Mining Resilience Sustainability Concept in Mining - Geo Summit 2021
Mining Resilience Sustainability Concept in Mining - Geo Summit 2021
water volume
Uncontrolled
calculation
of Rainfall
based on
water (run
sustainable of
off)
mining project
Create the
Potential Acid
Bore hole Forming (PAF)
geological and Neutral
composition Acid Forming
(NAF) scheme
The Fundamental
pH Saline Sustainability of water
pH acid water water (+ 6) contaminant management
on < 6 and and Total on coal mining area
Total Dissolved Dissolved
Solid (TDS) on Solid (TDS) on
=> 300 mg/l < 300 mg/l on
on pit area human life
area
water
The occurred of contaminant
Water flow system
contaminant sustainable
parameter on strategy &
mining location Create Free
Energy For
activity Human
Overview of the water contaminant impact from AMD
AMD will be damaging every area which can be enemy for environmental and human live if
the effect more bigger and bigger
General Overview of Indonesia Coal Mining Area and location of coal mining project
East of Kalimantan:
1441 KP and 23 KK/PKP2B
(2016 : KESDM)
Water
Monitoring
Point
Management
Rx of AMD by pH 5 ≤ Normal if
1 Normally Rx of AMD biotic or abiotic
AMD RX of
2 Rx of AMD by pH < 4.5 if forming on
project
the spot if AMD area identified
5
10000
4
4
8000
3
6000 3
2
4000
2
1
2000
1
0 0
Jan Feb March April Mey June July Aug Sept Okt Nov Dec
Rainfall water (M3) Rainfall lost time (hour) Water debt (M3/hour)
Identification of AMD based on bore hole of material description
Vadoze Zone Coal Water Contaminant
The correlation among Volume of Material (Bcm), Porosity (%), and Hydraulic Conductivity (m/s)
Mate rial Composition of mining Se que nce s Plan South Block are a
Mate rial Volume (BCM) Porosity (%) Hydroulic conductivity (m/s)
Soil (NAF) 52684.32 40 0.00001
Clay (NAF) 170669.7 25 0.000001
Sand (PAF) 341339.4 50 0.001
Mud (PAF) 86882.75 65 100
Waste Management modelling based on run off water contaminant by using an encapsulation method
Pumping specific parameter to control water on sump to transfer in catchment area (WMP)
How to use
this resources of AMD???
Technology
Mining
Resilience
Infrastructure
Environmental Plan Mining
fundamentally
concept
Human
3. Industrial
Investment
Socio-
Economic
Efficiency
Mining Resilience
Infastructure Plan in Nickel
Project
Overview Location PT Genba Multi Mineral for Mining Resilience Infrastructure Plan Concept
River EFO Smelter point
Overview:
There are some point of view correlation among mining area, river location, Main Haul
Road Location, Supply Chain Management point in Jetty, Smelter Plan and Mining Crycle
Societies Who have been Involved in Mining Resilience Infrastructure plan Calculation in
PT GMM
Green Mine Optimization Strategy by Resource Based Industrilzation in Smelter Process Plant
COG:1,7 Recovery Smelter Product
25_spc Total Material
Nickel Ore (Ni %) nickel melting
Hole_ID (Wet Metric Ton) Ni Co Fe SiO2 MgO (Dry Kiln Product/DKP(ton)) (Kg)
F052063 ore 2,13 0,03 24,17 39,81 4,09 98,30% 18 - 20
Resource Based Industrilzation Model above has been represented adding values
implementation concept in number of points were:
1. Material Change from Wet metric ton (Wmt) by 1.7 Ni% to be Dkp Product (ton) on 18 –
20 Kg which total target in PT GMM namely 4.000.000 Wmt = 80.000 Dkp (ton)
2. Price change from Wmt by 1.7 Ni% export on 27 – 32 $/ton to be Dkp Product (ton) on
14310 $/ton 0,002 % from nickel export than Dkp Product Price on board
3. Material Collaboration for smelter process will need limestone for calcination Process
which 1 ton Dkp product need 166 Kg Limestone (another reserve will be adding on
smelter plant)
Water Electrical Power Supply Monitoring system and Electrical Charging in EAF Model
Waterdebt electrical Parameter PT GMM Based on Catchment area Limitation paramter number Remarks
Gravity force (M/s2) 9,8
All Water Debt in PT GMM (M3/s) 126,1
water electrical looses analysis
Height of waterfall (M) 5
