You are on page 1of 54

Suntech Infra Solutions

Private Limited

Corporate Presentation

601, Gopal Heights (D-9), Netaji Subhash Place, Pitampura, New Delhi – 110034
Call +91 11 47057766 /40 / Fax +91 11 47047766 / Mobile : +91 9871281838 : info@suntechinfra.com,
www.suntechinfra.com
Content
• Brief introduction to SUNTECH
• SUNTECH Vision & Philosophy
• SUNTECH Growth Chart
• SUNTECH Achievements
• SUNTECH Pride Of Execution- Arabtech
• SUNTECH Manpower Strengths
• SUNTECH ISO Certificate
• SUNTECH Services
• SUNTECH Recently Completed Projects
• SUNTECH Projects under Execution
• SUNTECH Uniqueness
• Cornerstones of SUNTECH Success
• SUNTECH Esteemed Clients
• SUNTECH maximum services provided
• SUNTECH pride of execution
• SUNTECH Owned Equipment
• SUNTECH Client Feedback
01

BRIEF INTRODUCTION TO SUNTECH

Suntech Infra Solutions Pvt. Ltd. (SUNTECH), is a professionally managed construction company with almost
02 decades of successful and unblemished track record. The Company was established in 1999. SUNTECH
started its operation with construction equipment renting which dealt in renting of Construction
Equipment like cranes, dozers, transit mixers, etc.

Subsequently, SUNTECH entered into Construction Industry with Piling and Ground Improvement Works,
including caging, and concreting. Now SUNTECH has diversified into the areas of Specialized Ground
improvement & retaining work like Anchoring, Micro Piling, Stone Column etc., with all latest technology
and equipments.

Presently, SUNTECH is very much into the Civil Infrastructure sector keeping its commitment towards the
country to be a part of the Make in India move and is expanding into Roads, Railways, Ports with sincere
effort and dedication.

Today SUNTECH is a name to reckon with in the field of Civil Infrastructure and Ground Improvement Work.

We achieve excellent result through our professional approach and delivering quality work. Our continual effort of
improvement has given us the edge over others and we are receiving continuous recognition from our clients. Our
success is built on Client Satisfaction, efficiency and strong human relations.
02

SUNTECH VISION & PHILOSOPHY


What we envision and our goals for future

To be India’s most trusted & reliable construction company. We aim to redefine


the construction world by bringing forth honesty, transparency, timely delivery for
all our clients, partners, associates & team members in all our endeavors.

Client win - We win.


We ensure that clients’ purpose of choosing us is
fulfilled, thus making them win.
A. Delivery is now no more with you, its our job, and
delivery for us means always ‘on or before’ time
B. Every time, we strive to give client a similar
experience that is "WOW"
C. Machinery is our wealth, and Team members are our
asset
D. Providing safe work environment to the team
members and empowering them to achieve required
results
E. Quality is the building block of our organization.
03

SUNTECH GROWTH CHART


Our growth history

We have been growing at a steady rate and broadening the horizon of our activities.
From a revenue of $700K in 2008, we have grown steadily and posted a revenue of $9 Mn in
2019.
04

SUNTECH ACHIEVEMENTS
Our feats

1,00,00+ 15,50,000+ 5,00,000+ MQ of 200+


Numbers running meters concrete work projects
meters of pile

No. of Projects
Total running
No. of Piles

completed
concreting
done

done
done

Total
05

SUNTECH MANPOWER STRENGTH


An introduction of our highly talented team

The company has diverse mix of people, having MBA, Civil Engineering, Designing, Planning
and operation qualifications, and an in-depth knowledge and technical know-how in the
field of infrastructure and construction.

