Professional Documents
Culture Documents
18'-6"
[5639mm]
Frame
6'-3"
[1905mm]
[2133mm]
7'-0"
JW
WT
Frame
[5131mm]
16'-10"
WS
AC
Equipment Layout
Minimum Required Ceiling Height (Drop Ceiling): 8'-0" (2438mm)
Minimum Required Ceiling Height (Hard Ceiling): 8'-3" (2515mm)
0 .5m 1m 2m 4m
Equipment Legend
variation per hour. Humidity must be between 20% to 75%. These requirements exist on a 24 hours per day, 7 days per
week basis.
Power Requirements
SkyLight Camera Workstation
Note: The SkyLight camera includes a UPS and provides power to the detectors, carriage, patient table, towers, acquisition
terminal and collimator exchanger. An optional cardiac gate can plug into a 115 V receptacle on the patient table.
Rev. 09.00