You are on page 1of 33

NAME PROJECT:

ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY


IN THE EXISTING SAIDU MEDICAL COLLEGE
ADP NO.410/190460 (2019-20)

STRUCTURAL DRAWINGS

PLANNING - TESTING - DESIGNING & DEVELOPMENT


FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ENGINEERZ E.mail: gsk.engineerz@gmail.com
GENERAL NOTES
1. BUILDING DESCRIPTION & DESIGN 7 CONC. STRENGTHS 14. ACCESSORIES
a. BUILDING IS DESIGNED FOR BASEMENT + GROUND + THREE STOREY. a. CONCRETE BE TESTED AT IMPORTANT PLACES & STRENGTH BE AS a. BAR SUPPORTS , SPACERS & AND OTHER
DESIGNED AS FRAME STRUCTURE FOR ZONE -2B. FOUND. WALLS, BEAMS, SLAB 3000 PSI 28 DAYS CYLINDER STRENGTH ACCESSORIES ARE NOT SHOWN IN DRAWINGS.
COLUMNS 3000 PSI 28 DAYS CYLINDER STRENGTH b. THE BAR SUPPORTS BE PROVIDES AS APPROVED
b- DESIGN OF STRUCTURE IS BASED ON PAKISTAN BUILDING CODE
BY ENGINEER
(S.P- 2007) , ACI 318-2005 AND UBC 97. 8. FORM WORK & REMOVAL c. SUPPORTS TO BARS BE SUFFICIENT & STRONG
c- BEARING CAPACITY ASSUMED FOR THIS SITE IS 0.50 TSF. a. FORMWORK TO CONCRETE SHALL BE OF METAL SHEETS SUCH THAT THE STEEL REMAIN IN POSITION
OR PLY WOOD. DURING CONCRETING.
2. BUILDING LAYOUT b. THE FORMWORK BE DONE AS PER STRUCTURAL FORMS
a. BUILDING LAYOUT BE DONE WRT TO STRUCTURAL DRAWINGS c. FORMWORK BE WATER TIGHT.
MINIMUM CLEAR COVER
AND ARCH DRAWINGS d. FORMWORK BE REMOVED AS PER FOLLOWING SCHEDULE
b. ANY DIFFERENCE BE DISCUSSED WITH STR. DESIGNER. COLUMNS & SIDE OF BEAMS & WALLS 24 HOURS S.No LOCATION MINIMUM COVER

SLAB, BOTTOM OF BEAMS 14 DAYS.


3. EXCAVATION AND TERMITE TREATMENT 1.

2.
FOOTING

COLUMN
2" above PCC and 3" on other sides

a. FOUNDATIONS TO BE PLACED ON COMPACTED SOIL 9. JOINTS 3. SLAB 3/4"

b. IN CASE OF FILL / OVERBURDEN REMOVE IT. a. EXPANSION JOINTS BE FINALIZED AND GOT APPROVED 4. BEAM/PLINTH BEAM

BY THE RESIDENT ENGINEER. 5. CONFINING ELEMENT/LINTEL BEAM 1"

c. IN CASE OF RAISED PLINTH, FILL WITH SAND / GRAVEL & b. EXPANSION JOINT IN THE BUILDING BE PROVIDED AS SHOWN
COMPCAT BEFORE FLOORING. ON THE DRAWIGS. STANDARD HOOKS (ACI 7.1)
d. PROVIDE TERMITE TREATMENT IN FOUNDATIONS AND IN FLOOR
BAR
BEFORE LAYING PCC. 10. STEEL BINDING DIA
A(in.) B(in.) C(in.)

3/8" 2.5 2.5 4.5


4. W:C:S: AGGREGATES AND SIZES a. STEEL BARS BE PLACED IN THE FORM AS PER DRAWINGS.
1/2" 2.5 3.0 6.0
FRESH WATER: IN ACCORDANCE OF UBC 97 SECTION 1903.4 b. ALL JUNCTION OF THE BARS / CROSS BE TIED WITH BINDING
5/8" 2.5 4.0 7.5
CEMENT: FRESH PORTLAND CEMENT TO BE USED FOR ALL WORKS. WIRE.
3/4" 3.0 4.5 9

SAND : LAWRANCEPUR / GHAZI.


AGGREGATES:IN ACCORDANCE OF UBC 97 SECTION 1903.3
11. DRAIN PIPES & SLEEVES 1" 4.0 6.0 12

MARGALLA STONE CRUSHED AGGREGATES SHALL BE AS: a. TOILET WASHING & DRAIN PIPES BE PLACED IN SLAB AT PROPER
DESIGNED POSITION BEFORE CONCRETE.
STRUCTURAL ELEMENTS MAXIMUM AGGREGATE SIZE b. WHERE PLUMBING AND OTHER PIPES ARE PLACES IN SLAB B/2 C
FOUNDATIONS 1.25 " DOWN GRADED ADDITIONAL STEEL BARS BE PROVIDED ABOVE AND BELOW
COLUMNS & BEAMS 3/4 DOWN GRADED TO COVER THE REDUCED STRENGTH.
SLABS 3/4" DOWN GRADED
12. BRICK , CONC BLOCK MASONRY
3/4" DOWN GRADED MEANS 1/2" AND 3/8" MIX
a. FIRST CLASS BRICKS BE USED FOR MASONRY WORK.
5 REINFORCING STEEL b. BRICKS BE SOACKED IN WATER A DAY BEFORE USE.
a. DESIGN OF STRUCTURE IS BASED ON STEEL DEFORMED c. CONCRETE BLOCKS BE MOISED JUST BEFORE USE.
MAIN STEEL FOR ASTM A 615 d. JOINTS BE 3/8" FILLED WITH CEMENT SAND MORTAR.
FOUNDATION, COLUMNS, BEAMS GRADE - 60 e. ALL MORTAR BE MACHINE MIXED.
f. MORTAR FOR WALLS 8" , 9" SHALL BE 1:5
SLABS GRADE - 60
FOR 4" & 4.5" SHALL BE 1:4
b. SAMPLES OF STEEL BE GOT TESTED BEFORE USE. g. ALL INTERNAL PARTITIONS 4.5" BRICKS / 6" HOLLOW BLOCKS /
WOODEN PARTITION OUTER 8" HOLLOW / 9" BRICKS OR 12" CAVITY WALLS.
6 CONC. MIXING & PLACING

B/2
h. ALL ABOVE ITEM TO BE EXECUTED ,TESTED AND MAITAINED IN ACCORDANCE
a. CONCRETE BE WELL MIXED, VIBRATED, COMPACTED , CURED, OF UBC 1997 CODE STANDARD CHAPTER 21.
TESTED AND RECORD TO BE MAINTAINED AS PER

A
ACI 318 AND UBC 1997 CHAPTER 19 13. STEEL BAR SPACING
b. MIXED CONCRETE BE PLACED IN POSITION WITHIN 15 MINUTES a. FIRST & LAST BAR IN WALLS & SLAB BE PLACED AT 1/2 OF
B
c. MIN WATER IN CONC. GIVES MORE STRENGHT. THE SPACING OF BARS.OR JUST GIVE COVER AND PLACE THE BAR
d. TRY 5 TO 6 GALLONS OF WATER / BAG OF CEMENT b. FIRST AND THE LAST HOOP/TIE IN BEAMS & COLUMNS BE
e. MIXING TIME OF CONCRETE PER BATCH 1.5 MINUTES AFTER BE PLACED AT 2" FROM THE SUPPORT.
ADDING WATER. c. COLUMN TIES TO BE PROVIDED THROUNGHOUT FROM
FOUNDATION TO TOP.

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-i E.mail: gsk.engineerz@gmail.com
DEVELOPMENT LENGTH IN TENSION (ACI 21.5.4.1)

DEVELOPMENT LENGTH (INCHES)


BAR fc' = 4,000 psi fy = 60,000 psi
DIA
STRAIGHT BARS WITH STANDARD HOOK

3/8" 18 7.5

1/2" 24 9.5

3/4" 30 14.5

h/2
given in the center portion of column
1" 48 19

Lap Splice, if required, shall be


DEVELOPMENT LENGTH IN TENSION (ACI 21.5.4.1)

DEVELOPMENT LENGTH (INCHES)


BAR fc' = 3,000 psi fy = 60,000 psi
DIA

h
STRAIGHT BARS WITH STANDARD HOOK

1/2" 22 11"

5/8" 30 14"

3/4" 34 17"

h/2
1" 55 22"

SPLICE LENGTH (ACI 21.3.2.4, Class B Splice)

MINIMUM SPLICE LAP LENGTH (INCHES)


BAR fc' = 3,000 psi fy = 40,000 psi
DIA
TENSION COMPRESSION

3/8" 15 - TYPICAL COLUMN DETAIL


1/2" 20 9
Lap in this location, if required. Standard Hook
3/4" 30 15 spacing of stirrup within lap length 3" c/c.

