You are on page 1of 1

***** API650.XLS ***** Ver 2.

3 38250
TK name with prefix TK
Project : File : T Units : Metric
Line No : By :
Nozzle : N3 Tank: Date : Rev : A

Tank and Nozzle Information:


Tank Diameter : 2R : 21000.00 mm Fr : N
Tank Thickness: T: 4.7600 mm Ml : N.m
Corrosion Allowance : CA : 0.0000 mm Mc : N.m
Liquid Height : H: 19280.00 mm
Liquid Specific Gravity: G: 1.000 Design Temperature : 21.00 deg C
Nozzle Height : L: 591.00 mm Installed Temperature: 21.00 deg C
Nozzle Nominal Dia : : 18 in Re-pad Thickness (tp) : 0.000 mm
Nozzle Outside Dia : D: 457.2 mm Re-pad O.D (d) : 0.000 mm

Calculation : Imperial unit is used for the calculation L must be within 1.65Sqrt(Rt) for valid result:
a= 9 in R/t = 2205.882 Sqrt(Rt)= 8.802 14.52
R = 413.386 in a/R = 0.0218 alpha1 = 6.410E-06 Mean thermal coef:
t= 0.187 in L/2a = 1.293 alpha0 = 6.410E-06 #DIV/0!
Bulging = 0.84612 in Thermal = 0 in
b = 1.285/sqrt(Rt) W = 0.84612 in q = 0.00614957 radians,
bL = 3.3970 21.49145 mm 0.35234453 degrees
E = 29,500,857 psi b= 0.1460 1/in (positive angle rotat'n up, negative down)
Coef. Used
Xa = 32.268 in Xa/sqrt(Rt) = 3.666 1-0.75Xa/sqrt(Rt) = -1.750 0.100
Xb = 14.268 in Xb/sqrt(Rt) = 1.621 1-0.75Xb/sqrt(Rt) = -0.216 0.100
Xc = 23.268 in Xc/sqrt(Rt) = 2.644 1-0.75Xc/sqrt(Rt) = -0.983 0.100

l= 1.023 = a/sqrt(Rt) Yf = 0.964 (l/2Yf)(Fr/Fp)= 7.844E-05 Fr = 0


Pressure: 26.57 psi Yl = 2.378 (l/aYl)(Ml/Fp)= 7.067E-06 Ml = 0
Fp = 6761.27 lbs Yc = 2.031 (l/aYc)(Mc/Fp)= 8.274E-06 Mc = 0

Kr = 6.57E-06 E(2a) = Kr = 3,487 lbs/in = 6,107 N/cm


3
Kl = 5.07E-06 E(2a) = 871,617 in.lb/rad Kl = 15,213 in.lb/deg = 1,719 N.m/deg
3
Kc = 2.71E-06 E(2a) = 466,903 in.lb/rad Kc = 8,149 in.lb/deg = 921 N.m/deg

Combined Movement with Applied Load Load Allowable


Wr = 0.84612 in Load Allowable for given Fr, Ml, Mc when Ml, Mc, Fr = 0
21.49145 mm Fr : 5,671 N -56,708 N 5,671 N
ql = 0.352345 degree Ml : 1,599 N.m -1,599 N.m -1,599 N.m
qc = 0 degree Mc : 1,366 N.m 1,366 N.m
1 1
Nomograph for Checking Nomograph for Checking
0.8 Fr & Ml Fr & Mc
0.6 0.8

