You are on page 1of 1

GENERAL DETAILS :

N S
F O O T I N G D E T A I
I O L S
1. ALL DRAWING SHOULD BE READ ALONG WITH THE ARCHITECTURAL

Footing
Footing Size
V AT DRAWINGS.
2. GRADE OF CONCRETE MIX SHALL BE M 20 (1: 112 :3) CONFORMING TO
Length Width Depth
L1 W1 D1
N OREBAR/X REBAR/Y I.S. 456 - 2000 UNLESS OTHERWISE SPECIFIED.

I N 3. ALL PLAIN AND REINFORCED CEMENT CONCRETE WORK SHALL

DS
1350 1350 350 #10 @ 150 c/c #10 @ 150 c/c STRICTLY CONFIRM TO I.S.456 - 2000.
4. REINFORCEMENT SHALL BE Fe 500 CONFORMING TO I.S.1786-1985.

L
ZColumn C1
5. CLEAR COVER TO STEEL AS FOLLOWS:
- FOR FOOTING 50 MM

D E T A I L S
- FOR COLUMN 40 MM
Base Plate Size 250 x 250 - FOR BEAM 25 MM
OD - 600
PCD - 470 - FOR SLAB 20 MM
ID - 270
Hole Ø - 20
No. of Holes - 12Nos Section 6. ALL REINFORCEMENTS SHALL BE PLACED AND
150

F.F.L F.F.L MAINTAINED IN THE POSITION SHOWN IN THE DRAWING

N.G.L N.G.L #12 - 16 (CROSS SECTION) BY PROVING PROPER COVER


Reiforcement

C O L U M N
Longitude #12 - 16 BLOCKS, SPACERS AND SUPPORTING BARS.

.
Foundation Bolt #8 @ 150c/c 7. THE COVER BLOCKS SHOULD BE PREPARED BY M20 CONCRETE MIX.
Ø20 x 450 Long Stirupps

D
2.0m From NGL

Transverse [10L] ALL CONCRETE WORK SHALL BE MACHINE MIXED AND MACHINE

.L T VIBRATED.
8. QUALITY & QUANTITY OF CONSTRUCTION IS SUPERVISED

VT LAP LENGTH VERTICAL - 40D, HORIZONTAL - 60D

P
9. ALL DIMENSION ARE IN " mm & m " UNLESS OTHERWISE SPECIFIED.

S
200

1350
P.c.c.
L

E M
SECTION
REBAR/Y
ST
1350 W S Y
I R OD1
OD

6"

V
00
Ø6

REBAR/X

N L
1350

750

NFOOTING PLAN E FOOTING SECTION


REV
NO
REV
DATE DETAILS CHD.BY APP.BY

M I CLIENT LUCAS TVS LIMITED


Ø4
70
ID

PROJECT

E
PC
73

750
D
Ø2

EXECUTER

PLAN
CH JOB.NO
TITLE

SYSTEM
CES/MILT/244/06-2021

STRUCTURE DETAILS - CHIMNEY

DOUBLE EFFECT FORCED EVAPORATOR WITH ATFD

DRAWING NO - CES/244/CVL/08 SHEET NO. 1 of 1 SHEET A3

R0 NTS 23.08.2021
SK SK NP PG PG BS
REV SCALE DATE DRAWN BY GEN. BY REVWD. BY APPD. BY ISSUED. BY

You might also like