You are on page 1of 24
. One hectare is equal to (A) 4048 m2? (B) 4000m?— (C) 100m (D)_ 4840 m? Scanned with CamScanner 16. A developer would like to select a residential plot of 3000 m? for group every group housing plot, 15% of the Floor Area Ratio (FAR) over and above maximum permissible FAR has to be utilized for Economically Weaker tion (EWS) unit. ‘maximum built-up area (in m*) available from the options given below is sing ina city. Different options with varying development controls are given. Scanned with CamScanner ‘Area | Ground Coverage (4) [FAR 1 | 1s 2 [ao 20 3 [ao 20 a [is 30 Q.13 A residential area of 20 hectares is planned for three different types of plots of 500 m?, 300 m? and 200 numbers of plot in each category are 100, 120 and 150 respectively. The rest of the area is allocated for roads and facilities such as schools, shops and parks. Each plot has one dwelling unit and the average household size is 5 persons. The net residential density of the area in persons per hectare is Scanned with CamScanner Q.15 Ina site map, a rectangular residential plot measures 150 mm * 40 mm, and the width of the front road in the me measures 16 mm. Actual width of the road is 4 m. If the permissible F.A.R. is 1.2, the maximum built-up area for he residential building will bem’. Scanned with CamScanner 17 In a mixed use development on a 2.0 hectare site with 2.0 FAR, the ratio of residential to commercial floor area is . The minimum parking (in ECS) needed per 100 sqm of residential and commercial floor area is 1.0 and 1.25 tively. Considering full FAR utilization, the total parking requirement is___———_ECS. Scanned with CamScanner | .28 Two design options of a business building on a 10.0 hectare site are being compared for built up area. Floor to i loor height of Option A is 3.6 m and that of Option B is 4.5 m. If the maximum allowable building height is 45 m with sme ground coverage for both options, the additional built up area achievable in Option A over Option | is percent. | Scanned with CamScanner Q20. A proposed housing will have HIG, MIG and LIG units on a site measuring 60,750 sq.m. The buildable area of each category of units with respect to the total buildable area will be 30%, 50% and 20% respectively. The maximum allowable FAR is 2.5, ground coverage 45% and height 15 m. The maximum buildable area in sq.m of HIG units, | considering a floor height of 3 in for all categories will be. . | Scanned with CamScanner 15. A four-storey buildin, R is increased to 2.2 ____ Q marks). 8 With equal areas in cach floor is required to be designed on a plot with FAR of 20. Ifthe , the percentage increase in ground coverage utilizing full FAR in both cases will be Scanned with CamScanner a QS 50 Hectare of residential sector has 65% buildable area. The FAR of the wwe ‘buildable area is 1.5. Within the residential sector, 60% of dwelling units are of eee eee area 100 m? each and 40% of the dwelling units are of area 80 m? each. The gross residential density, in dwelling units per Hectare, would be Scanned with CamScanner Linked Answer Questions Statement for Linked Answer Questions 11 and 12: A group housing project spread over 20 hectares with FAR 1.5 has to accommodate different housing units in the following manner: Category | Percentage | Built up area per unit in sq.m | Average houschold size distribution _| (including common areas) P 10 120 40 Q 20 80 46 R 40 60, 55 Ss 30 45 6.0 Q.11 The respective number of housing units to be built for each category are (A) P25, Q—75, R= 200, $ ~ 200 (B) P—75, 9-25, R200, s- (©) P25, Q-25, R-75, S~ 200 ©)P~28,Q-78 R200 Se. Scanned with CamScanner Q.12 The gross density of the above housing complex (in persons per hectare) is (A) 125-130 (B) 130-135 (C) 135-140 (D) 140-145 Scanned with CamScanner Common Data for Questions 10 and 11: A building site has a plot of 500 sqm Maximum allowable height — G+7 ‘Area to be utilized for paved access roads — 10 % Maximum ground coverage — 40% Runoff coefficient for paved surface — 0.9 Maximum allowable FAR — 2.0 Runoff coefficient for unpaved surface — 0.3 Q10. If maximum allowable FAR is utilized, the minimum ground coverage would be (A) 20% (B)25% (C)30% (D)35% Scanned with CamScanner QI1. If it rains for 30 min. with an intensity of 10 cm/hr, minimum volume of rain wat Wer that can be coll i (A) 12.75 cum (B)14.cum (C)15cum (D) 16 cum collected will be Scanned with CamScanner Scanned with CamScanner A commercial plot measures 100 m x80 m. if the permissible Floor Space Index (FSI) is 3.0, and 50% of the ground covered, then the maximum number of floors that can be built is (A)3 (B)4 (C)6 (D) 12 | Scanned with CamScanner 8. The total land requirement for senior secondary schools for a city of population of 1,00,000 persons is about: )8ha (B) 15ha (C) 25 ha (D) 40 ha 721 Scanned with CamScanner | Statement for Linked Answer Questions 25 & 26: A residential plot measuring 12 metres x 15 metres abuts a road on its smaller side. Permissible ground coverage = 50 %, Floor Space Index (FSI) = 2.5 and maximum permissible floors = 4 | 25. Maximum total buildable area in sq, m is (A) 180 (B) 225 (C) 360 (D) 450 Scanned with CamScanner 26. As per revised building bye-laws, Ifthe required setbacks are - Front 3 metres, each Side 2 metres and Rear 2 metres, then the maximum total buildable area will | | | (A) increase by 248 sq.m (B) increase by 40 sq. m (C) decrease by 30 sq.m (D) decrease by 40 sq. m Scanned with CamScanner | Q3. A plot of land measuring 25 m x 40 m has a Ground +4 storeyed building with uniform floor areas. If the land bs | been utilised to its fullest and FAR is 2.5, calculate the permissible ground coverage? (A) 50% (B) 5% (C)25% (D) 40% Scanned with CamScanner A small commercial plot measuring 20 metre x 30 metre located in a community centre is subjected to maximum coverage of 60 % and FAR 300. With fullest land utilisation and uniform floor areas how many floors can be on the plot. six (B) three (C) five (D) ten Scanned with CamScanner Q4. Which of the following is the closest approximation to a land of area measuring 1.5 acres? (A) 1500 sqm. (B) 3035 sqm. (C) 6060 sqm. (D) 6070 sqm. Scanned with CamScanner Q10. A residential plot of 20 metre frontage and 25 metre depth is governed by the development regulations of maximn FAR of 200 and maximum plot coverage of 50%. Up to what maximum height can the plot be built? (A) 2 floors (B)3 floors (C) 4 floors (D) 10 floors Scanned with CamScanner (7 Workout the net and the gross population densities for a neighbourhood, given the followin, Ground coverage = 30% FAR=1.5 a b c. Plinth area per residential block = 372 sqm 4 e f Number of dwelling units per floor in each block = 2 Average family size = 4.5 Area under residential plots = 62 % &. Area under access roads = 2% 4h. Area under others including major roads = 36% Scanned with CamScanner |, Density control of residential area is expressed in terms of, (A) Dwelling units per floor (B) Dwelling units per plot. (C) Age-sex ratio (D) Floor area ratio Scanned with CamScanner

You might also like