You are on page 1of 1

PTZ 8

MALIYASAN GAM
PTZ 7

138.
00
PTZ 6

IOCL

90.80
OM TOWER

PROP. SITE
O WOTCH
R
V
D

5
INTERNA L ROAD

27
5.00 MT.

.2
8

3
4M
ROAD

W
.

ID
95.46
0 MT

E
D 5.0 WALL KEY PLAN
UND

RO
AL ROA TOWER

MS
A
COMPO WATCH

V
D
INTERN COMPOUNDWALL

M
AD

AN
RO

IF
E

O
ID

2
LD
W

2
AR
4M

EA
RO
AD
TOWER
WATCH
PTZ 9 SV
M
T

93 .39
MANDIR
M AD
0 O
R
M-8

R
60 M-11

O
A
D

SAT HANUMAN

D
ROA X
3

6
LL W
WA
ND
MPOU ROAD NE
CO 67
VAPO 53

LPG
UR (7) 11 4.
els

LIN
M-7 64

E
TRAP
ss 5
Ve ET-
E e

RO
LIN ag LL
G or

AD
LP St G BU FC 2 E
G / -4 WID
A ET R.C.C.DRIVEWAY 5M D
LP TE

ANANDPAR
LL GA ISE

32
NCY RA OR
BU GE NIT

4M
ER MO
38 .75
/G -3 EM

W
AD A ET (1)

ID
E

5.00 MT.
RO LL 2
BU .6 (2) 3

RO
2
/G T- 81.8

NAVAGAM
(3)

AD
A 34
LE
64.20
HS-6
HS-10 (4)
M-5

AL ROAD
UL
B 2
/G TLD SHED (5)
A 43.8
(8) DV (5) (6)

INTERN
E

INTERNAL ROAD
LPG STORAG (7)

3.1
SPHERE M-3
HORTON

0
D
ISE
RA OR
MCP-4 M-10 NIT

16 .9
LPG L INE MO

5
ICLE

IN
VEH

.6

TE
G THE
NIN

50

RN
FC 1 TUR

A
66 .2

L
M-1 FOR
M-4 CE

7
SPA

RO
FC 3

AD
5
30.0
AHEMDABAD

MCP-3 G
30 CIN
ROAD

45
HS-4 .1 FEN
BY

.8
0 ED

4
YARD

RCAT
MA

6.3
3
E DE
SPAC
MARKETING

INTERNAL
M-6 ROAD
2 (6)
.5
31 E
US RS
O 3 CYLINDE
ROAD M-2
H GE OF FILLED
P 22.8 STORA

CO
M SHED
PU FINGER

MP
G LOADING
LP SHED (1)

OU

65.28
ND
HS-8

WA
LL
MORBI GONDAL

81 .11
HS-3

LL
WA
UND

7.12
PO
COM

60.3
FC 4

DV

1
CHOWKDI

ES
0 TANK
TRAVERS 5.0

128.79
GREEN LAND

6.2
G FINGER

7
DV LOADIN

8.01
SHED

44 .2

14
2
COMPOU NDWAL

5.2
L R.C.C.DRIVEWAY

7
. LOADING TALLY
MT

7.22
5.00 PIPE LINE GARDEN
AD (32)
44.2

AL RO INLAND G FINGER
LOADIN
1

RIVEWAY MCP-5
RN R.C.C.D
INTE SHED

34.66

DWALL
2.85

3.35
7.22
GA R
FIN
(22) ADING

DGE

ROAD
• •• AL LO
7

ROAD
WATER TANK-1

COMPOUN
• •• GARDEN DITION
15 .1
(22) AD

HBRI
RM

PLATF
INLAND

E
•• • STORE PLATFO

0
• •

4.98

T LIN
WATER TANK-2 ROOM 2.03

12.63
•• ••• WITH OUT

2. 90
20.4 ORM

WEIG

INLE
•• • • •

PL

R
SHED
RAJKOT

• •• 6

TEE
DV
D (21) 15.4

WA
ROA

ATFO

2.92

USE
2.98

RM
10.61

P HO
7.4

.0 4
4.91 NOTES:

7
PI
CYLINDER

3.57

PUM
DESHAPING

E
AP.

90
PE

F
M/C ROOM

FIR
LIN
E

IR
E
88 M-15

MT.C
H
TANK-2

11.23

5.66
PU
NEW FIRE WATER

M
•• ••• (24) 11 5.