1" 48 18 L/4

SPLICE LENGTH (ACI 21.3.2.4, Class B Splice)

MINIMUM SPLICE LAP LENGTH (INCHES)


BAR fc' = 3,000 psi fy = 60,000 psi
DIA
SLAB BEAM / COLUMN

1/2" 25 35 2 h (min) 2 h (min)


Stirrups as per actual
Stirrups @ 3" c/c Stirrups @ 3" c/c
5/8" - 44
L
3/4" - 55

1" - 70 TYPICAL BEAM DETAIL

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-ii E.mail: gsk.engineerz@gmail.com
GENERAL DETAILS WATER
STOPPER
R.C.C. COLUMN 2'-6" 9"

3T/8
#3@6"c/c
12" 12"

T/5

T/4

T
3"
9"

1
3
#3@12"c/c

9"
LB
#4 dowel bars @ 18"c/c
BRICK/BLOCK MASONRY
TYP. DETAIL OF CONSTRUCTION
DETAIL OF COLUMN WALL TIE DETAIL OF WINDOW JOINT IN RAFT & SLABS
PROJECTION
9"

6" THICH
FLOOR SLAB 2#3@AFTER EIGHT COURSE
BEAM TOP BARS
PRIMARY BEAM
BEAM HOOPS

1 1/2" CL.
TO END OF HOOKS BEAM BARS
ON BEAM BARS

OPEN OPEN
M

3'-"0 3'-"0
INTERIOR BEAM HOOPS SECONDARY BEAM INTERIOR BEAM HOOPS
BEAM BOTTOM BARS
(SMALLER SECTION BEAM)
SECTION AT M-M

12"X18" 1#4 (VERTICAL BARS)


PLINTH BEAM BOTH SIDE OF OPENING

PLAN OF BEAM TO BEAM DETAIL


NOTE:- SECTIONAL ELEVATION OF WALL
1. SHRINKAGE STRIPS MUST BE PROVIDED AT A SPACING OF NOT MORE THAN 100ft.
2. PREFERABLY SHRINKAGE STRIP BE PROVIDED AT CONSTRUCTION JOINT.
3. LOCATION OF SHRINKAGE STRIP BE KEPT AT A DISTANCE OF SPAN/3 FROM THE COLUMN SUPPORT. BEAM
4. 3ft WIDE PORTION OF SHRINKAGE STRIP BE KEPT OPEN FOR AT LEAST 3 WEEKS.THE OPENED PORTION SHOULD BE POURED AFTERWARDS.
5. REINFORCEMENT BE LAPPED IN SHRINKAGE STRIPS. ALTERNATIVELY BARS MAY BE SLIGHTLY BENT IN PLAN PARALLEL TO FACE OF SLAB.

#3@36"C/C
(ANCHOR BAR)
BEAM HOOPS
COLUMN HOOPS
1 1/2" CL.COVER
TO END OF HOOKS
ON BEAM BARS BEAM BARS
1 1/2" CL.
TO END OF HOOKS
ON BEAM BARS
PARTITION WALL
COL. HOOPS
Y Y
X X
Column ties are Column ties are
necessary in necessary in
this region this region
INTERIOR BEAM HOOPS
2#4
BEAM HOOPS
#3@36"C/C
2#4
(ANCHOR BAR) COLUMN

PLAN SECTION TYP. DETAIL OF CONNECTION OF


TYPICAL SEISMIC-RESISTANT JOINT DETAILS COLUMN AND BEAM JOINT FOR SEISMIC FORCE CONTROL PARTITION WALL WITH BEAM
SECTION AT X-X SECTION AT Y-Y & COLUMN FOR SEISMIC LOADING

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-iii E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-412"

A
197'

3
2'-5"
15' 14'-10 12" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-121" 4'-10 12"
'
12

15
B

'
A

4
"1
2
0
'-1
11
'

C
49

17
'-1
"

0
1
2

68
5
'
'
12
29'-1021"
LIFT LIFT
6'x10' 6'x10'

17
'-1
'
12
"

0
1
2

6
B

15
'
DENTAL COLLEGE DENTAL COLLEGE

12'

7
PORTION # 01 PORTION # 02

85'-6"
C

29'-1012"
D

4'-10 12"
6'-4 12"
8
E

17'-421"
11'-121"
5'-6"
F
9
15
BUILDING PORTIONS LAYOUT

15'
14

15'
13

15'
12

15'
11

15'
10

15'
HOSPITAL 9
PORTION # 01

13'-6"
197'
2'-5"
8
7

14'-1"
6

15'
5

15'
4

15'
3

14'-10 12"
2

15'
1

5'-6" 6'-4 12" 29'-10 12" 12' 29'-1012"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-01 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-4 12"

A
197'

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1012"

'
12

15
B

'
4
A
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3

"1
2
0
'-1
11
C
'
49

17
C-2

'-1
0
1
C-3

2
"
5

68
'
12

'
29'-10 12"
LIFT LIFT
6'x10' 6'x10' D
C-2

17
'-1
'
12

0
1
C-3

2
"
C-2 C-2 6
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-1
B
C-3

15
'
7

12'
C-2

C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2 C-2 C-3 C-3 C-3 C-3 C-3

85'-6"
C C-2 C-2

C-2
C-3 C-1
C-3 C-2

29'-1021"
C-2
C-3

C-2

C-2
C-1 C-1 C-1 C-1 C-1 C-1 C-2 C-2 C-3 C-3 C-3 C-3 C-3
D

4'-1021"
C-3

6'-421"
C-4 C-4 C-4 C-4 C-4 C-4 C-4 C-4 8
E

17'-4 12"
11'-1 12"
5'-6"
C-4 C-4 C-4
F C-2 C-2
9
15
LOWER GROUND FLOOR C-3 C-3 C-3 C-3

COLUMNS KEY PLAN

15'
14
C-4 C-3 C-3 C-3 C-3

15'
13
C-4 C-3 C-3 C-3 C-3

15'
12
C-4 C-3 C-3 C-3 C-3

15'
11
C-4 C-3 C-3 C-3 C-3

15'
10
C-4 C-2 C-2 C-3 C-3

15'
9
C-3

13'-6"
197'
2'-5"
C-4 C-2 C-2 C-3 C-3
8
7
C-4 C-1 C-1 C-1 C-1

14'-1"
C-4 C-1 C-1 C-1 C-1
6

15'
C-4 C-1 C-1 C-1 C-1
5

15'
C-4 C-1 C-1 C-1 C-1
4

15'
C-4 C-1 C-1 C-1 C-1
3

14'-1021"
C-1 C-1 C-1 C-1
2

15'
C-1 C-1 C-1
1

5'-6" 6'-421" 29'-1021" 12' 29'-10 12"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-02 E.mail: gsk.engineerz@gmail.com
#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c #3@6"c/c

16-#8 16-#8

2'-3"

2'-3"
12-#8 8-#8 8-#8

2'

2'

2'
4-#6 4-#6 4-#6 4-#6 4-#6

2' 2' 2'


2'-3" 2'-3"

#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c #3@6"c/c
2'-3"

2'-3"
20-#8 20-#8

2'

2'

2'
16-#8 16-#8 16-#8

2' 2' 2'


2'-3" 2'-3"

#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c #3@6"c/c

12-#8 12-#8 8-#8 4-#8 4-#8

1'-9"

1'-9"

1'-9"
2'

2'

4-#6 4-#6 4-#6 8-#6 8-#6

1'-9" 1'-9" 1'-9"


2' 2'

#3@6"c/c #3@6"c/c #3@6"c/c #3@6"c/c #3@6"c/c


1'-6"

1'-6"

1'-6"

1'-6"

1'-6"
16-#6 16-#6 12-#6 12-#6 8-#6

1'-6" 1'-6" 1'-6" 1'-6" 1'-6"

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-03 E.mail: gsk.engineerz@gmail.com
#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c
#3@6"c/c

2'-3"

2'-3"

1'-9"
24-#8 16-#8 12-#8 12-#8 12-#8

2'

2'
4-#6 4-#6 4-#6 4-#6

1'-9"
2' 2'
2'-3" 2'-3"

#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c
#3@6"c/c
2'-3"

2'-3"
16-#8 12-#8 8-#8 8-#8

1'-9"
12-#8

2'

2'
4-#6 4-#6 4-#6 4-#6

1'-9"
2' 2'
2'-3" 2'-3"

#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c
#3@6"c/c

1'-9"

1'-9"

1'-6"
16-#6 16-#6 12-#6 12-#6 12-#6
2'

2'

1'-6"
1'-9" 1'-9"
2' 2'

#3@6"c/c #3@6"c/c
#3@6"c/c #3@6"c/c #3@6"c/c

4-#8 4-#8
1'-9"

1'-9"

1'-6"

1'-6"

1'-6"
12-#6 8-#6 8-#6
8-#6 8-#6

1'-6" 1'-6" 1'-6"


1'-9" 1'-9"

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-04 E.mail: gsk.engineerz@gmail.com
B A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3
17'-421"

A
5' 197'
2'-5"
15' 14'-1012" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-10 12"

15

'
12
5'

5'
'

B
15 4
A '
"

'
12
1

02
23'-11"

'-1
11
5'

C
'

5'
5'
49

17
'-1
0
1
5'

2
"
10'-3 12" 5

68
'
'
12
29'-10 12"
LIFT LIFT
6'x10' 6'x10'

5'

17
5'
5'

'-1
'
12

0
1
2
"
6

15
'
7

12'

5'
30" THICK

'
12
85'-6"
C RAFT
15
'

5'

5'
15'

5'
30" THICK

29'-1021"
RAFT
3'-11"
5'

29'-10 12"

5'
1

" 2
1
22'-621"
5'

'-1
28
5' 33
'-1
0
2

" 1
D

4'-1021"
6'-4 12"

5'

5'
8

3'-11 12"

10'-3"
E 5'

17'-4 12"
11'-1 12"
15'-3"

5'-6"
15'-3"

6'

6'
22'-6 12" 5' 18'-11" 5'

5'

5'
F
60' 9

5'

5'
5'-6"

5'-6"
59'-5"

5'
15

15'-3"
42'-021" 5'
B A
6'

15'
14

15'
EXCAVATION & FOUNDATION LAYOUT PLAN
13

15'
60'
5'

12

15'
11

5'-6"

15'
10

15'
41'-6"
5' 30" THICK 9
RAFT

13'-6"
197'
5'

2'-5"
8
7

14'-1"
5'-6"

15'
A A
5

60'
5'

15'
4

15'
3
B B

14'-1021"
6'

15'-3"
5'
2

5'

15'
29'-1012"

15'
5'
1

5'

5'
5'-6" 6'-4 12" 29'-10 12" 12' 29'-1021"
85'-6" 5'
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-05 E.mail: gsk.engineerz@gmail.com
B A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-4 12"

A
5' 197'

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1012"
'
12

5'

5'
(8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (10'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

15
B

'
A

4
15
'

'
12
(8'x8')

#6@4"c/c
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

"1
0 2
'-1

23'-11"
(8'x8')
11

#6@4"c/c
5'

C
'

5'
5'
49

17
'-1
5' #6@4"c/c "

02
1
10'-312" #6@4"c/c

68
5
'
'
12
29'-1021"
LIFT LIFT (8'x8')

#6@4"c/c
6'x10' 6'x10'
D
(8'x8')

#6@4"c/c

5'
(8'x8') #6@4"c/c

#6@4"c/c

17
5'
5'

'

'-1
12
(8'x8')

#6@4"c/c
"

02
1
#6@4"c/c

6
(8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (10'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') #6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
#6@4"c/c
B (8'x8') (8'x8')

#6@4"c/c
#6@4"c/c

15
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

'
12'

7
#6@4"c/c #6@4"c/c

5'
(8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (10'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8')
30" THICK

#6@4"c/c
#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

'
12
85'-6"
C RAFT
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

5'

15
'
(8'x8') (8'x8')

#6@4"c/c

#6@4"c/c
(8'x8')

#6@4"c/c

5'
15' (8'x8')

#6@4"c/c
5'
#6@4"c/c #6@4"c/c
30" THICK

29'-1012"
(8'x8') #6@4"c/c

#6@4"c/c
RAFT #6@4"c/c
3'-11" (8'x8')

5' #6@4"c/c
5'

29'-1012"

5'
#6@4"c/c
(8'x8')

"1
#6@4"c/c
1 2
'-1

22'-6 12"
#6@4"c/c (8'x8')
28

#6@4"c/c
5'

33
(8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (10'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c

'-1
#6@4"c/c

0
1
2
"
D

4'-10 12"
(8'x8') #6@4"c/c

#6@4"c/c
6'-4 12"
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

5'

5'
8

3'-1121"

10'-3"
E 5'

17'-412"
#6@4"c/c

11'-121"
5'-6"
15'-3" 15'-3"

6'

6'
1
5' 18'-11" 5'

5'

5'
22'-6 " 2

F
60' 9

5'

5'
5'-6"

5'-6"
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
59'-5"

5'
15

15'-3"
42'-021" 5'
B A #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

6'

15'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
14
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

15'
ADDITIONAL BOTTOM REINFORCEMENT DETAIL PLAN (8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
13
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

15'
60'
5'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
12
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

15'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
11
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

5'-6"

15'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
10
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

15'
41'-6"
5' 30" THICK 9
RAFT

13'-6"
197'
5'
(8'x8') (8'x8') (8'x8') (8'x8')

2'-5"
#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
8
7
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

14'-1"
5'-6"

(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
6
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

15'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
A A
5
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

60'
5'

15'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
4
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

15'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
3
B #6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c B

14'-10 12"
6'
(8'x8') (8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c

#6@4"c/c
15'-3"
5'
2
#6@4"c/c #6@4"c/c #6@4"c/c #6@4"c/c

5'

15'
29'-1021"
(8'x8') (8'x8') (8'x8')

#6@4"c/c

#6@4"c/c

#6@4"c/c
15'
5'
1
#6@4"c/c #6@4"c/c #6@4"c/c

5'
5'
5'-6" 6'-421" 29'-1021" 12' 29'-1021"
85'-6" 5'
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-06 E.mail: gsk.engineerz@gmail.com
B A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3
17'-4 12"

A
5' 197'
1
2'-5"
15' 14'-10 "
2 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-121" 4'-1021"

'
12
5'

5'

15
B

'
A

4
15
'
"

'
12
1
2
0
23'-11"

'-1
11
5'

C
'

5'
5'
49

17
'-1
1

0
5'

2
68

"
10'-321" ' '
12

5
29'-1012"
LIFT LIFT
6'x10' 6'x10'

D
#6@8"c/c

5'

17
'

5'
5' 12

'-1
1

0
2
"

6
B #6@8"c/c

15
'
12'

7
5'
30" THICK

'
12
85'-6"
C RAFT

#
5'

6@

15
'
8"
c/

5'
#
c
15'

6@
5'

8"
30" THICK

c/
29'-10 12"

c
RAFT
3'-11"
5'

29'-10 12"

5'

"12
1
22'-621"

'-1
5'

28
5'

33
'-1
1

2
0
"
D

4'-1021"
6'-4 12"

5'

5'
8

3'-11 12"

10'-3"
E 5'

17'-4 12"
11'-112"
15'-3"

5'-6"
15'-3"

6'

6'
22'-621" 5' 18'-11" 5'

5'

5'
F
60' 9

5'

5'
5'-6"

5'-6"
59'-5"

5'
15

15'-3"
42'-0 12" 5'
B A
6'

15'
14

15'
FOUNDATION BOTTOM BARS DETAIL PLAN
13

15'
60'
5'

12

#6@8"c/c

15'
11

5'-6"

15'
10

15'
41'-6"
5' 30" THICK 9
RAFT

13'-6"
197'
5'

2'-5"
8
7

14'-1"
5'-6"

6
#6@8"c/c

15'
A A
5

60'
5'

15'
4

15'
3
B B

14'-1021"
6'

15'-3"
5'
2

5'

15'
29'-10 12"

15'
5'
1

5'

5'
5'-6" 6'-4 12" 29'-10 12" 12' 29'-10 12"
85'-6" 5'
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-07 E.mail: gsk.engineerz@gmail.com
B A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
5' 197' 17'-412"

3
2'-5"
15' 14'-10 12" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-121" 4'-10 12"

15

'
12
5'

5'
B '
A

4
15
'

'
12
"1
2
0
23'-11"

'-1
11
5'

C
17

'

5'
5'
49
'-1
02

1
5'

"
10'-3 12"

68
5
'
'
12
29'-10 12"
LIFT LIFT
6'x10' 6'x10'

D
#6@4"c/c

5'
17
'-1

5'
5' 0

'
12
2

" 1

6
B
#6@4"c/c #6@8"c/c #6@4"c/c #6@8"c/c #6@4"c/c 15
'
7

12'

5'
30" THICK

'
12
85'-6"
C
#
RAFT
6@

5'

15
8"

'
c /c #
6@

5'
15'
8"

5'
c/
30" THICK c

29'-1021"
RAFT
3'-11"
5'

29'-1021"

5'
"

1
2
1
22'-612"

'-1
5'

28
5'

33
'-1
"

0
1
2
D

4'-1012"
6'-421"

5'

5'
8

3'-11 12"

10'-3"
E 5'

17'-421"
11'-1 12"
15'-3"

5'-6"
15'-3"

6'

6'
1
5' 18'-11" 5'

5'

5'
22'-6 " 2

F
60' 9

5'

5'
5'-6"

5'-6"
59'-5"

5'
15

15'-3"
42'-012" 5'
B A
#6@4"c/c
6'

15'
14

15'
FOUNDATION TOP BARS DETAIL PLAN
13

15'
#6@8"c/c

60'
5'

12

15'
11

5'-6"

15'
10

15'
#6@4"c/c

41'-6"
5' 30" THICK 9
RAFT

13'-6"
197'
5'

2'-5"
8
7

14'-1"
5'-6"

6
#6@4"c/c

15'
A A
5

60'
5'

15'
#6@8"c/c

15'
3
B B

14'-1012"
6' #6@4"c/c

15'-3"
5'
2

5'

15'
29'-10 12"

15'
5'
1

5'

5'
5'-6" 6'-4 12" 29'-10 12" 12' 29'-1012"
85'-6" 5'
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-08 E.mail: gsk.engineerz@gmail.com
R.L R.L
RCC RCC RCC RCC RCC
COLUMN COLUMN COLUMN COLUMN COLUMN
As Per Architect

As Per Architect
#6@8" c/c #6@8" c/c
5' #6@4" c/c #6@4" c/c 5'
F.F.L F.F.L
3"

3"
2'-6"

2'-6"
30" TH. RAFT 30" TH. RAFT
3'

3'
3"

3"
P.C.C (1:4:8) P.C.C (1:4:8)

8'X8' Additional Bars 8'X8' Additional Bars 8'X8' Additional Bars 8'X8' Additional Bars
#6@4" c/c BW #6@4" c/c BW #6@4" c/c BW #6@4" c/c BW
3'

3'
36" THICK COMPACTED 36" THICK COMPACTED
#6@8" c/c STONE SOLING PROVIDE ADDITIONAL STONE SOLING #6@8" c/c
REINFORCEMENT
TYPICAL SECTION AT A-A UNDER ALL COLUMNS
#6@8" c/c #6@8" c/c
BOTTOM BARS BOTTOM BARS

R.L R.L
RCC RCC RCC RCC RCC
COLUMN COLUMN COLUMN COLUMN COLUMN
As Per Architect

As Per Architect
#6@4" c/c #6@4" c/c
5' #6@4" c/c #6@4" c/c 5'
F.F.L F.F.L
3"

3"
2'-6"

2'-6"
30" TH. RAFT 30" TH. RAFT
3'

3'
3"

3"
P.C.C (1:4:8) P.C.C (1:4:8)

8'X8' Additional Bars 8'X8' Additional Bars 8'X8' Additional Bars 8'X8' Additional Bars
#6@4" c/c BW #6@4" c/c BW #6@4" c/c BW #6@4" c/c BW
3'

3'
36" THICK COMPACTED 36" THICK COMPACTED
#6@8" c/c STONE SOLING PROVIDE ADDITIONAL STONE SOLING #6@8" c/c
REINFORCEMENT
TYPICAL SECTION AT B-B UNDER ALL COLUMNS
#6@8" c/c #6@8" c/c
BOTTOM BARS BOTTOM BARS

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-09 E.mail: gsk.engineerz@gmail.com
9" TH. WALL
R.L
#4@6"c/c (V) #4@12"c/c (V)

As Per Architect
#3@12"c/c (H) #3@12"c/c (H)
As Per Architect

RCC
COLUMN
OUT IN
SIDE SIDE

9" WIDE
WATER
STOPPER
3'
F.F.L F.F.L
3"
3"
2'-6"

2'-6"
3'

3'

30" TH. RAFT 30" TH. RAFT


3"

3"

P.C.C (1:4:8) P.C.C (1:4:8)

36" THICK COMPACTED STONE 36" THICK COMPACTED STONE


SOLING SOLING

8'X8' Additional Bars


#6@4" c/c BW #6@8" c/c
DETAIL OF RCC SHEAR WALL FOOTING DETAIL UNDER COLUMNS #6@8" c/c
BOTTOM BARS

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-10 E.mail: gsk.engineerz@gmail.com
TYPICAL SUMP PIT DETAIL
4'-0"

6" 3'-0" 6"

6"
9"
2-#6

6"
LANDING SLAB

15"
9"
SUBMERSIBLE PUMP #3@6"c/c
IN LET RAIN
WATER DRAIN OUT LET RAIN
WATER PIPE 3-#6

4'-0"

4'-0"
LANDING BEAM LB-1
DETAIL FOR STAIRS

6"
P.C.C (1:4:8) TYPICAL REINFORCEMENT DETAIL OF STAIR CASE
PLAN OF SUMP PIT

9" 9"
F.F.L
4'-0"
6" 3'-0" 6"

RAFT RAFT
#4@6"c/c

RAFT SLAB RAFT SLAB

#4@10"CC
D

#4@6"c/c
#4@12"CC
1'-6"

#4@10"c/c

#6@8"CC
8" Wide PVC
Water Stopper
4'-0"

#6@8"c/c
2'-3"

27" THICK R.C.C

#6@8"CC
3"

2'-3"
#6@8"c/c
4'-0"
3" 3"
3"

SECTIONAL DETAIL OF SUMP PIT

TYPICAL SECTION OF SEPTIC TANK


REINFORCEMENT DETAIL

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-11 E.mail: gsk.engineerz@gmail.com
15'
1' 6' 1' 6' 1' TYPICAL DETAIL OF LIFT
12" R C C WALL 12" R C C WALL
1'

#4@6"CC H 4-#6 4-#6 4-#6


#6@6"CC V #6@6"CC V
YY
#4@6"CC H #4@6"CC H
#6@6"CC V 2-#4 2-#4

2-#4 2-#4 2-#4 2-#4 #6@6"CC V #6@6"CC V #6@6"CC V


15" R C C WALL

15" R C C WALL

15" R C C WALL
#4@6"CC H #4@6"CC H #4@6"CC H
12'

10'

XX

2-#4 2-#4

4-#6 4-#6 4-#6

SECTION - XX
1'

OPENING DETAIL
LIFT PLAN

1' 1' 1'

6"
HOLES AS PER DESIGN

AS PER MACHINERY
REQUIRMENT
#6@6"c/c 4-#6 4-#6 4-#6
#6@6"CC V #6@6"CC V
OF LIFT
#4@6"CC H #4@6"CC H
#4@6"c/c 6" SLAB FOR
MOTORS
HOLES AS PER
#6@6"c/c #6@6"c/c DESIGN OF LIFT
#4@4"c/c
F.F.L F.F.L 6"
#6@6"CC V #6@6"CC V #6@6"CC V
#4@6"c/c
3"

3"

#4@6"c/c #4@6"CC H #4@6"CC H #4@6"CC H


2'-6"

2'-6"
3'

3'
1'-6"

1'-6"

1'-6" 1'-6"
AS PER LIFT REQUIRMENT
3"

3"

#8@4"c/c
#8@4"c/c
9"

9"

DOOR OPENING DOOR OPENING #4@6"CC H #4@6"CC H

#6@6"CC V #6@6"CC V
4-#6 4-#6 4-#6
4'

4'
3'

3'

#8@4"c/c
#8@4"c/c
3"

3"

SECTION - YY
TOP ROOF
2'-3" 13' 2'-3"
17'-6"
LIFT ROOF DETAIL
FOUNDATION SECTION
LIFT WELL DETAIL

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-12 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-4 12"

A
197'

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1012"
'
12

15
B

'
A

4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

"1
02
'-1
C 11

'
49

17
GF-B3
GF-B2

'-1
"

0
1
2
G

68
F-

B4

5
'
'
12
29'-1021"

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2
LIFT LIFT

B6

F-
6'x10' 6'x10'
D

B3

G
G

F-
F-

B6
G

17
GF-B4

B4

'-1
'
12
"

F-

0
1
F-
GF-B3
GF-B2

2
B4
B5
G

F-
GF-B6

6
G

G
F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B6
B4
F-

G
B

F-
B6

F-

B4
B5
G

15
F-

'
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B6
GF-B2

F-
12'

B5

7
B4
F-
B4

G
F-
F-

B4
B5
85'-6"

G
GF-B4

F-
C

G
G

F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B5

B4
F-
B4

G
F-
GF-B4

F-

F-
B4
B6
G

B6
F-

G
G

F-
B5

B4
F-
29'-10 12"

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B3

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

G
F-

B4
B6

F-

B3
G

F-

F-
B6

B4

G
F-
G

G
F-
B6
G
F-
B6

B4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

F-
D

4'-10 12"
G
6'-4 12"

B-4

B-4

B-4
8

GF-B6
GF-B4

GF-B4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4
E

17'-412"
GF-B4

11'-121"
5'-6"
GF-B2
F
GF-B6 9
15
LOWER GROUND FLOOR GF-B2 GF-B2 GF-B2

BEAMS KEY PLAN

GF-B4

GF-B4

GF-B4

GF-B4

15'
14
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
13
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
12
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
11
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
10
GF-B4 GF-B2

GF-B4
GF-B1

GF-B1

GF-B1

GF-B4

15'
GF-B3

GF-B2
GF-B3 GF-B3
9

GF-B1

GF-B1

GF-B1

GF-B4

13'-6"
197'
2'-5"
GF-B4 GF-B2 GF-B2 GF-B2 8
B-4 7
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

14'-1"
6
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
5
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2 GF-B2
4

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
B-4 GF-B2 GF-B2 GF-B2
3

GF-B4

GF-B4

GF-B4

14'-10 12"
GF-B4
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED. GF-B2 GF-B2 GF-B2
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
1

5'-6" 6'-421" 29'-1021" 12' 29'-1021"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-13 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-421"

A
197'

3
2'-5"
15' 14'-1012" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-10 12"
'
12

15
B

'
A

4
"1
2
0
'-1
11
C 17
#4@6"c/c #4@6"c/c

'
49
'-1
0

1
2
"

68
5
'

'
12
29'-1021"
LIFT LIFT
6'x10' 6'x10'

D
#4@8"c/c #4@8"c/c 17
'-1
0

'
12

1
2
"

6
B #4@6"c/c
#4@6"c/c #4@6"c/c

15
'
12'
#4@6"c/c

7
/c

85'-6"
c
C 6"
4@
#
#4@8"c/c

#4@6"c/c #4@6"c/c

29'-10 12"
#4@6"c/c
D

4'-10 12"
6'-4 12"
#4@6"c/c 8
E

17'-412"
11'-121"
5'-6"
F
9
15
LOWER GROUND FLOOR PLAN
SLAB REINFORCEMENT DETAIL

15'
14

15'
#4@6"c/c #4@6"c/c #4@6"c/c

13

15'
12
#4@8"c/c

15'
11

15'
10

15'
#4@8"c/c
9

13'-6"
197'
2'-5"
8
7

14'-1"
6

#4@6"c/c #4@6"c/c #4@6"c/c

15'
5
#4@8"c/c

15'
4

15'
3
BOTTOM BARS

14'-10 12"
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

15'
1

5'-6" 6'-4 12" 29'-10 12" 12' 29'-1012"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-14 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
197' 17'-421"

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-10 12"

'
12

15
B

'
A

4
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

"1
7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

2
0
'-1
11
C
'
49

17
'-1
0
1
/c

2
"
c
6"

68
4@
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

5
'
'
12
29'-10 12"
LIFT LIFT

#
6'x10' 6'x10' 4'

D
3'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

#
4@
/c

6"
c
6"

c/

17
c
4@
#4@6"c/c #4@6"c/c

'-1
'

3'
12

0
#

1
c

2
c/
4@

"
3' 4'

4'

6"
9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

6"

4@

6
c
4'-6" 4'-6" 4'-6"

/c
#4@6"c/c

#
5'

c
#4@6"c/c #4@6"c/c

c
c/

c/

3'
3'

3'

6"

4'
6"
3'

#
4@

4@

4@
B

5'

#
#

6"
#

4@
15

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

c/
4@

4'
'

c
3'
3'

6"

4'
#4@8"c/c #4@8"c/c

5'

5'

6"
#4@6"c/c

c/
c/

#
c
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4@
12'

c
c/

7
c/
5'

6"

4'

3'

6"
6"
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 7'-6" 8'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 3'

4@

4'
c/
4@
5'

c
#
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

#
#
4@

c
85'-6"

4'

c/
3'

6"

4'

6"
C

3'
#

c/

4@
4@

#
c
6"

c
3'

c/

c/
c/

5'

4'
6"

6"
c

4'
#4@6"c/c

4@

4@
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

5'

3'
#

#
#
4@

c
4'

c/
4'
3'

6"
6"

3'

4@
c/

#
c

4@

#
c
3'

c/

4'

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4'
c/
4@
29'-1021"

c
3'
#
4@

c
6"

c/
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" c/

6"
c

4@
3'
#

#
4@
4'

3'

6"

4'
c/
c
c

5'
c/

5'
6"

#
7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

4@
3'

4@
#

6"
4@

c/
c
6"

4'
D

4'-10 12"
c/
c
6'-421"
#4@8"c/c #4@8"c/c #4@6"c/c

5'
8
E #4@6"c/c

17'-421"
7'-6" 8'-6" 6'

11'-1 12"
5'-6"
#4@6"c/c

3'-6"
6'
F #4@6"c/c

5'
9
15
LOWER GROUND FLOOR PLAN #4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
SLAB REINFORCEMENT DETAIL #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
14

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
13

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
12

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
11

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"

4'-6"
10

4'-6"

4'-6"
#4@8"c/c

8'-6"
#4@8"c/c

8'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

15'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"
#4@6"c/c

4'-6"
#4@6"c/c

4'-6"
#4@6"c/c

3'-6"
9

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

13'-6"
197'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"
#4@8"c/c

8'-6"
8'-6"
#4@6"c/c #4@8"c/c #4@6"c/c

4'-6"

4'-6"

2'-5"
8
7
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-1"
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
6

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
5

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
4

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
3

4'-6"

4'-6"

4'-6"
TOP BARS
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-1012"
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
NOTE:
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.

4'-6"
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.
#4@8"c/c

15'
3'-6" 3'-6"

#4@6"c/c

4'-6"
1

5'-6" 6'-4 12" 29'-1012" 12' 29'-1021"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-15 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
197' 17'-4 12"

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1021"

'
12

15
B

'
A

4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

"1
2

0
'-1
11
C
'
49

17
GF-B2

GF-B3

'-1
0
1
2
"
G

68
F-

B4

5
'
'
12
29'-10 12"

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2
LIFT LIFT

B6

F-
6'x10' 6'x10'

G
B3

F-
F-

B6
G
X

17
GF-B4

B4

'-1
'
12

F-

0
1
F-
GF-B2

GF-B3

2
"
B4
B5
G

F-
GF-B6

6
G

G
F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B6
B4
F-

G
B

F-
B6

F-

B4
B5
G

15
F-

'
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B6
GF-B2

F-
12'

B5

7
B4
F-
B4

G
F-
F-

B4
B5
85'-6"

G
GF-B4

F-
C

G
G

F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B5

B4
F-
B4

G
F-
GF-B4

F-

F-
B4
B6
G

B6
F-

G
G

F-
B5

B4
F-
29'-1021"

GF-B3
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

G
F-

B4
B6

F-

B3
G

F-

F-
B6

B4

G
F-
G

G
F-
B6
G
F-
B6

B4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

F-
D

4'-10 12"
G
6'-421"

B-4

B-4

B-4
8

GF-B6
GF-B4

GF-B4
GF-B4 GF-B4 GF-B4 GF-B4 PODIUM GF-B4 GF-B4 GF-B4 GF-B4
E

17'-421"
GF-B4
DOUBLE HEIGHT

11'-1 12"
5'-6"
GF-B2
F
GF-B6 9
15
GROUND FLOOR GF-B2 GF-B2 GF-B2

BEAMS KEY PLAN

GF-B4

GF-B4

GF-B4

GF-B4

15'
14
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
13
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
12
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
11
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
10
GF-B4 GF-B2

GF-B4
GF-B1

GF-B1

GF-B1

GF-B4

15'
GF-B3

GF-B2
PODIUM
GF-B3 GF-B3
DOUBLE
HEIGHT
9

GF-B1

GF-B1

GF-B1

GF-B4

13'-6"
197'
2'-5"
GF-B4 GF-B2 GF-B2 GF-B2 8
B-4 7
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

14'-1"
6
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
5
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2 GF-B2
4

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
B-4 GF-B2 GF-B2 GF-B2
3

GF-B4

GF-B4

GF-B4

14'-10 12"
GF-B4
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED. GF-B2 GF-B2 GF-B2
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
1

5'-6" 6'-421" 29'-1021" 12' 29'-10 12"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-16 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
197' 17'-421"

3
2'-5"
15' 14'-10 12" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-121" 4'-10 12"

