Professional Documents
Culture Documents
Form Battery Test Manual V1.1 Period: - Until
Form Battery Test Manual V1.1 Period: - Until
1
Period : ___________ until ___________
Test Date : Site ID : Current Limit : % Equalize Voltage : Vdc SMR Type : Room Temp : °C LLVD1 : Vdc ( Auto / Manual )
Test Time : Start / Finish Site Name : DC Under Voltage : Vdc Floating Voltage : Vdc SMR Total : Unit Humidity : % LLVD2 : Vdc ( Auto / Manual )
TEST RESULT
BATTERY SPECIFICATION
Battery Status
Action Plan Backup Time
After Tested
Float Open 15 30 45 60 75 90 105 120 (Reloc / Replace) Estimation
Bank Cell No. Merk Type Capacity (Good / Degraded)
Voltage Circuit Minutes Minutes Minutes Minutes Minutes Minutes Minutes Minutes
Total Battery Voltage (Vdc) on PSU Display Voltage
#1
#2
#3
I #4
Total Battery Voltage per Bank (Vdc)
Total Battery Current per Bank (Adc)
II
#1
#2
#3
III #4
Total Battery Voltage per Bank (Vdc)
Total Battery Current per Bank (Adc)
Notes :
( ____________________________ ) ( ____________________________ )
FLM Engineer FLM AC