , CAT C B110835-77 STS MSG RAM FAN L ADD RAISED REF MEL 21-52-12-01, CAT C, DEADLINE: 19 AUG 2021 MAINT
A819/WO 610182 6 Day
PROCEDURE C/O
(Iss.Date: 09.Aug.2021 )
(Iss.Station: SGN)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

69494J230 PACKING ( Noted by DUNGLV at 1:34 on 11.Aug.2021 )


2.00 9.00
(Request date: 11.Aug.2021 by DUNGLV)

KRYTOX240AC LUBRICANT (2OZ/TU) ( Noted by DUNGLV at 1:34 on 11.Aug.2021 )


1.00 0.00
(Request date: 11.Aug.2021 by DUNGLV)

7110136H02 FAN ASSY - RAM AIR PR0090421 23.Aug.2021 ( Noted by DUNGLV at 1:34 on 11.Aug.2021 )
1.00
(Request date: 11.Aug.2021 by DUNGLV) (13.Aug.2021) (Ordered by BATD)
1.00 0.00
PR0090021 20.Aug.2021
1.00
(07.Aug.2021) (Ordered by BATD)

69494J906 RING, SEALING P0148420 20.Jan.2021 ( Noted by DUNGLV at 1:34 on 11.Aug.2021 )


4.00 5.00 100.00
(Request date: 11.Aug.2021 by DUNGLV) (16.Dec.2020) (Ordered by HOANNV)

69494J904 PACKING ( Noted by DUNGLV at 1:34 on 11.Aug.2021 )


4.00 13.00
(Request date: 11.Aug.2021 by DUNGLV)

20.Aug.2021 MEL 77-31-01 , CAT C ADD B110837-01: ENG VIB MONITOR L ADD B110837-01 RAISED FOR ENG VIB MONITOR L
A819/WO 610312 7 Day
(Iss.Date: 10.Aug.2021 )
(Iss.Station: SGN)

Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

2122M32P08 ENGINE MONITORING UNIT ( Noted by DIEPTQ at 14:41 on 10.Aug.2021 )


1.00 0.00
(Request date: 10.Aug.2021 by DIEPTQ)

16.Oct.2021 MEL 25-25-02-01A , CAT D ADD B111749-06 "TOUCH SCREEN CONTROL AT SEAT 15G INOP" ADD B111749-06 "TOUCH SCREEN CONTROL AT SEAT 15G INOP" IS RAISED
A819/WO 585203 64 Day
REF MEL 25-25-02-01A CAT D DEADLINE 16/10/2021 REV 2FEB2021
(Iss.Date: 18.Jun.2021 )
(Iss.Station: HAN)

19.Oct.2021 MEL 25-25-02 , CAT D ADD B0081861-5 ADD B0081861-5, SEAT 12 A INOP DUE TO SEAT COVER DIRTY RAISED REF
A819/WO 585721 67 Day
SEAT COVER 12A DIRTY MEL 25-25-02, CATD DEADLINE 19-10-21 REV 01MAR 2021 BY085AC
(Iss.Date: 21.Jun.2021 )
(Iss.Station: HAN)

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021
13.Aug.2021 Page 38 / 38
ADD B DEFECT LIST 16:36 NHATHC

VN-A829 Open Defects = 4


A.C/ WO No REMAINING DUE DATE DOC REFER DEFECT DESCRIPTION FIRST ACTION

18.Aug.2021
18.Aug.2021 MEL 21-53-01-02B , CAT C ADD B060635-6: SCU #2 DEACTIVATE DUE TO LEAK ADD B060635-6 IS RAISED FOR SCU #2 DEACTIVATE DUE TO LEAK, MEL
A829/WO 605984 5 Day
21-53-01-02B, CAT C, DEADLINE 08 AUG 2021
(Iss.Date: 30.Jul.2021 ) (Concession)
(Iss.Station: HAN) (CAAV)
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

