Structure steel
For main gate
meter room and toilet room staircase
MS angle
50 x 5 2 4 4.8
50 x 5 2 2 3 0.7
Tread
MS angle
35 x 5 2 21 2 0.15
35 x 5 2 21 2 0.68
Falt putti 25 x 3 2 21 2 0.6
MS pipe 40mm dia 2 4.5
MS pipe 40mm dia 2 4 0.86
MS pipe 40mm dia 2 1.8
Watchman room
seeling 1 3.25 3.55
wall 2 3.25 3.85
wall 2 3.55 3.85
did W1 (-) 2 2.85 1.09
did glass panel (-) 1 2.85 3.23
Coll offset 7 3.85 0.12
meter room seeling 1 4.5 3.8
wall 2 4.5 3.85
2 3.8 3.85
Did D (-) 1 2.35 1.75
W (-) 1 0.8 1.65
F.F Room
(2no) seeling 2 3.8 4.5
wall 2 2 3.8 4.8
wall 2 2 4.5 4.8
Beam Side 2 4 3.8 0.3
2 2 4.5 0.3
Did w (-) 2 1.2 1.35
D (-) 2 0.95 2.08
60 Bamboo pole
T-3A and T-3B
wall cladding
Bamboo
(2No) Building
From Plinth Level 2 73 0.43
2 76 0.43
Wall 2 69 1.37
2 68 1.37
2 51 0.73
2 24 0.66
Long 2 6 4.6
2 69 1.37
2 69 1.37
Left and right side 2 36 0.43
2 35 0.43
Horizontal 2 48 0.3
2 34 1.25
2 32 2
Horizontal support wall 2 2 2 3.23
2 2 2 3.23
2 2 2 3.65
Verticle support wall 2 2 5 3.17
2 2 2 3.88
Horizontal left and right side 2 33 2.3
2 34 0.92
2 44 0.3
Front wall Support Horizontal 2 4 2 6.5
2 2 2.2
2 2 2.2
2 2 2 1.26
2 2 0.73
2 2 0.45
TYPE - 4 (1 No.)
( ) Excavation
( ) Pevar Block
Hostel front & back side round joints 2 3 0.37
2 3 0.35
2 3 0.32
( ) Kota stone
Floor Academic plinth protection 1 11.25 0.6
( ) Molding
Main Gate outer
security TDP granite 2 12.06
2 0.55
2 11.56
Seating Top
Front director 2 4.03
2 9.86
2 0.48
2 1.6
2 1.12
2 3.6
2 2.62
1 16.43
1 15.39
1 3.75
1 2.85
2 2.05
2 1.55
4 0.48
Academic Outer
Passage Tred/Steps 1 3.35
1 3.74
1 3.88
1 3.96
1 0.3
Big Planter 1 10.35
1 6.65
1 10.69
1 6
Passage Tred 1 2.78
1 3.18
1 0.3
Seating Transformer front 2 11.27
2 0.4
1 9.75
1 9.1
1 8.15
1 8.78
1 10.26
1 11.82
1 8.6
1 10.24
1 11.87
1 9.69
1 9.05
1 7.98
OAT Entrance
Steps/ Tred 7 2.25
6 0.53
7 2.28
6 0.55
7 2.25
6 0.52
95 Painting
For Road Curb
Main gate outer 1 8.7 0.22
1 5.27 0.22
1 4.45 0.22
1 11.5 0.22
Front road for
T-1 , T-2 , T-4 Front 1 18 0.22
1 7.8 0.22
1 21 0.22
1 20.9 0.2
T-4 Right side 1 30 0.22
1 9.5 0.22
Bamboo Nursery
Road left 1 30 0.22
1 23.5 0.22
(10.3+30.0+15.10)right 1 55.4 0.22
T-3 A & B back side
Road Parking 1 64.75 0.22
(3.10+7.0+10.45+16.7+17.0+10.5)
T-3 A & B
Back side parking 1 47.9 0.22
(5.9+23.6+5.0+13.4)
Canteen Front
(2.15+4.15+4.35+2.15) 1 12.77 0.22
Academic outer
Road side pathway 1 192.07 0.22
(9.93+7.37+7.20+1.615+60.56+2.10+2.10+1.75+82.30
