This Product Manual shall be used as reference material by all Regional/Branch Offices &
licensees to ensure coherence of practice and transparency in operation of certification under
Scheme-I of Bureau of Indian Standards (Conformity Assessment) Regulations, 2018 for
various products. The document may also be used by prospective applicants desirous of
obtaining BIS certification licence/certificate.
• Dimension (Cl 8)
• Construction (Cl 9)
• Compression Test (Cl 10.2)
• Impact Test (Cl 10.3)
• Bending Test (Cl 10.4)
• Fire Hazard (Cl 13.1.3)
6. Scope of the Licence: : Please refer ANNEX - D
Grouping Guidelines
1. The parameters as given below shall be considered for grouping of “Conduit Systems for
Cable Management - Conduit Systems Buried Underground” as per IS 16205
(Part 24):2017 for the purpose of GoL/ CSoL:
i. Conduit Diameter
ii. Material – Metallic/ Non-metallic / Composite
iii. Resistance to Compression – Type 450 / Type 750
iv. Resistance to Impact – Light / Normal
v. Resistance to Bending – Rigid / Pliable
vi. Resistance to External Influence:
(a) Ingress Protection - Min. IP6X for protection against ingress of solid objects
and Min. IPX7 for protection against ingress of water
(b) Resistance against Corrosion - Without protection/ With protection
(classification 1, 2, 3, 4)
vii. Resistance to Flame Propagation – Non-flame propagating/ Flame propagating
2. Conduit systems with lowest and highest size having same other classifications as above
shall be tested for covering the entire range.
3. The following relaxation may be given when a variety is tested for all the requirements:
i. If Type 750 is tested, Type 450 may also be covered.
ii. If conduit systems with superior degree of protection is tested, conduit systems with lower
degree of protection may also be covered.
iii. With respect to resistance to Impact, if Normal (N) is tested, Light (L) may also be
covered.
iv. With respect to Resistance to Corrosion, conduit systems having the most severe
classification may be tested to include conduit systems with lower severity.
v. If non-flame propagating conduit systems is tested, flame propagating conduit systems
may also be covered.
4. The Firm shall declare the varieties of conduit systems they intend to cover in the Licence.
The Scope of Licence may be restricted based on the Manufacturing and Testing
capabilities of the Manufacturer.
5. During the operation of the Licence, BO shall ensure all the Varieties covered in the Licence
are tested in rotation to the extent possible.
PM/ IS 16205 (Part 24) / 1/April 2020
ANNEX - B
The above list is indicative only and may not be treated as exhaustive.
PM/ IS 16205 (Part 24) / 1/April 2020
ANNEX C
1. LABORATORY - A laboratory shall be maintained which shall be suitably equipped (as per
the requirement given in column 2 of Table 1) and staffed, where different tests given in the
specification shall be carried out in accordance with the methods given in the specification.
1.1 The manufacturer shall prepare a calibration plan for the test equipments.
2. TEST RECORDS – The manufacturer shall maintain test records for the tests carried out to
establish conformity.
3. LABELLING AND MARKING - Information as per cl. 7 of IS 16205 (Part 24):2017 shall
be clearly and indelibly marked at intervals of not more than 3 meters (preferably 1 meter along
their lengths).
4. CONTROL UNIT – Continuous extrusion run of one machine of one size, one class and type
of conduit from one extrusion compound up to a maximum of 24 hrs duration shall constitute a
control unit.
5. LEVELS OF CONTROL - The tests as indicated in column 1 of Table 1 and the levels of
control in column 3 of Table 1, shall be carried out on the whole production of the factory which
is covered by this plan and appropriate records maintained in accordance with paragraph 2 above.
5.1 All the production which conforms to the Indian Standards and covered by the licence should
be marked with Standard Mark.
TABLE 1
Note- 1: Number of specimens shall be as specified in the Standard for each test.
Note- 2: Sub-contracting is permitted to a laboratory recognized by the Bureau or Government laboratories empanelled by the Bureau.
Note- 3: Levels of control given in column 3 are only recommendatory in nature. The manufacturer may define the control unit/batch/lot and
submit his own levels of control in column 3 with proper justification for approval by BO Head.
PM/ IS 16205 (Part 24) / 1/April 2020
ANNEX D
“Licence is granted to use Standard Mark as per IS 16205 (Part 24): 2017 with the following scope: