C-01_CEILING TILE 60x60 cm to the architect by any discrepancies before the commencement of
any work.
5 1 : 10
5. The contractor will be responsible for all setting out.
6. The contractor is deemed to have checked the design.
7. The contractor is to provide shop drawings of all systems for
approval by the consultant before commencing any work.
8. The contractor shall confirm the line out of the design prior to the
commencement of work.
9. The contractor shall coordinate with elevator contractor for size of
shafts. Pit depths, override dimension, prior to execution of work.
10. All ceiling levels show the actual ceiling height.
11. All materials and finishes shall be submitted to the supervising
office for approval before installation.
12. All building levels are based on an assumed datum of ±0.00 at the
floor finished level of external walkway at the existing main
entrance.
AMC
GARDEN MALL
ADJUSTABLE CEILING
HANGER
ISOLATION CLIP
LEAD CONSULTANT:-
FURRING CHANNEL
FLS CONSULTANT:- KITCHEN CONSULTANT:-
900
DRAWING TITLE
12.5 mm PLASTERBOARD
METAL STRUCTURE
ACOUSTIC CEILING TYPES
ADJUSTABLE CEILING
HANGER