You are on page 1of 1

PLAN LAYOUT IMPROVEMENT WWTP PT.

DONGJIN 1500 TPD


RELOCATION / MODIFY NEW EXISTING

16 15

C S 23600 10100
28 10

22
6500

23
1
17800

27 9 8 29
6

23
23

JUDUL GAMBAR
10200
13
5800

PT. KEISO PROCESS & ENVIRO INDUSTRIES


7
4 5

GENSET

PT. DONGJIN TEXTILE INDONESIA


PT. KORINDO KONSTRUKSI
4500

3 2
24 26 20
19 25
20
14 30
6000 5000 12900

EPC CONTRACTOR
37425

CONTRACTOR'S
2nd floor

CONSULTANT
10100 precast concrete 21.

OWNER
LABORATORY
1st floor basin
22. ROOM ROOT BLOWER 3 UNIT
23. BUBLE DISK DIFFUSER
Mixing Tank

24. 1ST CONCRETE FLOOR SHELTER


Rotary Dewater Device

12

11
5000

NOTE : 25. CONTROL ROOM AND OFFICE


1. WASTE BASIN (MODIFY) 11. REACTION TANK
Control
Panel

26. CHEMICAL TANK STORAGE ROOM


SLUDGE CAKE DISCHARGE
2. FLOCCULATION (MODIFY) 12. DISSOLVE AIR FLOTATION 27. WASTE MATERIAL STORAGE ROOM
3. PRASEDIMENT TANK (MODIFY) 13. SLUDGE THICKNER 28. HOLDING PIT EFFLUENT CLARIFIER
18 4. PLATFORM COOLING TOWER 14. FILTRATE BASIN / TREATED WATER 2 29. BAVEL PERFORATED
5. COOLING TOWER AREA 15. SAND FILTER 30. SLUDGE SCRAPPER UNIT & HYDRAULIC
4500

21
6. EQUALIZATION 16. ACTIVATED CARBON FILTER
17 7. ANOXIC 17. FILTERPRESS 2 UNIT (shelter platform)
8. 2ndAERATION
floor 18. BELT PRESS (RELOCATION)
DETAIL SHELTER 2nd FLOOR 4500 9. CLARIFIER 19. CHEMICAL TANK : pH, Flocculant, Decolloring, Coagulant, nutrient, polimer
10. TREATED WATER (MODIFY) 20. PLATFORM CHEMICAL TANK
17400