Submersible pump drainage (%) 0,7
Total energy Estimation Electrical charging for smelter Kwh/ton 762 Electrical for smelter process Plant /ton dkp
Total Energy Estimation by Water Resource Estimation Electrical charging (kwh) 4324,8 (fullfilled water electrical supply by coal electrical plant )
Type of energy Specification electrical Supply (Kwh/dkp (ton)) Energy Composition (%)
Coal Power Plant Energy Low Grade Coal (4000-5000) 467 61,2
a) Oxygen Burners 70 9,2
b) Exothermic/Chemical Reactions 201 26,4
Exotermic & Oxy-Burned Energy
c) Electrodes 16 2,1
d) Combustibles 8 1,1
a) Cooling 114 15
b) Electrical Looses 35 4,6
Energy Looses
c) Slag 42 5,6
d) Misc.Looses/Other Looses 7,6 7,6
Energy Recyling to Energy Konversion Off-Gas/Flue Gas 121 15,9
General Overview Water Electrical Power Supply Monitoring system and Electrical Charging in
EAF Model in PT GMM Investment Model System
Material Parameter Distance (Km) Material Supply Cost/ton or Kwh ($) Production Cost ($)
Coal Spec: 4000 - 5000 (Kcal/Kg) (East Borneo) - Smelter IUP PT GMM (ton) 1326 24907 60 $ 1.494.400
River Water Flow - Smelter Plant (M3/s) 20 126 3,8 $ 479
Limestone salonsa (ton) - Smelter Plant 12,3 13280 15 $ 199.200
Active block Pit PT GMM (wmt) - Smelter Plant 16,3 4000000 11 $ 44.000.000
Total Production Cost for Smelter Supply Chain Mangement Plant $ 45.694.079
Cyrcle Mining Socities Presentage Clasification for CSR Needed Stokeholders sharing
Ronta Village 28% Rp 86.434.568.902 Session for CSR Precentage
Bimor Jaya Village 32% Rp 98.782.364.459 based on Mining Ring in
Mohoni Village 23% Rp 70.999.824.455 Cyrcle mining Societies in
Keuno Village 17% Rp 52.478.131.119 PT GMM
CASE STUDY: NEW PROJECT IN NICKEL SMELTER DEVELOPMENT PLAN “
MINING RESILIENCE CONCEPT IMPLEMENTATION ON MINING PROJECT ”(2021
- NOW)
PT AIP Have Number of Advantages as a strategic mining condition to develop from exploration Overview until operation
production Overview So This Reason Why PT AIP should be offered to by as the best mining alternative to buy for investor (will be
showed detaily in Next Slide review)
General Overview of Mining concession Operation Production (IUP OP) in Around PT AIP
The Corelation Among Exploration Mining Concessions (IUP Eksplorasi) & Operation Productions (IUP OP) in PT AIP Mining Strategic Identification Area
Remarks:
1. There are 13 IUP
(Mining Concession)
around PT AIP So This
Location Could be
Developed as the big
region for nickel
mining industry.
2. PT AIP located in thi
middle of IUP (13
Mining Concession),
this could make PT AIP
as the Core of Mining
Operation and
Industry and beside
that PT AIP has a Jetty
That supported this
Location could run the
strategic mining
activities on this site
Mining Production, Ore Market Simulation (Jetty Review), & Mining Supply Chain Management Around Coastal Areas in PT AIP
PT AIP Represent The Strategic Coastal Mining Development Activities from all mining Concession Around it
Land Use simulation mining scenario in PT AIP
Remarks:
1. PT AIP Located in
Central IUP which
consist of number of
area restriction review
were Hutan Produksi,
APL & Slice of Hutan
Produksi Terbatas
2. All IUP in North
Morowali Represent
number of HGU
(Plantation)
3. All IUP in Banggai
region located Along
coastal area with
Protection forest area
4. Jetty PT AIP could
handle all problems
around mining
concession to run their
production.
Detail Overview Update Mine Infrastructure Analysis in PT AIP (March 2021)
Sample Check Analysis (West Dome Area)
General Overview Supply Chain Management & Smelter Mining Industry Overview In Middle – East Sulawesi – East Indonesia Into
Reconstructing Simulatenoues Nickel Mining Industry main source (Hilirisasi) in Indonesia
Terminal Khusus (Main Terminal)/Jetty PT AIP
Remarks:
1. Shipping Experience PT AIP on 2011 was a proved that this jetty has been used for shipping activity, by see ROA Document on 2011 & Exportir for Mining
Product in 2012.