Diverse mix
Commercial Executives
6% of people
30%

In-depth
Knowledge

Capable of handling
Engineers &
64% any project
Technicians

Staff Team size is above 350. Highly trained


individuals
06

SUNTECH ISO CERTIFICATE


Our ISO Certificate
07

SUNTECH ISO CERTIFICATE


Our ISO Certificate
08

SUNTECH ISO CERTIFICATE


Our ISO Certificate
09

SUNTECH MSME CERTIFICATE


Our MSME Certificate
10

SUNTECH LAST 3 YEARS TURN OVER


Last 3 Years Turn Over

S.No. Financial Year Amount


(In Crore)
1 2016-17 36.83
2 2017-18 51.77
3 2018-19 59.98
4 2019-20 41.10
11

SUNTECH SERVICES
An overview of the services that we offer

Our core services – Civil foundation and Ground improvement, Soil & Rock stabilization, Construction of
Roads and bridges, Pipe laying, and Renting of equipment.
We are now venturing into Irrigation, Port construction.

 Pipe laying
 Foundation and Ground
Improvement Work  Earth Work
 Structural work  Diaphragm Wall
 Piling of different types (Bored Cast-  Load Tests
in-situ, Driven Cast-in-situ, Precast
spun pile, Sheet pile)  Road Construction

 Micro Piling  Renting of Construction Equipment

 Compaction Pile (Stone/Sand  Marine Jobs:- We also hire Jack-up


Column) platform & Sludge barge from our
associate vendors (as per the
 Rock Anchoring, Nailing requirement)
12

SUNTECH
SUNTECH–UNIQUENESS
UNIQUENESS
This is how we differ from the rest
Our uniqueness

“We are Unique!"

 We have always maintained:  Because of our relentless focus


 quality as our top most priority on quality, we have been
 set appropriate targets, which consistently receiving and
allows up to ensure the HIGHEST executing repeat orders from our
quality of work customers.

 We rigorously define the scope of  The management of the company


our projects such that they can has gained expertise in the
be properly handled and construction field over the period
executed by the management of time to deliver excellent
and staff. results.
13

CORNERSTONES OF SUNTECH SUCCESS


The values that are imbibed in the DNA of our company

We have focused on growth through innovation and sustenance.

01 Continuous
Improvement 02 Up to date in overall
approach 03 Best Machines
And People
Measuring the quality of the services Adopting and applying the modern Engaging the machines, equipment and
provided and continuous improvement. approaches in management, personnel that can always apply the most
. administration and human resources. advanced technology.

04 Not Shy of New


Investments 05 Growth Oriented
Environment
Proactive in making new investments for Allowing the managers to make their own
new applications. sub-units and give them responsibility,
thus, help them grow.
14

SUNTECH ESTEEMED CLIENTS


Some reputed clients we have worked with

We have a great set of credentials.


15

SUNTECH ESTEEMED CLIENTS


Some reputed clients we have worked with

We have a great set of credentials.


16

SUNTECH ESTEEMED CLIENTS


Some reputed clients we have worked with

We have a great set of credentials.


17

SUNTECH MAXIMUM SERVICES PROVIDED


Types of PEAK PERFOMANCE WORK We Provided

We have stretched the limits.

MAXIMUM MAXIMUM EFFICIENT MAXIMUM


PILING LOAD TEST PILING PILING
DEPTH DONE PROCESS DIAMETER
ACHIEVED

70 mtr depth for 2500 tonnes 1300 piles of 750 diameter and 22 2000 mm
2000 diameter piling meters depth done in 3 months diameter piles of
flat with 2 Rigs. 70 meters depth
18

SUNTECH PRIDE OF EXECUTION – Arabtech


We have DELIVERED value and efficiency

We were highly appreciated for our work as we completed the work before time (56 days instead of 70
days), while meeting all the stringent norms and compliances.

Project : Raheja Revanta, in Gurgaon. High rise residential towers.


Client: M/S Arabtec Construction (India) Pvt.Ltd. The Indian wing of the company engaged in
the construction of World's Tallest Tower 'BURJ KHALIFA - DUBAI').
Project details : 170 No. Piles of 1000mm diameter with 27 meters of depth.
Challenges: Quality parameters were very strict, and the client had stringent safety management.
parameters as well. This involved coordination and filing of requisite compliances on
time, even within the short timeline given for execution.

Offer given by Mobilized based Final


on just mail Work Order
M/S Suntech to First pile casted. completion
confirmation. received.
M/S Arabtec . 20/10/2012 of work.
12/10/2012 19/10/2012
28/09/2012 15/12/2012
19

Rakesh Kumar Singh (Project manager):- ( ATC Tower L&T )


DIAL-ATC Project)This is to certify that "M/s SUNTECH INFRA SOLUTIONS Pvt. Ltd." an
approved Piling Contractor with our Company, have substantially completed the Piling work
at ATC Tower, DIAL Project within the specified time frame, also by
fulfilling all our requirements, formalities, maintaining all safety rules & regulations, etc.

Anil Pahwa (COO, Arabtech Construction India Pvt. Ltd.):-This is to certify that "M/s
SUNTECH INFRA SOLUTIONS Pvt.Ltd.“ was been awarded the piling work of 170 piles with dia
of 1000mm, depth approx. 27m, for Raheja developer’s Revanta Project. The sub-contractor
has completed the job successfully with compliances of statutory, quality and safety
requirements at our site.
20

D.D. Khot (Project Leader, L&T- SUCG JV)This to certify that M/s Suntech Solutions Pvt. Ltd."
an
approved Piling contractor with our company, had successfully completed our piling work for
Airport Metro Express Line between Dwarka to IGI Airport. They were awarded the Piling Job
for Dwarka Site, as well as for IGI Airport Site for shaft works, which they had completed
successfully within the specified time frame, full cooperation, also by fulfilling all our
equirements,formalities, maintaining all the safety rules and regulations,etc.

D.K. Sharma (Project Manager, L&T) DMRC CC-06 This to certify that M/s Suntech Solutions
Pvt. Ltd." an approved piling Contractor have successfully completed the piling work of
“Elevated Viaduct & Stations for DMRC PKG CC06 – Badarpur Faridabad Corridor” within the
specified time frame, also by fulfilling our requirements, formalities, maintaining all safety
rules and regulations etc.
21

SUNTECH COMPLETED CIVIL PROJECTS


Our completed projects.

We have completed various projects, and are mentioning some of our recently completed projects.

SL. LOCATIO PILE DIA PILE RUNNING VALUE COMPLETION


PROJECT CLIENT TYPE OF WORK
NO. N (MM) DEPTH ( MTR ) (In INR) YEAR
(MTR)
POLICE BHAWAN LUCKNO FOUNDATION 8 Completed
1 L&T 600/750 15 28002
/DIAL 100 W WORK CRORE 2016
NMRC, NOIDA FOUNDATION 5 Completed
2 NOIDA SAM INDIA 1000 30 13943
METRO WORK CRORE 2016
FOUNDATION/C
VARANASIAURAN Completed
UTTAR ISOLUX ONCRETING 5
3 GABAD ROAD 1000/1200 6800 2016
PRADESH CORSAN AND OTHER CRORE
PROJECT NH-2
ALLIED WORK
VIJAY
1.25 Completed
YAMUNA UTTAR NIRMAN FOUNDATION
4 - - - CRORE 2016
EXPRESSWAY PRADESH CONSTRUCTI WORK
ON
FOUNDATION &
CEMENT PLANT ULTRA TECH OTHER 3.5 Completed
5 SURAT 600 20 1100
CEMENT LTD STRUCTURAL CRORE 2017
WORK
22

SUNTECH COMPLETED PILING PROJECTS


Our completed projects.

We have completed various projects, and are mentioning some of our recently completed projects.

