You are on page 1of 1
HYDROCARBON DEVELOPMENT INSTITUTE OF PAKISTAN (Cylinder Testing Laboratory) Plot No.1, 8.106, 9 Islamabad, Posten “Telephone: 051)9265323,20 Fax o(0su) 9265321 al gmcoahlp com ok ‘Owner/Station: M/s Rizham Internation, Khewat No. 210, Khatoonl No. 551-556, Khasta No. 647, Mousa Hamza Ghous, Sialkot. Test Report No. HOIP(O5-10-A-GUI/FEOTB Test Date: 23 [06 [20m Issue Date: 24-06-2021 Next Due Date: | 22 | 06 | 2026 Cylinder Type: Td ‘Storage | Fee Receipt No. 018 = Manufacturer's Name: EKC-UAE Fee Deposit Date:_| 23 [06 | al Manufacturing Standard: SEN 1964-1:1999 Register Entry No. 18 Tare Mass Cheek Excernal/ Unrasonie | Hydrostatic Internal visual | ‘Thickness Test | Stretch Test Inspection (mm) S.No | cylinder | wie | manufecturing | : vo | ran = pate | ug) | Pa | Fall | Pass | Fat [Shel [Base | Pass | Fa or {28849 | 80.0 | 06/2009 | 1060 | 7 = cZ e i. [20.28 Eas = o2 | 28689 | 80.0 | 06/2009 | 105.7 | 7 = ¥ - a7 | 193 | vf - 03 28986 80.0 06/2009 106.8 |v a v = | 94 22.2 v - 04 28915, 80.0 06/2009 105.9 | - v a 9.2 21.4 v a 05. 28527, 80.0 06/2009 106.8 | : = 87 20.7 v 06. 28758 80.0 06/2009 105.8 |v - v - a7 215 v : o7 28614 80.0 06/2009 106.8 |v : v = 8.2 20.8 v - 08 28802 80.0 06/2009 106.2 | = ¥ - 9.0 19.5 _ - 09 28715 80.0 06/2009 106.8 | = v = 86 22.5, v - 10 _{ 28737 _| 0.0 | 6/2009 [a06.7 | ¥ | [7 [| as | a) ai_{ 28726 | 80.0 [06/2009 [1055 |" |. | ¥_[ | a7 1 ae [7 oe |e eee es | 13 28936 80.0 06/2009 105.8 [| ¥ - ¥ - a9 | 227 v - Jj a4_| 28079 | 80.0 | 06/2009 | 106.6 |v | - | 7 90 [us| vp. | 15] 28920 | 80.0 06/2009 | 107.5 | 7 v = 95 | 198 [7 = | as_ | 28833 [80.0 | 06/2009 [1068 | 7 5 v | aa | 206 | ¥ {| - | a7 28860 80.0 06/2009 108.7 |v - ca ~ 91 19.2 v - 18 | 28599 | 200 | 06/2009 | 106.7 | 7 - ae are sia 2278 [ews =| 19 29029 80.0 06/2009 107.4 ~ : z = 86 20.6 v : 20 28660 80.0 06/2009 | 105.8 v 2 ¥ = 87 21.0 ¥ : Remarks: [Number of Failed C . Cylinder No: cr Failed in Test. : ‘The cylinder (s) has/has been tested in accordance with compressed Natural Gas (CNG) (Production and Marketing) Rules 1992 and Australian Standard AS 2030-1, AS 2337-1 : ‘The test report is being issued on the fact that cylinder(s) is/are suitable for re-use subject to no law in manufacturing process, mechanical and environmental damage/mishandling are involved. : * The above date/repart reflects our observations at the time and place of testing/inspection, and HOIP will not be ‘esponsible for any accident/mishap, due to incompetency/negligence of man power deputed at CNG station or of substandard/unapproved CNG equipment /CNG system. The Test Report is issued on the basis of test report No. HOIP/FE-018, * The cylinder(s) has/have been found SUITABLE (v) / UNSUITABLE for re-use. Cylinder(s) may be brought on/or before June 22, 2026 for retesting, (Enghyamjatfean) Senior Research Engineer Poge toh Scanned with CamScanner

You might also like