'
12

15
B

'
A

4
"1
2
0
'-1
11
'

C
#4@6"c/c #4@6"c/c 49 17
'-1
02

" 1

68
5
'
'
12
29'-10 12"
LIFT LIFT
6'x10' 6'x10'

D
#4@8"c/c #4@8"c/c 17
'-1

X
02

'
12

" 1

6
B #4@6"c/c
#4@6"c/c #4@6"c/c

15
'
12'
#4@6"c/c

7
85'-6"

c
c/
C

6"
4@
#
#4@8"c/c

#4@6"c/c #4@6"c/c

29'-1021"

X
#4@6"c/c
D

4'-10 12"
6'-421"
PODIUM #4@6"c/c 8
E

17'-421"
DOUBLE HEIGHT

11'-1 12"
5'-6"

F
9
15
GROUND FLOOR PLAN
SLAB REINFORCEMENT DETAIL

15'
14

15'
#4@6"c/c #4@6"c/c #4@6"c/c

13

15'
12
#4@8"c/c

15'
11

15'
10

15'
PODIUM #4@8"c/c
DOUBLE
HEIGHT
9

13'-6"
197'
2'-5"
8
7

14'-1"
6

#4@6"c/c #4@6"c/c #4@6"c/c

15'
5
#4@8"c/c

15'
4

15'
3
BOTTOM BARS

14'-10 12"
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

15'
1

5'-6" 6'-4 12" 29'-10 12" 12' 29'-1012"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-17 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-4 12"

A
197'

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1012"
'
12

15
B

'
A

4
"1
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"
02
'-1
11

C
'
49

17
'-1
"

02
1
c /c
6"

68
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4@

5
'
'
12
29'-1021"
LIFT LIFT

#
6'x10' 6'x10'
D

4'

3'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

#
4@
c

6"
c/

c/
6"

17
c
4@

X
#4@6"c/c #4@6"c/c

'

'-1
3'
12

#
"

02
#

1
4'

4@
9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

3'

4'
6"

6
c
4'-6" 4'-6" 4'-6"

/c
#4@6"c/c

5'

c
#4@6"c/c #4@6"c/c 4'

/c
c/

3'
3'

3'

c
6"

6"

#
4@

4@

4@
B

3'
#

5'

#
4@

6"
4'

#
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"
6" 4

c/
3'

4@
c/ '

15
#4@8"c/c #4@8"c/c 3'

5'

5'

6"
#4@6"c/c c

'
c/

#
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

c
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4@
12'

c/

7
c/
4'

5'

6"

4'

3'

6"
6"
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 7'-6" 8'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4@

c/
4@
5'

3'

c
#
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

#
#
4@

c
4'

85'-6"

4'

c/
3'

6"

6"
C

3'
c/

4@
c

#
4@

#
c
5'

c
c/

c/

3'
4'
6"

6"
6"

4'
#4@6"c/c

4@

c/
4@
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

5'

c
3'
#

#
#
/c

4@
c

4'
6"

4'
3'

6"

3'
4@

c/

#
c
#

4@
3'

c
c/

4'

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4'
c/
4@
29'-10 12"

c
3'

#
#
4@

c
c/
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

6"
6"

4@
3'
c/
c

#
4@
4'

3'

6"

4'
c/
c
5'

c
c/

5'
6"

#
7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

4@

4@
3'
#
4@

6"
6"

c/
c/

c
4'
D c

4'-10 12"
6'-4 12"
#4@6"c/c

5'
8

6'

6'

6'

6'

6'

6'

6'

6'
PODIUM
E #4@6"c/c

17'-412"
DOUBLE HEIGHT 6'

11'-121"
5'-6"
6'
F #4@6"c/c

5'
9
15
GROUND FLOOR PLAN #4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
SLAB REINFORCEMENT DETAIL #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
14

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
13

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
12

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
11

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"

4'-6"
10

4'-6"

4'-6"
#4@8"c/c

8'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

15'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"
#4@6"c/c

4'-6"
#4@6"c/c

4'-6"
PODIUM
DOUBLE
HEIGHT
9

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

13'-6"
197'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"

8'-6"
#4@6"c/c #4@8"c/c #4@6"c/c

4'-6"

4'-6"

2'-5"
8
7
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-1"
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
6

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
5

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
4

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
3

4'-6"

4'-6"

4'-6"
TOP BARS
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-10 12"
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
NOTE:
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.

4'-6"
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.
#4@8"c/c

15'
3'-6" 3'-6"

#4@6"c/c

4'-6"
1

5'-6" 6'-421" 29'-1021" 12' 29'-1021"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-18 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-4 12"

A
197'

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1012"
'
12

15
B

'
A

4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

"1
02
'-1
11

C
'
49

17
GF-B3
GF-B2

'-1
02
1 "
G

68
F-

B4

5
'
'
12
29'-1021"

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2
LIFT LIFT

B6

F-
6'x10' 6'x10' D

G
B3

F-
F-

B6
G

17
GF-B4 X

B4

'-1
'
12

F-

02
1 "
F-
GF-B2

GF-B3

B4
B5
G

F-
GF-B6

6
G

G
F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B6
B4
F-

G
B

F-
B6

F-

B4
B5
G

15
F-

'
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B6
GF-B2

F-
12'

B5

7
B4
F-
B4

G
F-
F-

B4
B5
85'-6"

G
GF-B4

F-
C

G
G

F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B5

B4
F-
B4

G
F-
GF-B4

F-

F-
B4
B6
G

B6
F-

G
G

F-
B5

B4
F-
29'-1012"

GF-B3
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

G
F-

B4
B6

F-

B3
G

F-

F-
B6

B4

G
F-
G

G
F-
B6
G
F-
B6

B4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

F-
D

4'-10 12"
G
6'-412"

B-4

B-4

B-4
8

GF-B6
GF-B4

GF-B4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4
E

17'-421"
GF-B4

11'-1 12"
5'-6"
GF-B2
F
GF-B6 9
15
FIRST FLOOR GF-B2 GF-B2 GF-B2

BEAMS KEY PLAN

GF-B4

GF-B4

GF-B4

GF-B4

15'
14
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
13
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
12
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
11
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
10
GF-B4 GF-B2

GF-B4
GF-B1

GF-B1

GF-B1

GF-B4

15'
GF-B3

GF-B2
GF-B3 GF-B3
9

GF-B1

GF-B1

GF-B1

GF-B4

13'-6"
197'
2'-5"
GF-B4 GF-B2 GF-B2 GF-B2 8
B-4 7
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

14'-1"
6
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
5
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2 GF-B2
4

GF-B4

GF-B4

GF-B4

GF-B4

GF-B4

15'
B-4 GF-B2 GF-B2 GF-B2
3

GF-B4

GF-B4

GF-B4

14'-10 12"
GF-B4
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED. GF-B2 GF-B2 GF-B2
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
1

5'-6" 6'-421" 29'-1021" 12' 29'-10 12"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-19 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-421"

A
197'

3
2'-5"
15' 14'-1012" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-121" 4'-10 12"

'
12

15
B

'
A

4
"1
2
0
'-1
11
'

C
#4@6"c/c #4@6"c/c 49 17
'-1
02

" 1

68
5
'
'
12
29'-1021"
LIFT LIFT
6'x10' 6'x10'

D
#4@8"c/c #4@8"c/c 17
'-1

X
02

'
12

" 1

6
B #4@6"c/c
#4@6"c/c #4@6"c/c

15
'
12'
#4@6"c/c

7
85'-6"

c
c/
C

6"
4@
#4@8"c/c

#
#4@6"c/c #4@6"c/c

29'-1021"

X
#4@6"c/c
D

4'-10 12"
6'-421" #4@6"c/c 8
E

17'-421"
11'-1 12"
5'-6"

F
9
15
FIRST FLOOR PLAN
SLAB REINFORCEMENT DETAIL

15'
14

15'
#4@6"c/c #4@6"c/c #4@6"c/c

13

15'
12
#4@8"c/c

15'
11

15'
10

15'
#4@8"c/c
9

13'-6"
197'
2'-5"
8
7

14'-1"
6

#4@6"c/c #4@6"c/c #4@6"c/c

15'
5
#4@8"c/c

15'
4

15'
3
BOTTOM BARS

14'-10 12"
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

15'
1

5'-6" 6'-4 12" 29'-10 12" 12' 29'-1012"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-20 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-421"

A
197'

3
2'-5"
15' 14'-10 12" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-121" 4'-10 12"
'
12

15
B

'
A

4
"1
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

2
0
'-1
11
'

C
49

17
'-1
0
1 "
c

2
c/
6"

