You are on page 1of 1

4500LITERS DIESEL DAY TANK

2165(L)x1345(W)x1940(H)

C.S. CARBON STEEL SCH SCHEDULE


R/A RAISE ABOVE D/D DROP DOWN
FFL FINISH FLOOR LEVEL IL INVERT LEVEL
Q.N.D QATAR NATIONAL DATUM N NORTHING (COORDINATE)
BOP BOTTOM OF PIPE E EASTING (COORDINATE)
uPVC UNPLASTICIZED POLYVINYL
CHLORIDE

SECTION X-X
SCALE-1:20

4500 LITERS DAY TANK

SECTION A-A SECTION B-B


SCALE-1:30 SCALE-1:30

DRAWING NO. REV TITLE

LUS-CP07B-QDSBG-DWG-MC-44201 GROUND FLOOR PLAN -


04
SUBSTATION 1 PLUMBING
LUS-CP07B-QDSBG-DWG-MC-44704 FUEL RISER DIAGRAM -
03
SUBSTATION 1 PLUMBING
ELECTRICAL SUBSTATION
LUS-CP07B-QDSBG-DWG-AR-44101 05 (A1-T-S/S-1) GROUND
FLOOR PLAN
ELECTRICAL SUBSTATION
LUS-CP07B-QDSBG-DWG-ST-44006 04 (A1-T-S/S-1) SLAB ON GRADE

Certified for co-ordination with contract documents (QD-SBG)


ARCH CV/ST TEL/ELV/SSD ELEC. PL&FF HVAC

3 RE-ISSUED FOR APPROVAL 28/06/20

UNDERGROUND FILLING 2 RE-ISSUED FOR APPROVAL 04/05/20


LEVEL MONITORING & PUMP CONTROLLER
MONITORING WELL DETAIL MOUNTING DETAIL SECTION C-C PIPE DETAIL 1 RE-ISSUED FOR APPROVAL 22/02/20
SCALE-1:8 SCALE-1:10 SCALE-1:5
SCALE-1:8
0 ISSUED FOR APPROVAL 23/09/19

No. REVISION DATE APP.


CLIENT

PROJECT MANAGEMENT CONSULTANT

SUPERVISION CONSULTANT

PARKING SIGNAGE BOARD DETAIL


SCALE-1:10
CONTRACTOR

DESIGNER

SECTION D-D GENERATOR ROOM PIPING SUPPORT DETAILS


SCALE-1:10
SCALE-1:10
MEP SUB-CONTRACTOR OMEGA ENGINEERING WLL
(MEP DIVISION)
PO BOX: 37951,DOHA, QATAR
PH: 40054222, FAX: 40061694
Email: info@omegaqatar.com
Web: www.omegaqatar.com
FUEL CONTRACTOR

PROJECT
DESIGN & CONSTRUCTION OF CP-07B
LUSAIL PLAZA INFRASTRUCTURE, LRT
BLOCK WELL DETAIL STATION, CAR PARK AND LANDSCAPE.
VEHICLE BOLLARD DETAIL SCALE-1:10
DRAWING TITLE
SCALE-1:10
SUBSTATION-1
FUEL OIL SYSTEM SECTIONS AND
DETAILS
DRAWN: PREPARED: SCALE @A0

CHECKED. APPROVED: AS SHOWN

UNDERGROUND FILLING POINT DETAIL SHOP DRAWING DATE: 28-06-2020


DETAIL-A
SCALE-1:10 SCALE-1:10 DWG NO: SHEET No. Rev
LUS-CP7B-QDSBG-SDW-MC-73413-001 1/1 3