0.4
0.6
0.2

0
-1 -0.8 -0.6 -0.4 -0.2 0 0.2 0.4 0.6 0.8 1 0.4
-0.2

-0.4
0.2
-0.6

-0.8
0
-1 -1 -0.8 -0.6 -0.4 -0.2 0 0.2 0.4 0.6 0.8 1

Tables for Stiffness Coefficients for Reinforcement on Shell: FOR R/t = 2206
Kr, FOR REINFORCEMENT ON SHELL, Fig P-2A & P-2D @a/R = @L/2a =
L/2a a/R Kr/E2a m c R/t=400 R/t=2000 LOG ratio 0.0218 1.293
1 0.005 1.11E-04 -2.550 4.569 8.60E-03 1.42E-04 -1.363 1.49E-05 Log ratio
0.020 1.67E-05 -1.978 1.838 4.90E-04 2.03E-05 -0.600 1.59E-05 -0.724
0.040 1.10E-05 -1.832 1.170 2.52E-04 1.32E-05 1.59E-05
1.5 0.005 7.64E-05 -2.223 3.316 3.40E-03 9.50E-05 -1.315 1.10E-05
0.020 1.24E-05 -1.983 1.723 3.65E-04 1.50E-05 -0.489 1.18E-05 Kr =
0.040 8.80E-06 -1.706 0.649 1.62E-04 1.04E-05 1.18E-05 1.32E-05
E(2a)
Kl, FOR REINFORCEMENT ON SHELL, Fig P-2B & P-2E @a/R = @L/2a =
3
L/2a a/R Kl/E2a m c R/t=400 R/t=2000 LOG ratio 0.0218 1.293
1 0.005 1.65E-04 -2.323 3.984 8.70E-03 2.07E-04 -1.497 1.82E-05 Log ratio
0.020 2.07E-05 -2.012 2.042 6.42E-04 2.52E-05 -0.616 1.96E-05 -0.262
0.040 1.35E-05 -1.602 0.485 2.08E-04 1.58E-05 1.96E-05
1.5 0.005 1.68E-04 -2.303 3.926 8.59E-03 2.11E-04 -1.603 1.59E-05
0.020 1.83E-05 -1.997 1.937 5.52E-04 2.22E-05 -0.392 1.77E-05 Kl =
0.040 1.39E-05 -1.552 0.333 1.97E-04 1.62E-05 1.77E-05 1.84E-05
3
E(2a)
Kc, FOR REINFORCEMENT ON SHELL, Fig P-2C & P-2F @a/R = @L/2a =
L/2a a/R Kc/E2a3 m c R/t=400 R/t=2000 LOG ratio 0.0218 1.293
1 0.005 3.33E-04 -2.617 5.271 2.90E-02 4.30E-04 -2.536 7.97E-06 Log ratio
0.020 9.89E-06 -2.309 2.717 5.10E-04 1.24E-05 -0.996 9.09E-06 -1.289
0.040 4.96E-06 -1.944 1.194 1.37E-04 6.00E-06 9.09E-06
1.5 0.005 1.76E-04 -2.885 5.891 2.42E-02 2.33E-04 -2.425 4.95E-06
0.020 6.09E-06 -2.090 1.774 2.16E-04 7.47E-06 -1.436 5.39E-06 Kc =
0.040 2.25E-06 -1.941 0.841 6.18E-05 2.72E-06 5.39E-06 6.53E-06
E(2a)3
Tables for Stiffness Coefficients for Reinforcement on Nozzle Neck :
Kr, FOR REINFORCEMENT ON NOZZLE NECK, Fig P-2G & P-2J @a/R = @L/2a =
L/2a a/R Kr/E2a m c R/t=400 R/t=2000 LOG ratio 0.0218 1.293
1 0.005 6.58E-05 -2.594 4.491 5.52E-03 8.49E-05 -1.546 6.77E-06 Log ratio
0.020 7.72E-06 -2.115 1.961 2.86E-04 9.50E-06 -0.694 7.28E-06 -0.402
0.040 4.77E-06 -1.864 0.910 1.15E-04 5.73E-06 7.28E-06
1.5 0.005 4.59E-05 -2.560 4.220 3.63E-03 5.90E-05 -1.386 5.98E-06
0.020 6.73E-06 -2.111 1.884 2.47E-04 8.27E-06 -0.984 6.19E-06 Kr =
0.040 3.40E-06 -2.036 1.340 1.10E-04 4.15E-06 6.19E-06 6.57E-06
E(2a)
Kl, FOR REINFORCEMENT ON NOZZLE NECK, Fig P-2H & P-2K @a/R = @L/2a =
3
L/2a a/R Kl/E2a m c R/t=400 R/t=2000 LOG ratio 0.0218 1.293
1 0.005 9.74E-05 -2.550 4.514 7.57E-03 1.25E-04 -2.108 4.38E-06 Log ratio
0.020 5.24E-06 -2.468 2.970 3.54E-04 6.67E-06 -1.073 4.78E-06 0.225
0.040 2.49E-06 -2.074 1.331 8.59E-05 3.05E-06 4.78E-06
1.5 0.005 9.93E-05 -2.671 4.929 9.50E-03 1.29E-04 -2.070 4.72E-06
0.020 5.63E-06 -2.309 2.469 2.90E-04 7.06E-06 -0.850 5.24E-06 Kl =
0.040 3.12E-06 -1.813 0.556 6.90E-05 3.73E-06 5.24E-06 5.07E-06
E(2a)3
Kc, FOR REINFORCEMENT ON NOZZLE NECK, Fig P-2I & P-2L @a/R = @L/2a =
3
L/2a a/R Kc/E2a m c R/t=400 R/t=2000 LOG ratio 0.0218 1.293
1 0.005 2.09E-04 -3.009 6.379 3.55E-02 2.80E-04 -2.930 2.80E-06 Log ratio
0.020 3.59E-06 -2.644 3.397 3.28E-04 4.65E-06 -2.001 3.03E-06 -0.427
0.040 8.96E-07 -2.543 2.455 6.89E-05 1.15E-06 3.03E-06
1.5 0.005 1.44E-04 -2.861 5.724 1.90E-02 1.90E-04 -2.790 2.37E-06
0.020 3.00E-06 -2.677 3.429 2.90E-04 3.90E-06 -1.930 2.55E-06 Kc =
0.040 7.87E-07 -2.443 2.064 5.10E-05 1.00E-06 2.55E-06 2.71E-06
3
E(2a)

API 650 (Modified) - N3, printed: 2021-10-14 API-650, Appendix P Page 1

You might also like