2. Jetty will be conducted in export in 2018 – 2019 but the mining contractor didn’t finish the target because average data on 1.5 – 1.7 Ni% & Export Has been
Closed on 2019 so this IUP (Concession) die and need to in charge for running
3. Jetty was actively and already to conducted another activity for FOB & CIF Ore Selling Market or Smelter Allocation Investment
Smelter Alocation Investment Plan in PT Asindo Internasional Perdana
Remarks:
1. Smelter Allocation Model Need
Number of Parameter, Consist of River
for Water Electrical Charging, Ore
Model Scenario for Smelter Exercise
on Dry Kiln Product, and Jetty Access
For Infrastructure Materials and Ore
Supply Chain Management Which PT
AIP Have number of parameter
include on one package on the
concession.
2. Extention Area Between Mining &
Smelter Infrastructure Should Be
Calculated Precision Which This IUP
Has Number Of Rivers So in Case We
Could build Dam by try to connect
number of river in one drain to
collarated the energy in one package
to fulfill electrical charging in smelter
plan.
3. Location in Banggai Regency was very
rare of socities so in to develop
industry is very suitable to invest.
Ore Selling Market in Nickel Supply Chain Management PT AIP in East Coastal Mining Areas on Indonesia
Remarks:
1. East Costal Sulawesi Smelter Plan Has Developed by Number of Strategy namely smelter allocation plan model, Number of IUP (concession) in Near of Smelter
Plan, Contract and Legalize of Smelter to another IUP To sell all raw materials, and smelter technology enhancement in hiliritation spirit to adding value of mineral.
2. Smelter Competition has been brought all investor to create a best technology and efficiency model to reconstruct saprolite zone in 9 mineral such as ni, fe, al,
c, co, cr, mg, mn, sio2 how to separate all this minerals to be economic in hiliratition product in smelter industry until to be a useful product ex: electrical cars and
electrical batery.
Mining Parameter Analysis PT AIP
Remarks:
All Parameters Could Described The Correlation Among Technically Data, Market, Enviromental and
Future Business Plan From IUP Asindo Internasional Perdana Have Strong recomendation to Invest
CASE STUDY: CASE STUDY: NEW PROJECT IN NICKEL SMELTER DEVELOPMENT PLAN “
MINING RESILIENCE CONCEPT IMPLEMENTATION ON MINING PROJECT ”(2021 - NOW)
Remarks:
All Smelter Located on West (PT Haudi Nickel Alloy) North (PT VDNI, PT IMIP, PT GNI) and East (PT Harita) area Than on South Area Smelter
Did Not Exist So Smelter Plan On North Buton is Best Decision Allocation Investment Plan to Develop To Be Strategic Industry
Land Use, Strategic Infrastructure, Socio Economic, & New Development of City Center North Buton Into
Deciding Smelter Plant Future business investment
General Potential Location, Why North Buton Should Be Invest as Nickel Industrial Investment Plan in South???
Remarks:
1. North Buton Smelter Plan
Support by 1 IUP in North
Buton, 1 IUP in Muna, 4 IUP
in South Konawe Aside, 7 IUP
in Buton Regency, Wawoni
Island, Kabaena Island and
Bombana – South Kabaena
Smelter
Coastal Areas.
Plan 2. North Buton Smelter Plan
Butur
is OPK Legality Which All IUP
Could Support The
Sustainable of This Area But
We Should be Look How The
Technology Could Connect
with Industrial Challenge on
Future Business Industry
(lithium Battery, Hiliritation
all mineral in Nickel, and
Electrical Cars)
Coal Industry & Limestone For Refinary Process Plant in Acr Furnace System
Remarks:
1.Coal Volume Was Need For
Smelter Industry To
Accelarate Water electrical
Charging in Butur Smelter
Plant
2. Limestone was a Primary
Materials to Help Calcination
Process in Smelter Which To
Produce 1 DKP/Ton We need
188 Kg Limestone So all
Materials should be prapared
for develop smelter plant in
In North Buton
Zonasi Smelter Plan Industry by Concept Mining Resilience & Sustainable Plan Mining Industry (Pilot Project in North Buton)
North Buton Smelter Plan Pilot Project Development for Mine Resilience & Sustainable Zone Mining Industry