PILE COMPLETION
SL. PILE DIA RUNNING VALUE
PROJECT LOCATION CLIENT DEPTH YEAR
NO. (MM) MTR (In INR)
(MTR)
Completed
6 DMRC CC06 FARIDABAD L&T 1000 / 1200 34 55000 19 CRORE
2014

500 BED &


PARAMEDICAL & Completed
7 ETAWAH UPRNN 600 / 700 24 75000 18 CRORE
INTERNATIONAL 2016
SWIMMING POOL
HYDELBERG Completed
8 JHANSI L&T 800 / 1000 27 29000 9 CRORE
CEMENT PLANT 2011
Completed
9 DMRC CC 28 DELHI L&T 1000 / 1200 28 18000 6.5 CRORE
2014
450 / 600 / 750 Completed
10 POLICE BHAWAN PATNA ACIL 28 39000 5.5 CRORE
/ 1000 2015
L&T Completed
11 SEZ KHURJA KHURJA 600 25 20000 3.75 CRORE
/ ARSHIA 2011
AIR TRAFIC DELHI Completed
12 L&T / GMR 1500 32 6000 2.5 CRORE
CONTROL TOWER AIRPORT 2012
23

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.

COMPLETION
SL. PILE DIA PILE DEPTH RUNNING VALUE
PROJECT LOCATION CLIENT YEAR
NO. (MM) (MTR) ( MTR ) (In INR)

Completed
NTPC, TANDA
TANDA, UP GDCL 600 / 760 32 21634 11.8 CRORE 2016
13 THERMAL
WORLD TRADE
14 NOIDA PROACTIVE 800 28 4.5 CRORE
CENTRE 47967
Completed
MULTILEVEL
15 ETAWAH UPRNN 750 18 1027 3.5 CRORE 2016
PARKING
Completed
TAJ ORIENTATION TATA
16 AGRA 750 18 - 3 CRORE 2017
CENTRE PROJECTS
Completed
DLF CREST ( CLUB
17 GURGAON DLF / MACE 500 20 - 6 CRORE 2017
HOUSE )
ANCHORING WORK
Completed
AT SHASTRI PARK NORTHERN
18 NEW DELHI 100 TON 42 - 80 LAKHS 2018
OVER YAMUNA RAILWAY
RIVER
SHAPOORJI Completed
AMRAPALI AWAAS 6 CRORE
19 LUCKNOW PALLONJI & 300/600 29 37946 2018
YOJNA
CO. LTD
24

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.

PILE RUNNING ( COMPLETION


SL. LOCATI PILE DIA VALUE
PROJECT CLIENT DEPTH MTR ) TYPE OF WORK YEAR
NO. ON (MM (In INR)
(MTR)
DR.NTTPS STAGE VIJAY 5.5
20 BGR 600 15 16817 PILING WORK Completed 2018
THERMAL POWER WADA CRORE
PILING AND
SAMSUNG FACTORY SAMSUNG 3.5 Completed 2018
21 NOIDA 1000/750 44 21634 STRUCTURE
CONSTRUCTION C&T CRORE
WORK
SLOPE
LUCKN SHAPOOR 6
22 Housing PROJECT 600 29 3096 PROTECTION Completed 2019
OW JI CRORE
WORK
LUCKN SHAPOOR 2.3 Completed 2018
23 CANCER HOSPITAL 800 26 10798 PILING WORK
OW JI CRORE
SLOPE
FREYSSINE 6.25 Completed 2017
24 SOIL STABILIZATION JAMMU 200/100 - 4029 STABLIZATION
T CRORE
WORK
REDEVELOPMENT NEW SHAPOOR 1200/900/ 12 Completed 2018
25 24 30279 PILING WORK
OF ITPO COMPLEX DELHI JI 750/600 CRORE
NEW 1 SOIL FILLING & Completed 2018
26 INDIAN RAILWAY GPT - - 11318 MQ
DELHI CRORE+ COMPACTION
25

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.

