Professional Documents
Culture Documents
Perhitungan Beban Coba Coba 3 Amal
Perhitungan Beban Coba Coba 3 Amal
Beban mati
Beban balok arah x = 0.3 x 0.4 x 62 x 2400 x 2 = 35,712 kg
= 0.3 x 0.4 x 59 x 2400 x 2 = 33,984 kg
= 0.3 x 0.4 x 14 x 2400 x 1 = 4,032 kg
= 0.3 x 0.4 x 30 x 2400 x 1 = 8,640 kg
= 0.3 x 0.4 x 8 x 2400 x 1 = 2,304 kg
= 0.3 x 0.4 x 16 x 2400 x 1 = 4,608 kg
= 0.3 x 0.4 x 17.8 x 2400 x 2 = 10,253 kg
0.3 x 0.4 x 14.6 x 2400 x 1 = 4,205 kg
Beban balok arah y = 0.3 x 0.4 x 9 x 2400 x 2 = 5,184 kg
= 0.3 x 0.4 x 15 x 2400 x 8 = 34,560 kg
= 0.3 x 0.4 x 20 x 2400 x 6 = 34,560 kg
= 0.3 x 0.4 x 23 x 2400 x 4 = 26,496 kg
= 0.3 x 0.4 x 5 x 2400 x 2 = 2,880 kg
Balok katilever = 0.2 x 0.3 x 1.5 x 2400 x 52 = 11,232 kg
Plat = 1077.25 x 0.15 x - x 2400 x 1 = 387,810 kg
Plat katilever = 243.375 x 0.15 x - x 2400 x 2 = 175,230 kg
Beban plafond + ducting = 1077.25 x - x - x 20 x 1 = 21,545 kg
Beban keramik = 1077.25 x - x - x 24 x 1 = 25,854 kg
Beban spesi = 1077.25 x - x - x 21 x 1 = 22,622 kg
Beban ME = 1077.25 x - x - x 25 x 1 = 26,931 kg
Plumbing = 1077.25 x - x - x 20 x 1 = 21,545 kg
Beban dinding = 312 x 3.6 x - x 250 x 1 = 245,602 kg
Beban kolom = 0.4 x 0.3 x 4 x 2400 x 86 = 99,072 kg
Total = 1,244,861 kg
Atap
Beban mati
Beban balok arah x = 0.3 x 0.4 x 14 x 2400 x 5 = 20,160 kg
Beban balok arah y = 0.3 x 0.4 x 22 x 2400 x 4 = 25,344 kg
Plat = 320 x 0.12 x - x 2400 x 1 = 92,160 kg
Beban plafond + ducting = 320 x - x - x 20 x 1 = 6,400 kg
Beban keramik = 320 x - x - x 24 x 1 = 7,680 kg
Beban spesi = 320 x - x - x 21 x 1 = 6,720 kg
Beban ME = 320 x - x - x 25 x 1 = 8,000 kg
Plumbing = 320 x - x - x 20 x 1 = 6,400 kg
Beban dinding = 64 x 1.6 x - x 250 x 1 = 50,400 kg
Beban kolom = 0.4 x 0.3 x 4 x 2400 x 26 = 29,952 kg
Total = 253,216 kg
Atap
Beban mati
Beban balok arah x = 0.3 x 0.4 x 14 x 2400 x 5 = 20,160 kg
Beban balok arah y = 0.3 x 0.4 x 22 x 2400 x 4 = 25,344 kg
Plat = 320 x 0.12 x - x 2400 x 1 = 92,160 kg
Beban plafond + ducting = 320 x - x - x 20 x 1 = 6,400 kg
Beban keramik = 320 x - x - x 24 x 1 = 7,680 kg
Beban spesi = 320 x - x - x 21 x 1 = 6,720 kg
Beban ME = 320 x - x - x 25 x 1 = 8,000 kg
Plumbing = 320 x - x - x 20 x 1 = 6,400 kg
Beban dinding = 64 x 1.6 x - x 250 x 1 = 50,400 kg
Beban kolom = 0.4 x 0.3 x 4 x 2400 x 26 = 29,952 kg
Total = 253,216 kg
No W h wi x hi Fx
1 2052155 4.00 8208619.36 178033.47
2 1181680 8.00 9453440.32 205031.89
3 370419.2 10.00 3704192 80338.74
Total 21366251.68
Arah x = Fx / 18 sisi
F1 9890.748 kg 9.89 ton
F2 11390.66 kg 11.39 ton
F3 4463.263 kg 4.46 ton
Arah y = Fx / 8 Sisi
F1 22254.18 kg 22.25 ton
F2 25628.99 kg 25.63 ton
F3 10042.34 kg 10.04 ton
T = 2.00 detik
= 0.048 x Tinggi bangunan ^ 0.75
= 0.048 x 10 ^0.75
= 0.048 x 5.623413
= 0.270
diambil C tanah Lunak senilai 0.50
c = 0.50 / t
= 0.50 / 0.270
= 1.85 karena > dari 0.5
maka dipakai 0.5
V = R x (Ie/R) x W total
= 0.50 x 1.50/3.5 x 3,604,254.08
= 772340.16 Kg
pjg banyak
6 10 60
5 2 10
30 1 30
4 38 152
3 10 30
2.50 4 10
1.5 4 6
10 1 10
2 2 4
Hasil Output MAXIMUM Momen 3-3, Shear 2-2, dan Axial Force
M3-3
Kolom -17912.38 Kgf-m
No. PR ITEM NAME QTY USD
197214 Brg,Ball,Ann;SKF;7312 BEGAP 6 EA 21
197212 Brg,Rlr,Self-Al;FAG;22324-E1-XL-J24BA-T4 4 EA 225
197068 Brg,Rlr,Thrust;NSK;29428 E 5 EA 300
Brg,Rlr,Thrust;FAG;29428-E1-XL 5 EA 300
Housing,Brg;SKF;SE 515/ 612 8 EA 45
197954 Brg,Ball,Ann;SKF;63062ZC3;30d;72D;19mmW 6 EA 3.6
14466.25
RP
303,791.25
3,254,906.25
4,339,875.00
4,339,875.00
650,981.25
52,078.50