7011015H03 SUPPLEMENTAL COOLING UNIT ( Noted by TRANGNH at 10:32 on 13.Aug.2021 )


1.00 0.00 dự kiến 14/8 giao SGN
(Request date: 31.Jul.2021 by DUNGLV)

30.Aug.2021 CDL 78-31-01 ADD B118592-8 : 01 RH T/R BLOCKER DOOR PANEL MISSING ADD B118592-8 : 01 RH T/R BLOCKER DOOR MISSING (REMOVED DUE TO
A829/WO 581773 17 Day
ADD B118592-8 : 01 RH T/R BLOCKER DOOR MISSING (REMOVED DUE TO CRACKED OUT OF LIMIT IAW AMM 78-31-14) IAW CDL 78-31-01 REV 01MAR
(Iss.Date: 02.Jun.2021 ) CRACKED OUT OF LIMIT IAW AMM 78-31-14) IAW CDL 78-31-01 REV 01MAR 21. OPS : REDUCE THE PERFORMANCE LIMITED WEIGHT
(Iss.Station: SGN) 21. OPS : REDUCE THE PERFORMANCE LIMITED WEIGHT
Part Request Part Description/Request Date Req. Qty Avai. Qty PO No Order Qty Est. Arrival Date Part Request Note

720Z3342-301 NUT P0229621 07.Jul.2021 ( Noted by TRANGNH at 14:56 on 30.Jul.2021 )


1.00 0.00 2.00 chờ thông tin release hàng
(Request date: 09.Jun.2021 by HAIPD) (29.Jun.2021) (Ordered by BATD)

NAS7504A26 BOLT P0229621 07.Jul.2021 ( Noted by TRANGNH at 14:56 on 30.Jul.2021 )


1.00 0.00 1.00 chờ thông tin release hàng
(Request date: 09.Jun.2021 by HAIPD) (29.Jun.2021) (Ordered by BATD)

721Z3572-141 BLOCKER DOOR P0236421 10.Aug.2021 ( Noted by TRANGNH at 14:55 on 30.Jul.2021 )


1.00 0.00 1.00 đang gửi đến OEM để làm trao đổi, chưa có thông tin hàng về
(Request date: 09.Jun.2021 by HAIPD) (19.Jul.2021) (Ordered by BATD)

MS21043-6 NUT P0229621 07.Jul.2021 ( Noted by TRANGNH at 14:57 on 30.Jul.2021 )


2.00 0.00 100.00 chờ thông tin release hàng
(Request date: 09.Jun.2021 by HAIPD) (29.Jun.2021) (Ordered by BATD)

12.Sep.2021 B0073046-10: DENT AND CRACK DAMAGE ON OUTER SURFACE OF PANEL B0073046-10: DENT AND CRACK DAMAGE ON OUTER SURFACE OF PANEL
A829/WO 610653 195 FC
22 (198KR) 22 (198KR); REF RDR BMO-BMO-21-0075-02B, INTERVAL 200FC HST APPLIED,
(Iss.Date: 12.Aug.2021 )
INSPECT INTERAL 20FC THRESHOLE: 1986 EXP 2166FC
(Iss.Station: HAN)

28.Sep.2021 ADD B0060616-07: FOUND SOME BUSTER ON NOSE RADOME ADD B0060616-07: FOUND SOME BUSTER ON NOSE RADOME FWD STATION
A829/WO 604486 46 Day
ADD B0060616-07: FOUND SOME BUSTER ON NOSE RADOME 61.80 DIM 15* 10 MM L/W IS RAISED REF SRM 51-33-01-03A-661A-A TABLE 01
(Iss.Date: 23.Jul.2021 ) DEADLINE : NEXT BASE MAINT CHECK - NOT EXCEED 36 MONTHS RAISED
(Iss.Station: HAN) BY 082AC

produced by AMOS www.swiss-as.com


Form has been updated by NGUYEN VAN HUNG (HUNGNV2) ON 13.Jul.2021

You might also like