68
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4@

5
'
'
12
29'-1021"
LIFT LIFT

#
6'x10' 6'x10'

4'

3'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

#
4@
/c

6"
c

c
6"

/c

17
4@

X
#4@6"c/c #4@6"c/c

'-1
'

3'
12

0
#

1
2
4@

"
3'

4'
9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

4'
6"

6
c/
4'-6" 4'-6" 4'-6" #4@6"c/c

c
5'

/c
#4@6"c/c #4@6"c/c 3' #

c
c

c/
3'

3'

6"

4'
6"
4

4@
@

4@
B

3'
6"

5'

#
#
c/

4@
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"
c

4@

4'

3'

15
6"
#4@8"c/c #4@8"c/c

4'
5'

5'

6"

3'
#4@6"c/c

c/

'
c/

#
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

c
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4@
12'

c
c/

7
c/
5'

6"

4'

3'

6"
6"
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 7'-6" 8'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4@

4'
c/
4@
5'

3'
#

c
#
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"
4@

c
6"

85'-6"

4'

c/
c/

3'

4'

6"
C c

3'

4@
#
4@

#
c

c
c/

c/

3'
5'

4'
6"

6"
6"

4'
#4@6"c/c

4@

c/
4@
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

5'

c
3'
#

#
#
4'

4@

c
3'

c/
3'

4'

6"
6"

4@
c/

#
c

4@

#
4'

c
c/

3'

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4'
c/
4@
29'-1012"

c
3'

#
#
4@

c
c/
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

6"
6"

4@
3'
#

c/
4@

#
4' 6"
3' c/ 4'
c

c
5'

5'
c/
6"

#
7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

4@

4@
3'
#

6"
4@

c/
c
6"

4'
D

4'-10 12"
c/
c
6'-4 12"
#4@8"c/c #4@8"c/c #4@6"c/c

5'
8

6'

6'

6'

6'

6'

6'

6'

6'
E #4@6"c/c

17'-421"
7'-6" 8'-6" 6'

11'-1 12"
5'-6" #4@6"c/c

3'
6'
F #4@6"c/c

5'
9
15
FIRST FLOOR PLAN #4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
SLAB REINFORCEMENT DETAIL #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
14

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
13

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
12

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
11

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"

4'-6"
10

4'-6"

4'-6"
#4@8"c/c

8'-6"
#4@8"c/c

8'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

15'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"
#4@6"c/c

4'-6"
#4@6"c/c

4'-6"
#4@6"c/c

3'-6" 9

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

13'-6"
197'
#4@8"c/c
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"

8'-6"

8'-6"
#4@6"c/c #4@8"c/c #4@6"c/c

4'-6"

4'-6"

2'-5"
8
7
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-1"
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
6

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
5

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
4

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
6' 7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
3

4'-6"

4'-6"

4'-6"
TOP BARS
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-10 12"
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
NOTE:
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.

4'-6"
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.
#4@8"c/c

15'
3'-6" 3'-6"

#4@6"c/c

4'-6"
1

5'-6" 6'-4 12" 29'-10 12" 12' 29'-1012"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-21 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
197' 17'-4 12" A

3
2'-5"
15' 14'-10 12" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-112" 4'-1021"

'
12

15
B

'
A

4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

"1
2
0
'-1
11
C
'
49

17
GF-B2

GF-B3

'-1
1

0
2
"
G

68
F-

B4

5
'
'
12
29'-10 12"

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2
LIFT LIFT

B6

F-
6'x10' 6'x10'

G
B3

F-
F-

B6
G

17
GF-B4

X
B4

'-1
'
12
1

F-

0
F-
GF-B3
GF-B2

2
"
B4
B5
G

F-
GF-B6

6
G

G
F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B6
B4
F-

G
B

F-
B6

F-

B4
B5
G

15
F-

'
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B6
GF-B2

F-
B5
12'

7
B4
F-
B4

G
F-
F-

B4
B5
85'-6"

G
GF-B4

F-
C

G
G

F-
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

B5

B4
F-
B4

G
F-
GF-B4

F-

F-
B4
B6
G

B6
F-

G
G

F-
B5

B4
F-
29'-1021"

GF-B3
GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

GF-B2

G
F-

B4
B6

F-

B3
G

F-

F-
B6

B4

G
F-
G

G
F-
B6
G
F-
B6

B4
GF-B4 GF-B4 GF-B4 GF-B4 GF-B4 GF-B1 GF-B1 GF-B4 GF-B4 GF-B4 GF-B4 GF-B4

F-
D

4'-1012"
G
6'-421"
TERRACE TERRACE 8

GF-B6
TERRACE
E

17'-4 12"
GF-B4

11'-1 12"
5'-6"

F
GF-B6 9
15
SECOND & THIRD FLOOR GF-B2 GF-B2 GF-B2

BEAMS KEY PLAN

GF-B4

GF-B4

GF-B4

GF-B4

15'
14
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

15'
13
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

15'
TERRACE
12
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

15'
11
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
10
GF-B2

GF-B4
GF-B1

GF-B1

GF-B1

GF-B4

15'
GF-B3 GF-B3 GF-B3
TERRACE 9

GF-B1

GF-B1

GF-B1

GF-B4

13'-6"
197'
2'-5"
GF-B2 GF-B2 GF-B2 8
7
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

14'-1"
6
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

15'
5

TERRACE
GF-B2 GF-B2 GF-B2

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2 GF-B2
4

GF-B4

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2 GF-B2
3

GF-B4

GF-B4

GF-B4

14'-1021"
GF-B4
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED. GF-B2 GF-B2 GF-B2
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

GF-B4

GF-B4

GF-B4

15'
GF-B2 GF-B2
1

5'-6" 6'-421" 29'-1021" 12' 29'-10 12"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-22 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
17'-421"

A
197'

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-10 12"
'
12

15
B

'
A

4
1

"
2
0
'-1
11
C
#4@6"c/c #4@6"c/c

'
49

17
'-1
"

02
1

68
5
'

'
12
29'-1021"
LIFT LIFT
6'x10' 6'x10'

D
#4@8"c/c #4@8"c/c

17
X
'

'-1
12
"

0
1
2

6
B #4@6"c/c
#4@6"c/c #4@6"c/c

15
'
12'
#4@6"c/c

7
c
c/

85'-6"
C 6"
4@
#
#4@8"c/c

#4@6"c/c #4@6"c/c

29'-10 12"

X
#4@6"c/c
D

4'-10 12"
6'-4 12"
TERRACE TERRACE 8
TERRACE #4@6"c/c
E

17'-412"
11'-121"
5'-6"
F
9
15
SECOND & THIRD FLOOR PLAN
SLAB REINFORCEMENT DETAIL

15'
14

15'
#4@6"c/c #4@6"c/c #4@6"c/c

13

15'
TERRACE
12
#4@8"c/c

15'
11

15'
10

15'
#4@8"c/c
TERRACE 9

13'-6"
197'
2'-5"
8
7

14'-1"
6

#4@6"c/c #4@6"c/c #4@6"c/c

15'
5

TERRACE
#4@8"c/c

15'
4

15'
3
BOTTOM BARS

14'-10 12"
NOTE:
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.

15'
1

5'-6" 6'-4 12" 29'-1012" 12' 29'-1021"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-23 E.mail: gsk.engineerz@gmail.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2
197' 17'-4 12"

3
2'-5"
15' 14'-1021" 15' 15' 15' 14'-1" 13'-6" 15' 15' 15' 15' 15' 15' 11'-1 12" 4'-1021"

'
12

15
B

'
A

4
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

"1
7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"
2

0
'-1
11
C
'
49

17
'-1
1

0
c
c/

2
"
6"

68
4@
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

5
'
'
12
29'-10 12"
LIFT LIFT

#
6'x10' 6'x10'

D
3'

4'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

#
4@
c
c/

6"
6"

c/

17
4@

X
#4@6"c/c #4@6"c/c

'-1
'

3'
12
# 1

0
#

2
4@

"
4'
9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

3'

4'
6"

6
c
4'-6" 4'-6" 4'-6"

/c
#4@6"c/c

5'

/c
#4@6"c/c #4@6"c/c 4'

c
c

c/

3'
3'

3'

6"

6"

#
4@

4@

4@
B

3'
5'

#
#

6"
#

4@
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

c/
3'

4@

4'

c
3'

15
6"

4'
#4@8"c/c #4@8"c/c

5'

5'

6"
#4@6"c/c

c/

'
c/
7

#
c
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4@
12'

c
c/

c/
5'
4'

6"

4'

3'

6"
6"
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 7'-6" 8'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4@

c/
4@
5'

3'

c
#
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

3'-6"

#
#
4@

c
85'-6"

4'

c/
3'

6"

4'