+7.95+5.60+3.6)
( ) M.10 PCC
Director Quarter 0.5 10.2 3.85 0.1
Type - 6 front road 1 35.63 3.5 0.1
1 5 3.95 0.1
1 6.35 3.95 0.1
1 4.08 3.3 0.1
1 3.1 4.87 0.1
0.5 6.2 5.1 0.1
( ) P2C Rcc
Director Quarter
Type - 6 Front Road 0.5 10.2 3.85 0.2
1 35.63 3.5 0.2
1 5 3.95 0.2
1 6.35 3.95 0.2
1 4.08 3.3 0.2
1 3.1 4.87 0.2
0.5 6.2 5.1 0.2
( ) Polythene Sheet
0.5 10.2 3.85
1 35.63 3.5
1 5 3.95
1 6.35 3.95
1 4.08 3.3
1 3.1 4.87
0.5 6.2 5.1
Near Dewats
long 30.5 - ( 12 x 0.23 ) = 27.74 m 1 27.74 0.23 0.7
15 T.M.T steel
com. Wall coping steel
Admin to director Qut
long 252.8 m
8 mm main bar long 2 252.8
8 mm pin 0.3 c/c 843 0.28
8 mm lap 42 0.4
Near Dewats
Long 30.5 2 30.5 0.8
Wall Top 1 30.5 0.25
Coll of set 12 4 0.07 0.8
12 2 0.23 0.05
Extra span 2 5.77 2.1
2 2.75 0.3
wall end face 3 0.23 1.3
7 PCC M-10
36 Granite stone
for pathway patta
UGT to OHT road side 2 28.15 0.15
1 2.75 0.15
1 2.6 0.15
1 1.2 0.15
2 4.9 0.15
1 1.2 0.15
UGT tred 1 0.3 1.2
Front canteen floor in chamber cover 1 0.8 1.1
26 Structural steel
For rain water cgamber cover jali (13 no )
angle 35 x 5 13 4 0.49
flat patti 25 x 5 13 9 0.48
15 T.M.T steel
OHT
10 RCC Wall
11 RCC Beem
12 RCC wall
13 RCC slab
95 RCC curb
near director Qut
(3.3 + 1.5 + 1.4 + 3.45) 1 9.65
1.1 Excavation
Hostel girl's and boy's Front passing area
NGL 212.82
FGL 213.25
Filling 0.43 mm 1 314.03 0.43
Near OHT left and right side area 1 14.25 30.2 0.575
1 8.4 7 0.575
For OHT
Cloumn GF
6 No. 6 3.6 2
6 No. FF 6 3.6 2
6 No. SF 6 3.6 2
6 No. TF 6 3.6 2
( 450 x 230 )
Outer Beam (GF + FF + SF )
Beam bottom 3 14.13 0.23
Beam top 3 14.13 0.23
Sides outer 3 1 14.13 0.45
sides inner 3 1 12.68 0.45
TF Beam ( slab beam )
(SB1 - 450 x 450 )
Beam bottom 1 14.13 0.45
Sides outer 1 14.13 0.45
sides inner 1 11.304 0.45
Staircase sides
GF to FIFTH Floor
5 No. spiral staircase 5 0.5 23.4 0.3
Per floor center outer = 23.40
5 1 23.4 0.15
Per floor inner center = 14.96 5 0.5 14.9 0.3
Beam side 5 1 14.9 0.15
fifth floor landing 5 6 0.45 0.23
slab 1 4.05 0.15
outer 1 1.4 0.45
Beam side 1 0.3 0.23
Staircase
Beam sides
Per floor 6 No. of beems
5 floor staircase 5 6 1.4 0.2
5 6 1.4 0.15
17 Water Proofing
OHT tank inner side
wall side
2 x 3.14 x r x h 2 3.14 2.02 3.2
Distribution bar
150 c/c 12mm 2 26 13.87
C/L
Lap 12mm 2 26 5 0.6
Pin cher 12mm 1 88 1.5
Slab TS1
Top and Bottom
10mm L1 2 2 4.65
10mm L2 2 4 4.639
10mm L3 2 4 4.6
10mm L4 2 4 4.55
