QF:- 4.

8
LOG COMPANY NAME Revision:-0
O Date:-15-06-2018

PROJECT NAME

Client : Independent Engineer :


SETTING TIME CONCRETE (IS : 1199 (Part-7) :2018)

Concrete Mix / Grade : M-30 RCC Date of Testing : 12/12/2020

Grade of Cement : OPC 53 Grade Ambient Tepmrature : 27.5oC

Trial Mix : Size of cube (mm) :150 X 150 X150

Elapsed Time
210 240 270 300 330 360 390 420 450 480
(min)

Area of Needle
645 645 323 323 161 161 65 65 32 16
(mm2)
Sample
No. 1
Pressure (N) 40 160 230 350 250 450 340 580 590 590
P E N E T R A T IO N R E S IS T A N C E (M P a )

Penetration
0.06 0.25 0.71 1.08 1.55 2.80 5.23 8.92 18.44 36.88
Resistance (Mpa)

38.50
35.00
31.50
28.00
24.50
21.00
17.50
14.00
10.50
7.00
3.50
0.00
210 240 270 300 330 360 390 420 450 480

Elapsed Time (min)

Initial Setting Time : 373 Min


Final Setting Time : 464 Min

EPC Contractor Representative Concessionaire Representative IE Representative