6"
C

3'
c/

4@
c

#
c
c/

4@

#
5'

c
6"

c/
4'

3'
4'

6"
6"
#4@6"c/c 4@

c/
3'

4@
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

5'

c
#

#
#
4@

c
4'

c/
4'
3'

6"
6"

3'
#

4@
c/
4@

#
6"

c
c/
c

4'

3'
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c /c

6"
#4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c #4@6"c/c

4'
4@
29'-1021"

X
3'
#
4@

c
6"

c/
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"

4'
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" c/

6"
c 3'

4@
#

#
4@
4'

3'

6"

4'
c/
c
c

5'
c/

5'
6"

#
7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"

7'-3"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

4@
3'

4@
#

6"
4@

c/
c
6"

4'
D

4'-1012"
c/
c
6'-421"
5' #4@6"c/c
TERRACE TERRACE 8
TERRACE
E #4@6"c/c

17'-4 12"
6'

11'-1 12"
5'-6" 6'
F #4@6"c/c

5'
9
15
SECOND & THIRD FLOOR PLAN #4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
SLAB REINFORCEMENT DETAIL #4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
14

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
13

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
TERRACE
12

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
11

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"

4'-6"
10

4'-6"

4'-6"
#4@8"c/c

8'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

15'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"
#4@6"c/c

4'-6"
#4@6"c/c

4'-6"
TERRACE 9

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@6"c/c

13'-6"
197'
7'-3" 9'-6" 3'-6" 4'-6" 4'-6"

8'-6"
#4@6"c/c #4@8"c/c #4@6"c/c

4'-6"

4'-6"

2'-5"
8
7
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-1"
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
6

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
5

TERRACE

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
4

4'-6"

4'-6"

4'-6"
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

15'
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
3

4'-6"

4'-6"

4'-6"
TOP BARS
#4@8"c/c #4@8"c/c #4@8"c/c #4@8"c/c

14'-1012"
7'-3" 9'-6" 3'-6" 3'-6" 9'-6" 7'-3"
NOTE:
#4@6"c/c #4@6"c/c #4@6"c/c

4'-6"

4'-6"

4'-6"
*ALL SLABS ARE 7" THICK EXCEPT MENTIONED.
*SHADED AREAS ARE SUNKEN SLABS SO CHANGE SLAB LEVELS ACCORDINGLY. 2
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.

4'-6"
*STAIRS, RAMPS & OTS/DUCTS WILL BE CONSTRUCTED ACCORDINGLY AS PER ARCHITECT DRAWINGS.
#4@8"c/c

15'
3'-6" 3'-6"

#4@6"c/c

4'-6"
1

5'-6" 6'-421" 29'-1021" 12' 29'-10 12"


85'-6"
F E D C B A

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-24 E.mail: gsk.engineerz@gmail.com
L
L/3 4-#8+
L/3 L/3 1'-6" 1'-6"
4-#8+4-#6 3-#6 3-#6 4-#8+4-#6 4-#8+4-#6 3-#6
1-#6 4-#8+4-#6 4-#8+1-#6
(EXTRA) (EXTRA) (EXTRA)
7"

7"

7"
2'-1"

2'-1"
#3@4"c/c
1'-6"

1'-6"

1'-6"
#3@4"c/c #3@4"c/c

4-#8+1-#6 1 2 4-#8+1-#6 1 4-#8+1-#6 4#8+1-#6 1 4-#8+1-#6 4-#8+4-#6


3-#6(EXTRA)

3/4*L

30'-0" 12'-0" 30'-0"


11' 11' 11' 11'
2-#8+5-#6 2-#8 5-#6 2-#8 2-#8+5-#6 2-#8+5-#6 2-#8+5-#6 2-#8 5-#6 2-#8 2-#8+5-#6
(EXTRA) (EXTRA) (EXTRA) (EXTRA)
7"

7"
1'-3"

1'-3"
#3@4"c/c #3@4"c/c #3@4"c/c

3-#8+2-#6 3 4 3-#8+2-#6 3 3-#8+2-#6 3-#8+2-#6 3 3-#8+2-#6 3 3-#8+2-#6 4 3 3-#8+2-#6


3-#6(EXTRA) 3-#6(EXTRA)

23'-6" 23'-6"

L
L/3 L/3 L/3
2-#8+5-#6 2-#8 5-#6 2-#8 2-#8+5-#6 2-#8+5-#6 2-#8
(EXTRA) (EXTRA) (EXTRA)
7"
1'-3"

#3@4"c/c

2#8+3-#6 5 6 2#8+3-#6 5 2#8+3-#6 2#8+3-#6 5


3-#6(EXTRA)

3/4*L

1'-3" 1'-3" 1'-3" 1'-3"


2-#8+5-#6 5-#6 2-#8+5-#6 5-#6
7"

7"

7"

7"
1'-10"

1'-10"

1'-10"

1'-10"
1'-3"

1'-3"

1'-3"

1'-3"
#3@4"c/c #3@4"c/c #3@4"c/c #3@4"c/c

3-#8+2-#6 3-#8+5-#6 2-#8+3-#6 2-#8+6-#6

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-25 E.mail: gsk.engineerz@gmail.com
L
1'-3" 1'-3"
4-#6 4-#6 4-#6 4-#6 4-#6 4-#6
7"

7"

7"
1'-10"

1'-10"
#3@6"c/c
1'-3"

1'-3"

1'-3"
#3@6"c/c #3@6"c/c

5-#6 7 8 5-#6 7 5-#6 5#6 7 5-#6 5-#6

L
L/3 2-#6 L/3 1'-3" 1'-3"
7-#8 2-#8 5-#8 2-#8 7-#8 5-#8
7-#8
(EXTRA) (EXTRA)
7"

7"

7"
2'-4"

2'-4"
2-#6 2-#6
1'-9"

1'-9"

1'-9"
#3@6"c/c #3@6"c/c #3@6"c/c

5-#8 9 10 5-#8 9 5-#8 5-#8 8-#8


3-#8(EXTRA)

3/4*L

L
L/3 L/3 L/3 1'-3" 1'-3"
6-#6 2-#6 4-#6 2-#6 6-#6 6-#6 2-#6 4-#6
4-#6
(EXTRA) (EXTRA) (EXTRA)
7"

7"

7"
1'-10"

1'-10"
1'-3"

1'-3"

1'-3"
#3@6"c/c #3@6"c/c #3@6"c/c

4-#6 11 12 4-#6 11 4-#6 4-#6 11 4-#6 6-#6


2-#6(EXTRA)

3/4*L

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-26 E.mail: gsk.engineerz@gmail.com
7" thick
slab

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-27 E.mail: gsk.engineerz@gmail.com
THIRD FLOOR SLAB

BEAM BEAM

7" SUNKEN
#4@6"c/c SLAB #4@6"c/c
#3@12"c/c #3@12"c/c
UP TO SECOND FLOOR SLAB
SAND FILL

BEAM BEAM

#4@8"c/c
#4@6"c/c

TYPICAL SUNKEN SLAB DETAIL


TYPICAL SECTION OF BATH ROOMS

1'
3-#6
7"

10"
#3@6"c/c #3@6"c/c

3"
7"
SUNKEN SLAB
7"

4-#6

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-28 E.mail: gsk.engineerz@gmail.com
TYPICAL LINTEL BEAM DETAILS
6" 2'-6" 6" 1' 6' 1'

2'-6" OPENING 6'-0" OPENING

9" 3'-6" 9" 1'-3" 8' 1'-3"

3'-6" OPENING 8'-0" OPENING

6" 3' 6" 1'-6" 10' 1'-6"

3'-0" OPENING 10'-0" OPENING

1' 4' 1' 1'-6" 12' 1'-6"

4'-0" OPENING 12'-0" OPENING

9"
421" 9" 9" 4-#6
2-#4 3-#4 4-#4

9"
#3@9"c/c
6"

6"

6"
#3@9"c/c #3@9"c/c #3@6"c/c

2-#4 3-#4 4-#4 4-#6

ON DOORS UP TO ON WINDOWS FROM ON WINDOWS FROM


4'-0" TO 6'-0" OPENING 5'-0" OPENING 4'-0" TO 8'-0" OPENING 9'-0" TO 12'-0" OPENING

PLANNING - TESTING - DESIGNING & DEVELOPMENT


ESTABLISHMENT OF SAIDU COLLEGE OF DENTISTRY STR Z.A GSK-CB-05 APRIL, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
IN THE EXISTING SAIDU MEDICAL COLLEGE Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ADP NO.410/190460 (2019-20) ENGINEERZ
SAIDU/SWAT T.Z.R N.T.S STR-29 E.mail: gsk.engineerz@gmail.com

You might also like