PILE RUNNING COMPLETI


SL. PILE DIA VALUE TYPE OF
PROJECT LOCATION CLIENT DEPTH ( MTR ) ON YEAR
NO. (MM (In INR) WORK
(MTR
Completed
1X800MW NORTH NORTH 760/500/6
27 BGR 28 35383 5 CRORE PILING WORK 2018
CHENNAI CHENNAI 00
Completed
28 HOUSING PROJECT AMARAVATI L&T 600/750 24 13805 3 CRORE PILING WORK 2018

Completed
UNITY 1.8
29 VERSACE TOWER NEW DELHI 1000/1200 40 6432 PILING WORK 2018
GROUP CRORE
NEW INTEGRATED
Completed
TERMINAL SHAPOOR
30 GUWAHATI 1200 25 16625 6 CRORE PILING WORK 2018
BUILDING OF AIR JI
PORT
EVERSEND
DLFIT/TESSEZ AI Completed
1.59
31 PHASE III, CHENNAI CHENNAI CONSTRUC 750 16 355 PILING WORK 2018
CRORE
BLOCK-15 TION PVT
LTD
SWETA Completed
CENTRAL PARK SLOPE
32 GURGAON ESTATES 750 26 1976 1 CRORE 2018
PROJECT PROTECTION
PVT LTD
26

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.

PILE PILE
SL. RUNNING VALUE COMPLETION YEAR
PROJECT LOCATION CLIENT DIA DEPTH TYPE OF WORK
NO. ( MTR ) (In INR)
(MM (MTR
HOM-D&B DIESEL SHEET PILING AND
SHAPOOR
LOCOMOTIVE ROZA 10 9 1083 2 PRESSURE Completed 2018
33 JI
SHED CRORE GROUTING WORK

HEIGHTON 3.25 SLOPE


CONVENTION Completed 2018
34 RANCHI CONSTRU 600 9 3540 CRORE PROTECTION
CENTRE
CTION + WORK
1200/ 12 Completed 2017
35 ROB/BRIDGES ALLAHABAD GMR 30 16765 STRUCTURE WORK
1500 CRORE
MPL MAITHON TATA 5.5 Completed 2017
36 DHANBAD - - - STRUCTURE WORK
POWER POWER CRORE
CONSTRUCTION J.KUMAR
OF EMERGENCY INFRA 4.70 Completed 2018
37 LUCKNOW 600 18 30068 PILING WORK
MEDICINE PROJECT CRORE
CLINICAL S.G.P.G.I LTD.
CONSTRUCTION SHAPOOR
OF HOUSING JI 5 Completed 2018
38 LUCKNOW 500 16 16445 PILING WORK
PROJECTS AT HCL PALLONJI CRORE
IT CITY , LUCKNOW & CO.LTD
27

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.

PILE
SL. PILE DIA RUNNING VALUE COMPLETION YEAR
PROJECT LOCATION CLIENT DEPTH TYPE OF WORK
NO. (MM ( MTR ) (In INR)
(MTR
BGR
VISAKHAPA ENERGY 1.46 COMPLETED
39 HPCL VIZAG 600 11 16794 PILING WORK
TNAM SYSTEMS CRORE 2019
LIMITED
HURL BARAUNI L&T
2200 MTPD HYDROCA COMPLETED
11.50
40 AMMONI BIHAR RBON 800/600 20 30828.85 PILING WORK 2019
CRORE
FERTILIZER ENGINEERI
PLANT, BIHAR NGE
2*660 MW SIMPLEX
JAWAHARPUR INFRASTR 6 COMPLETED
41 ETAH 800 26 21810 PILING WORK
THERMAL POWER UCTURES CRORE 2019
PLAT LTD.
CONSTRUCTION NKG
COMPLETED
OF SPORTS INFRASTR ANCHOR WORK
42 NEW DELHI - - - 57.LAC 2019
INJURY CENTERE UCTURE
NEW DELHI LIMITED
28

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.