10mm L5 2 4 4.48
10mm L6 2 4 4.44
10mm L7 2 4 4.27
10mm L8 2 4 4.12
10mm L9 2 4 3.95
10mm L10 2 4 3.74
10mm L11 2 4 3.48
10mm L12 2 4 3.18
10mm L13 2 4 2.18
10mm L14 2 4 2.34
10mm L15 2 4 1.669
10mm L16 2 4 0.53
60 Bambusa
(100mm)
Toilet block
A1, B1, C1 3 4 4.1
Slant front 3 8 4.6
A2, B2, C2 3 4 5
Slant front 3 3 5.35
A3, B3, C3 3 3 5.63
Slant front 3 3 5.95
Slant Back 3 3 5.7
Slant Left 3 3 5.65
Slant Right 3 3 5.65
A4, B4, C4 2 9 6
A5, B5, C5 2 9 6.1
A6, B6, C6 2 9 5.6
A7, B7, C7 2 9 5.3
A8, B8, C8 2 9 4.7
Slant front 2 2 4.8
Slant Left 2 2 4.8
Slant Right 2 2 4.8
A9, B9, C9 3 4 4.1
Slant Front 2 2 4.1
Slant Left 2 2 4.7
Slant Right 2 2 4.7
Beam 1 1 4 9
Beam 2 1 4 9.1
Beam 3 1 4 9
Beam 4 1 6 8.9
Beam 5 1 6 8.9
Beam 6 1 9 8.7
Beam 7 1 6 8.6
Beam 8 1 6 8.5
Beam 9 1 6 8.5
Beam 10 1 4 9.2
3 4 20
60 Bambusa Balcova
(100mm dia)
UGT
Column 1 4 1.77
2 4 2.2
2 4 2.5
2 4 3.3
2 4 3.83
2 4 3.57
2 4 3.87
2 4 3.88
1 4 3.43
1 4 3.43
1 4 2.56
1 4 2.24
1 4 2.24
1 4 2.65
1 4 2.63
1 4 2.9
1 4 3.57
Beem 3 4 5.85
3 4 13.75
60 Bambusa Balcova
(100mm)
Quarter Type-3(A)
Frames
Horizontal 1 4 2.85
Vertical 1 8 2.28
Type- 3(B)
1 4 2.83
1 8 2.29
Type- 4
1 4 3.41
1 8 1.8
Type- 2 1 4 2.92
1 8 2.16
Type- 1 1 4 2.92
1 8 2.34
60 Bambusa Balcova
(100mm)
Academic Building
(Est. Block Frames)
Horizontal 1 4 1.8
Vertical 1 5 2.3
Door Horizontal 1 2 2.2
Door Vertical 1 2 0.84
Horizontal 3 4 2.03
Vertical 3 4 2.4
Horizontal 1 4 1.8
Vertical 1 4 2.4
North Block
Horizontal 1 4 1.86
Vertical 1 4 2.35
Horizontal 1 4 2
Vertical 1 12 2.4
Horizontal 1 4 2.05
vertical 1 4 2.03
Horizontal 1 4 1.8
vertical 1 5 2.4
Door Vertical 1 2 2.23
Horizontal 1 2 0.8
Front site (OAT side)
Horizontal 1 4 1.08
vertical 1 4 2.38
Door Horizontal 1 2 0.92
Door Vertical 1 2 2.22
Horizontal 2 4 1.27
Horizontal 1 4 1.34
vertical 3 4 2.37
Horizontal 1 4 1.08
vertical 1 4 2.37
West Block
Horizontal 1 4 1.9
Vertical 1 5 2.44
Door Horizontal 1 2 0.89
Vertical 1 2 2.3
Horizontal 2 4 2.05
Horizontal 1 4 2
Vertical 3 4 2.46
Horizontal 1 4 1.85
Vertical 1 4 2.44
60 Bambusa Balcoova
(100mm)
Vertical poll 109 2 2
Horizontal 109 3 1.45
UGT
Roof edges 2 4 1.375
Bunch Stocksii 1 3 5.8
62 Bambusa Balcova
(50mm)
Facia in Boy's hostel Frames
(GF) 1 37 1.65
1 36 1.65
1 36 1.67
1 15 0.66
1 16 0.66
(FF) 1 15 1.68
1 15 1.6
1 16 1.6
1 16 0.6
1 15 0.57
1 25 0.36
(SF) 1 51 1.72
(FF) 1 18 1.64
1 17 1.58
1 17 1.67
1 19 0.58
1 18 0.54
1 25 0.36
1 51 1.69