You are on page 1of 7

PERSPECTIVE VIEW

SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING PROPOSED (2) STOREY DATE STARTED: 11/25/2020
DEPARTMENT OF CIVIL ENGINEERING INSTITUTIONAL BUILDING 1
ES13 COMPUTER AIDED DRAFTING (BUS TERMINAL OFFICE) DATE SUBMITTED: 12/03/2020
CAD BY: PAJO, KRISTINE MAY 7
REGINALDO, CLOE MAE M.
LOADING OF PASSENGER AREA
1.99

Ticketing Booth TICKET SCANNERS


3.09

UP

Waiting Area

9.68 3.68

Waiting Area

FOOD STALLS
CR FOR WOMEN

CR FOR MEN

2.94

2.22 1.76 3.03 4.60 2.80 3.40


17.79
GROUND FLOOR
SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING PROPOSED (2) STOREY DATE STARTED: 11/25/2020
DEPARTMENT OF CIVIL ENGINEERING INSTITUTIONAL BUILDING 2
ES13 COMPUTER AIDED DRAFTING (BUS TERMINAL OFFICE) DATE SUBMITTED: 12/03/2020
CAD BY: PAJO, KRISTINE MAY 7
REGINALDO, CLOE MAE M.
17.79
3.99 3.09 3.81 3.55 3.37

3.12

DOWN
FOOD STALL FOOD STALL FOOD STALL FOOD STALL

9.73 3.59 HALLWAY

FOOD STALL FOOD STALL FOOD STALL FOOD STALL

3.01

SECOND FLOOR
SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING DATE STARTED: 11/25/2020
PROPOSED (2) STOREY
DEPARTMENT OF CIVIL ENGINEERING 3
INSTITUTIONAL BUILDING
ES13 COMPUTER AIDED DRAFTING DATE SUBMITTED: 12/03/2020
(BUS TERMINAL OFFICE) 7
CAD BY: PAJO, KRISTINE MAY
REGINALDO, CLOE MAE M.
20.80

4.39 3.35 4.26 3.97 3.77

0.28

3.13

3.13

FRONT ELEVATION
SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING PROPOSED (2) STOREY DATE STARTED: 11/25/2020
DEPARTMENT OF CIVIL ENGINEERING INSTITUTIONAL BUILDING 4
ES13 COMPUTER AIDED DRAFTING (BUS TERMINAL OFFICE) DATE SUBMITTED: 12/03/2020
CAD BY: PAJO, KRISTINE MAY 7
REGINALDO, CLOE MAE M.
18.58
0.43

0.28

3.13

3.13

REAR ELEVATION
SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING PROPOSED (2) STOREY DATE STARTED: 11/25/2020
DEPARTMENT OF CIVIL ENGINEERING INSTITUTIONAL BUILDING 5
ES13 COMPUTER AIDED DRAFTING (BUS TERMINAL OFFICE) DATE SUBMITTED: 12/03/2020
CAD BY: PAJO, KRISTINE MAY 7
REGINALDO, CLOE MAE M.
16.01

1.44
2.54
0.57
1.75

4.11

4.11

LEFT ELEVATION
SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING PROPOSED (2) STOREY DATE STARTED: 11/25/2020
DEPARTMENT OF CIVIL ENGINEERING INSTITUTIONAL BUILDING 6
ES13 COMPUTER AIDED DRAFTING (BUS TERMINAL OFFICE) DATE SUBMITTED: 12/03/2020
CAD BY: PAJO, KRISTINE MAY 7
REGINALDO, CLOE MAE M.
1.44
2.54
0.57 1.75

4.11

4.11

RIGHT ELEVATION
SCALE 1:100

PROJECT TITLE: PROJECT DETAILS: SHEET NO. RATING:


SOUTH EAST ASIAN INSTITUTE OF TECH. INC.
COLLEGE OF ENGINEERING PROPOSED (2) STOREY DATE STARTED: 11/25/2020
DEPARTMENT OF CIVIL ENGINEERING INSTITUTIONAL BUILDING 7
ES13 COMPUTER AIDED DRAFTING (BUS TERMINAL OFFICE) DATE SUBMITTED: 12/03/2020
CAD BY: PAJO, KRISTINE MAY 7
REGINALDO, CLOE MAE M.

You might also like