PILE RUNNIN
SL. PILE DIA VALUE COMPLETION YEAR
PROJECT LOCATION CLIENT DEPTH G TYPE OF WORK
NO. (MM (In INR)
(MTR ( MTR )
POWER
CHP 1*500 MW
MECH 2.27 COMPLETED
43 FGUTPP STAGE-IV UNCHAHAR 760/600 25 13539.54 PILING WORK
PROJECT CRORE 2019
AT UNCHAHAR
S LIMITED
INDI-HUB
COMMERCIAL SHIPRA 19.69 COMPLETED
44
COMPLEX
GHAZIABAD
MALL - - -
LAC
PILING WORK
2019
PROJECT

NCC 7 COMPLETED
45 AIIMS GUWAHATI GUWAHATI 500/600 18 16402.18 PILING WORK
LIMITED CRORE 2019

DFCC RAILWAY LARSEN &


5 COMPLETED
46 PROJECTS MEERUT TOUBRO 1200 - - PILING WORK
CRORE 2020
LTD

COUNTIGUOUS PILING
WORKS AT
1.5 COMPLETED
47 CH.301+780 TO ALLAHABAD GMR 1000 - - PILING WORK
CRORE 2021
301+980 IN PACKAGE
202A
29

SUNTECH RECENTLY COMPLETED PROJECTS


Our completed projects..

We have completed various projects, and are mentioning some of our recently completed projects.
PILE
SL. PILE DIA RUNNING VALUE TYPE OF COMPLETION YEAR
PROJECT LOCATION CLIENT DEPTH
NO. (MM ( MTR ) (In INR) WORK
(MTR
8-LANE DWARKA
J KUMAR
EXPRESSWAY 1000/ 6 PILING COMPLETED
48 DELHI INFRA - -
PACKAGE RUB NEAR 1200 CRORE WORK 2021
PROJECTS
DWARKA SECTOR 21
RUF - VISKHA
REFINERY LARSEN &
600/ 10 PILING COMPLETED
49 MODERNIZATION VIZAG-A.P. TOUBRO - -
800 CRORE WORK 2021
PROJECT- HPCL LTD
VISHAKAPATNAM
ADANI LNG STORAGE LARSEN &
1.12 PILING COMPLETED
50 TANK PROJECT ODISHA TOUBRO 750 - -
CRORE WORK 2021
DHAMRA LTD
BERGEN
LNG DHAMRA ENGINES 11.53 PILING COMPLETED
51 ODISHA 600 - -
PROJECT INDIA PVT CRORE WORK 2021
LTD
BARH SUPER
THERMAL POWER M/s MELCO
1.22 PILING COMPLETED
52 PROJECT STAGE I PATNA INDIA PVT 600 - -
CRORE WORK 2021
(3X660MW) LTD
30

SUNTECH PROJECTS UNDER EXECUTION


Our current projects.

Some of Our Ongoing projects are listed as under.

S. NO. Owner/ Client Name Project Name Scope of work Location Contract Value (INR) Start Date

2x660 MW BUXAR THERMAL


1 LARSEN & TOUBRO LTD. PILING WORK BIHAR 250,000,000 18.01.2020
POWER PROJECT
DRY ASH SYSTEM AND CHP AREA
KANTI BIJLEE UPTADAN
2 OF STAGE III (2X195MW) PILING WORK BIHAR 26,700,000 05.09.2020
NIGAM LTD
MUZAFFARPUR ,PROJECT
PILING WORKS PERTAINING TO
L&T HYDROCARBON
3 AVU BR9 EXPANSION PROJECT PILING WORK BARAUNI 7,29,33,893 19.12.2020
ENGINEERING LIMITED
AT IOCL, BARAUNI