P
• • • •• • • 4.89

2X50 BRIDGE
WEIG
44 .2

HO
(25)RAP YAR D STATIC WATER 3 2
SC

US
5.07 TANK 2.1

E
4
0

FI
RE
5.0 (20)
44.1

TR
OL
ORE AND
1

23.01
SHED

LE
ENGG.ST

9.87
Y
4

43
RECORD ROOM STAKE TRUCK PARKING

.9
37.4 (19)

5
(23) STATIC WATER
TANK

R.C.C.DRIVEWAY
11.70 SHED
(22) • • • FIRE PUMP FILLING
• • • •• • • • • HOUSE SHED 0 M-16
PTZ 10
.0 0 M-21
(2) BULK TRUCK PARKING
MCP-2
(40 M X 10
TANK-1 M) 12 .9
FIRE WATER WIGH

61.1

IN
11 (18) 30.00 MT. TOWER
LIGHTING

TE
G IVEWAY
R.C.C.DR

RN
BUILDINBLOC K
TOILET
S & D CUN

AL
D

R
ROA
HS-6 MCP-7

OAD
8.6
INT
ROAD AREA + OTTA

5.
8

00
0 MCP-6

ER

M
.4

T.
NAL
45
FC 6
TANK
44.1

4.00
1

HS-2
AD

MT
.0 0
10.72 4.001

.RO
L RO

3.90
43 .9

0 0

AD
NA
2

12 .0 30 .3
ER

WA

7.00
PLAT
INT

PL

PTZ 11 FC 5 2.00
3.00 3.00
FO

AT

9
POUR
RM

12.5
BL

N
FORM

PL

(9) GARDE
OW

INLAND
AT

PTZ 4

24 .00
ER

FO

8
PLA

15 .0 RM
RM

FO SHED
AT
20.0

M-20
TF OR

PL OUT
1

33.53
ITH
M

BUILDING

GARDEN
HS-7
W
22.7
5

2
20.0

DOUBLE STOREY OFFICE


BORWELL 42 .6
3

R
GE
FIN
ING
AD
44.0

LO
UN

7.00
4

5.39 .09
15
4.90 5.00
7.11

M-19

14.9
6 RM
(3)

7
FO SHED
R.C.C.DRIVEWAY
53 .3

17.1 ERS PLAT T


OU
6

5.26

(13) 8 EMPTY CYLIND TH


14 .6 WI
SHED
10.4

GARDEN
C

.32
4
C

12
PTZ 12 MCP-8
OM

4.75
D
RO P M
OL
70.1

(26)

28.93
5.7 7
30 .3
5

45.1

COLD REPAIR 4
1
7.00

(10) SHED SHED

CAR PARKING
42 .9

ROAD
PARKING
6.07

27.58
STORE ROOM
(4) M-17
(38) (37)
(36)

GARDEN
6 T SH ED DV
(12) 5 22.3
22.58

TH OU AD
20 .1 WI
RM .RO
ROAD

0 MT
2.38

10.56 AT FO
PL L 4.0
ER NA
INT

3.63
16.34 INT

16.86
ER

HSD PUMP
ATTENDE NT
INTERNAL

P M C C ROOM
5.00
NA L

3.54 ROOM HS-9


4.00

(17) 5.79

GARDEN
(11) WIGH
MT

30. 00 MT. TOWER


LIG HTING
.RO

D.G. ROOM

ROOM

GARDEN
19.14
AD

ISOLATION
M-18 AD
.RO
0 MT D
L 4.0 ISE
H.T. ROOM RA OR
PTZ 1 ER NA NIT
INT MO

.00
138
R.C.C.DRIVEWAY STING TANK
HARVE
RAIN WATER 25.26
(33)
COMPOUNDWALL 5.81
INTERNAL ROAD
3.08

60.35

PTZ 2
137.00

2.20
INTERNAL ROAD 5.00 MT.
15.72
0.50

5
INTERNAL ROAD 5.00 MT.

6.22
(35)
L ADIES TOILET 139. PTZ 3
00 8.00

7.0

UG HSD TANK
29.15

(14)
6.49 22.13
10.00

(16) SCR AP YAR D

ROOM
16.78

8.46
(34)

DRIVER REST
(15)
BORWELL

INTERNAL ROAD 10.00 MT.


Parking

TRUCK PA RK ING
32.24

37.03
15.84

39.00

137.00

Proposed

REGIONAL
GSO COMMITTEE HO COMMITTEE
COMMITTEE

SPM, RBP CLM (O), GSO LPG-ENG LPG-OPS

SM, ( LPG-E ), GSO DGM ( LPG ) GSO HSE

SUBJECT :- FIRE HYDRANT LAYOUT

DATE DRAWING NO

R10 Construction of 3 X 600 MT Mounded bullet & New Fire


09/09/2014 NUMBERS CROSSED OUT
Pump House.
NH - 8 B, NAVAGAM, RAJKOT - 360 003. AREA SUPERSEDED
R9 16/06/2014 Development of Truck Parking Area DRAWINGS
RIVISION ZONE OR SCALE :- 1 : 700 DRAWN :- EDITED :- CHECKED :- DRAWING NO :
DRG. NO. DATE PART BRIEF RECORD INITIALS

DATE :- 22 - 11 - 2014

You might also like