L&T HYDROCARBON HRRL-PFCCU AND PRU


4 PACHPADRA, BALOTRA, BARMER
ENGINEERING LIMITED PILING WORK 38,86,34,387 13.02.2021
BARMER,RAJASTHAN RAJASTHAN

BARAUNI,
5 ANAND KUMAR SINGHANIA BTPS BARAUNI PILING WORK 88,40,000 17.05.2021
BIHAR

6 KAMAL BUILDER UCL-PATLIPUTRA CEMENT WORK PILING WORK PATNA, BIHAR 2,12,84,600 03.06.2021
SUNTECH PRIDE OF EXECUTION
31

Execution is a 24*6 across all activities

Drilling activity using our MAIT HR 180 Rig


SUNTECH PRIDE OF EXECUTION
32

Execution is a 24*6 across all activities

Cage making activity by our staff


SUNTECH PRIDE OF EXECUTION
33

Execution is a 24*6 across all activities

Cage Lowering during NIGHT operations


SUNTECH PRIDE OF EXECUTION
34

Execution is a 24*6 across all activities

Concreting activity by our staff


SUNTECH PRIDE OF EXECUTION
35

Execution is a 24*6 across all activities

ROCK BOLTING drilling by our Soilmec SM 14


36

ROCK ANCHOR WORK


37

SHORTCRETE WORK
38

ANCHOR DRILLING WITH HYDRAULIC RIG SM-14


39

STRESSING OF ANCHORS
40

SOIL ANCHORS
SUNTECH PRIDE OF EXECUTION
41

Execution is a 24*6 across all activities

Box Bridge being built by our team


SUNTECH PRIDE OF EXECUTION
42

Execution is a 24*6 across all activities

Pipe laying by our team


SUNTECH PRIDE OF EXECUTION
43

Execution is a 24*6 across all activities

Pipe laying and digging by our team


44

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Hydraulic Rotary
Piling Rigs
Quantity: 28
Capacity: 400mm to
2000mm dia

Models:
• BAUER BG-28, BG-
20H. Qty-02
• MAIT HR-180, HR-
130. Qty-10
• SOILMEC SR-40, SM-
14. Qty-04
• SANY SR-285, SR-
155, SR-205. Qty-12
45

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Hydraulic
Diaphragm Wall
Grab
MAIT
Capacity: up to 1200mm
width
Quantity: 02

Transit Mixer
Schwing & Greaves
Capacity: 7 CUM
Quantity: 08
46

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Excavator with Rock


Breaker
EX-200
Quantity: 07
Excavator
TATA HITACHI EX-70
Quantity: 05
Excavator
TATA HITACHI EX-110
Quantity: 04
Excavator
TATA HITACHI EX-200
Quantity: 04
EXCAVATOR
SANY SY-140
Quantity: 05

Soil Compactor
I.R / Escorts
Capacity: 10 TON
Quantity: 03
47

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Vibro Stone
Column
130 kw Capacity, can
install Stone Column of
depth upto 25 Mtr.
Top feed, bottom feed
Quantity: 04

Back Hoe Loader


JCB
Quantity: 08
48

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Concrete Boom
Placer
Putzmeister
Capacity: 36 Meters Length
Quantity: 10

Dumper / Hywa
TATA
Quantity: 08
49

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Hydra
Escorts
Capacity: 12-14 Tons
Quantity: 10
Hydra
Escorts
Capacity: F-15
Quantity: 06
Hydra
Escorts
Capacity: K-10
Quantity: 03
Milling Machine
Capacity : W100 /W100H
Quantity : 04
50

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Vibro Hammer
Capacity : PTC30H1A,
ICE/FAV 416L
Quantity : 03

Concrete Paver
WIRTGEN
Capacity : SP25
Quantity : 02
51

SUNTECH OWNED EQUIPMENTS


We have some high end equipment, here’s a list of it

Impact Hammer
Starke
Capacity: 14 Tons
Quantity: 01

Crawler Crane
P&H / Grove / TIL/
Zoomlion/Sany
Capacity: Up to 70 Tons
Quantity: 12
Thank you.

601, Gopal Heights (D-9), Netaji Subhash Place,


Pitampura, New Delhi – 110034
Call +91 11 47057766/40
Fax +91 11 47047766
Mobile : +91 9871281838
: info@suntechinfra.com : www.suntechinfra.com

You might also like